英文部分
1.Amice, CIMOSA: Open System Architecture for CIM, 2nd edition, Berlin: Springer-Verlag.,1993
2.Archibald, Russell D., Managing High-technology Program and Projects, New York, NY: John Wiley & Sons, 1976.
3.Armen, Z. & Andrew, K., “Process analysis and reengineering”, Computers and Industrial Engineering, 41(2):135-150. ,2001
4.Balachandra, R. and Friar, J. H. “Factors For Success In R&D Projects And New Product Innovation: A Contextual Framework”, IEEE Transactions on Engineering Management, Vol. 44, No. 3, pp. 276-287.,1997
5.Booz, Allen, & Hamilton, New Product Management for the 1980’ s, NY: Booz, Allen and Hamilton, Inc., 1982
6.Cleland, D. I., King, W. R., Systems Analysis and Project Management, McGraw-Hill, New York, 3rd ed, 1983.
7.Cooper, R. G., Edgett, S. J., Kleinschmidt, E. J., “Portfolio Management for New Products”, Perseus Books, p.53. , 1998
8.Desrochers, A. A. & Al-Jaar, R. Y. , Applications of Petri Nets in Manufacturing Systems: Modeling, Control, and Performance Analysis, New York: IEEE Press.,1995
9.Dorador, J. M. & Young, R. I. M., “Application of IDEF0, IDEF3 and UML methodologies in the creation of information models”, International Journal of Computer Integrated Manufacturing, 13(5):430-445.,2000
10.Gingele, J., Childe, S. J. & Miles, M. E., “A modelling technique for re-engineering business processes controlled by ISO 9001”, Computers in Industry, 49:235-251.,2002
11.GLM Team, “SLP Product Definition & Structure”, Internal Document, OLETechnology Co., Ltd. ,2003
12.GLM Team, “Analysis Document, Prepared for Pro Arch Technology”, InternalDocument, OLE Technology Co., Ltd. ,2003
13.Gobeli, D. H. and Brown D. J. "Analyzing Product Innovations", Research Management, pp.25-31. , May-Aug 1987
14.Henderson, R. M. and Clark, K. B., “Architectural Innovation: Reconfiguration of Existing Product Technologies and the Failure of Established Firms”, by Burgelman et al, “Strategic Management of Technology and Innovation”, 3rd ed., pp. 448-455. , 2001
15.Jeng, M. D. & Chen, S. C. , “A heuristic search approach using approximate solutions to petri nets state equations for scheduling flexible manufacturing systems”, International Journal of Flexible Manufacturing Systems,10:139-162.,1998
16.Karl T. Ulrich and Steven D. Eppinger , Product Design and Development, McGraw Hill Company.,2000
17.Kerzner, H., Project Management: A System Approach to Planning, Scheduling and Controlling, 2nd ed. New York: Van Nostrand Reinhold Co. Inc. 1984
18.Kim, C-H., Weston, R. H., Hodgson, A. & Lee, K-H. , “The complementary use of IDEF and UML modelling approaches”, Computers in Industry, 50:35-56.,2003
19.Kim, S-H. & Jang, K-J., “Designing performance analysis and IDEF0 forenterprise modeling in BPR”, International Journal of Production Economics, 76(2):121-133.,2002
20.Kleinschmidt, E. J., and Cooper, R. G., “The Impact of Product Innovativeness on Performance”, Journal of Product Innovation Management, Vol.9, pp.240-251. , Nov 1991
21.Kotler, P,〝Marketing management〞,10th Edition, Prentice Hall, PP467-468. ,2000
22.Lee, D. Y. &, Dicesare, F. , “Scheduling flexible manufacturing systems using Petrinets and heuristic search”, IEEE Transactions on Robotics and Automation, 10:123-132.,1994
23.Liang G. R. and Hong S. Y., “ Integrated of IDEF technologies In CIM: IDEF0 and IDEF1X,” Journal of the Chinese Institute of Industrial Engineers, Vol. 15, No. 1, pp. 83-94. , 1998
24.Luh,Y. P. and Luh, Y. P., “Order-Planning Model Based on the Values of Capacityand Inventory”, International Journal of Electronic Business Management, pp.146-151. , 2003
25.Mayer. R. J.、Cullinane.T. P.、DeWitte. P. S、Knappenberger. W. B.、Perakath. B.、Wells. M. S.,「Information Integration for Concurrent engineering (IICE) IDEF3 Process Description Capture Method Report」,AL-TR-1992-0057, Armstrong Laboratory, Wright-Patterson AFB,OH, 1992
26.Meredith, J. R. and S. I. Mantel, Project Management, John Wiley & Sons, Inc., New York.,1998
27.Pinto, J. K., and D. P. Slevin. “Critical Factors in successful Project Management,” IEEE Transactions on Engineering Management, February 1987.
28.Reeser, C., Management: Function and Modern Concepts, Foresman and Company, Scott.,1973
29.Rothwell R., Freeman C., Horlsey A., Jervis V.T.P., Robertson A. B. and Townsend J., “SAPPHO Updated-Project SAPPHO PhaseⅡ,” Research Policy, Vol. 3, pp.258-291. , 1974
30.Souder, W. E. and Song X. M., “Contingent Product Design and Marketing Strategies Influencing New Product Success and Failure in U.S. and Japanese Electronic Firms,” Journal of Product Innovation Management, pp.12-21.,1997
31.Tatsiopoulosa, I.P., Panayiotoua, N.A. & Ponis, S. T. , “A modeling and evaluation methodology for e-commerce enabled BPR”, Computers in Industry, 49:107-121.,2002
32.Toh, K. T. K , “Modelling architectures: a review of their application in structured methods for information systems specification”, International Journal of Production Research, 37(7):1439-1458.,1999
中文部分
1.Cooper, R. G.,新產品完全開發手冊,遠流,2000
2.「中山科學研究院航空研究所轉委託經濟部科技專案計畫:企業資訊整合環境系統架構報告」,歐磊科技股份有限公司,2002
3.中華民國海關進出口統計年報,2005
4.中國紡織工業研究中心,紡織工業年鑑,台北,經濟部技術處,2005
5.王慶富,「專案管理」,聯經出版事業公司,1999
6.宋文娟、黃振國等譯(Jack Gido. James P.Clements原著),「專案管理(Successful Project Management)」,滄海書局,2001
7.李信宏,紡織速報,2002年台灣紡織產業回顧與展望,第123 期,中國紡織工業研究中心,pp.5-15,2003
8.何介人,「台灣紡織產業現況與展望」,紡織速報,第105 期,第3∼27 頁,20019.林晏丞,碩士論文,「全球資訊管理系統之基礎架構─在供應鏈管理與電子交易市集上的應用」,國立台灣大學機械工程學研究所,200110.吳孟峰,碩士論文,「製造業生產管理之資訊系統實作」,國立台灣大學機械工程學研究所,200211.紡拓會全球資訊網,http://news.textiles.org.tw/,2006.1.23
12.陳水泉,碩士論文,「IDEF0整合性製造資料模式轉換成製造執行系統之資訊模式的探討」,國立交通大學工業工程所,199613.陳育仁,碩士論文,「企業系統開發與導入之知識管理方法與系統架構研發」,國立成功大學製造工程研究所,200014.陳進來,「變局中的紡織業經營管理策略」,紡織月刊,第58 期,第40∼45 頁,2001。15.陸元平,「商業模型建構法」,第十三屆全國自動化科技研討會,台灣‧台北,2004
16.陸元平、陳儒建、胡家翔,「整合性專案管理─以傢飾紡品新產品開發為例」, 第四屆精密機械製造研討會,臺灣‧台北,2004
17.陸元平、陸一平,「製造業之需求預測與生產規劃模型」,第二十屆機械工程研討會論文集,臺灣‧台北,2003
18.連慶憲,碩士論文「e協同合作經營模式建構之研究-以紡織產業為例」,台灣科技大學,200319.詹仲豪,碩士論文「如何提升傳統產業競爭力以紡織工業為例」,文化大學,2001。20.張光旭,「應用IDEF0方法分析產品研發流程之研究」,台北科技大學學報第三十四之二期,200121.熊培霖、吳俊德、蘇佳慧等譯(Project Management Institutes原著),「專案管理知識體系導讀指南」,博頡策略顧問股份有限公司,2002
22.鍾志明,博士論文「新產品發展過程之資源配置與績效之關係-以我國製造業為例」,國立政治大學企業管理學系,1998