1.Box, G. E. P. and Hunter, J. S. (1957), “Multifactor Experimental Designs for Exploring Response Surfaces”, Annals of Mathematical Statistics, Vol.28, No.1, pp. 195-242.
2.Cunningham, J. A. (1990), “The Use and Evaluation of Yield Models in Integrated Circuit Manufacturing”, IEEE Transactions on Semiconductor Manufacturing, Vol.3, No.2, pp. 60-71.
3.Daniel, V., and Guide Jr., R. (1995) “Simulation Model of Drum-Buffer-Rope for Production Plan and Control at a Naval Aviation Depot,” Simulation, Vol.65, No.3, pp.157-168.
4.Delp, D., Si, Y. J., Hwang, Y., Pei, B., and Fowler, J. (2005), “Availability-adjusted X-factor,” International Journal of Production Research, Vol.43, No.18, pp.3933-3953.
5.Donald P. Martin (1998), “The Advantages of Using Short Cycle Time Manufacturing Instead of Continuous Flow Manufacturing”, Proceedings of IEEE/ SEMI Advanced Semiconductor Manufacturing Conference (ASMC), pp. 43-49.
6.Gardiner, S. C., Blackstone Jr, J. H., and Gardiner, L. R. (1993), “Drum-Buffer-Rope and Buffer Management: Impact on Production Management Study and Practices”, International Journal of Operation and Production Management, Vol.13, No.6, pp.68-78.
7.Goldratt, E. M. and Cox, J., (1992) “The Goal: A Process of Ongoing Improvement”, NY: North River Press.
8.Goldratt, E. M., and Rebert, E. F. (1986), “The Goal”,2nd revised edition, NY: North River Press.
9.Hickie, M. and Fowler, J. W. (1999). “Ancillary Effects of Simulation”, Proceedings of Winter Simulation Conference, pp.754-758.
10.Hsieh, M. Y. and Hsieh, M. H. (2001), “Time Constraint Simulation to Reduce Fab Bottleneck Machine Cycle Time”, Proceedings of Chinese Institute of Industrial Engineers Conference.
11.Lawrence, S. R., and Buss, A. H. (1994), “Shifting Production Bottlenecks: Causes, Cures, and Conundrums”, Production and Operations Management, Vol.3, No.1, pp. 21-37.
12.Montgomery, D. C. (2001), “Design And Analysis of Experiments”, WILEY.
13.Riezebos, J., Korte, G. J. and Land, M. J. (2003), “Improving a Practical DBR Buffering Approach Using Workload Control,” International Journal of Production Research, Vol.41, No.4, pp.699-712.
14.Robinson, J.K. (1998), “Capacity Planning for Semiconductor Wafer Fabrication with Time Constraints between Process Steps”, Graduate School of The University of Massachusetts Amherst in Partial Fulfillment of The Requirements for The Degree of Doctor of Philosophy.
15.Robinson, J.K., Giglio, R. (1999), “Capacity Planning for Semiconductor Wafer Fabrication with Time Constraints Between Operations”, Proceedings of The Winter Simulation Conference, pp.880-887.
16.Scholl, W. and Domaschke, J. (2000), “Implementation of Modeling And Simulation in Semiconductor Wafer Fabrication with Time Constraint Between Wet Etch And Furnace”, IEEE Transactions on Semiconductor Manufacturing, Vol. 13, No.3, pp.273-277.
17.Schragenheim, E., and Ronen, B. (1990), “Drum-buffer-rope shop floor control,” Production and inventory management, Vol.31, No.3, pp.18-22.
18.Shang, J. S., and Tadikamalla, P. R. (1993), “Output maximization of a CIM system:simulation and statistical approach”, International Journal of Production Research, Vol. 31, No.1, pp.19-41.
19.Sivasubramanian, R., Selladurai, V. and Rajamramasamy, N. (2000), “The Effect of the Drum-Buffer-Rope (DBR) Approach on Performance of a Synchronous Manufacturing System (SMS),” Production Planning & Control, Vol. 11, No.8, pp.820-824.
20.Sridharan, V., William, L. B., and Udayabhanu, V. (1992), “Freezing the master production schedule under rolling planning horizon,” Management Science, Vol. 33, No.9, pp. 1137-1149.
21.Stevenson, W. J. (2002), “Operations Management”, McGraw-Hill, Irwin.
22.Tu, Y.M., and Li, R.K. (1998), “Constraint Time Buffer Determination Model”, International Journal of Production Research, Vol.36, No.4, pp.1091-1103.
23.Uzsoy, R., Lee, C. Y. and Martin-Vega, L. A (1992), “A Review of Production Planning and Scheduling Models in Semiconductor Industry, Part I: System Characteristics, Performance Evaluation and Production Planning,” IIE Transactions Scheduling Logistics, Vol. 24, No.4. pp. 47–61.
24.吳健鳴 (2005),「晶圓製造廠考慮等候時間限制之產能規劃研究」,中原大學工業工程研究所碩士論文。25.吳鴻輝,李榮貴 (2000),「限制驅導式現場排程與管理技術」,全華科技圖書股份有限公司。
26.杜瑩美,劉采風 (2005),「時間限制下晶圓廠批量機台之現場管控模式」,中國工業工程學會九十三年度學術研討會論文。
27.林忠文 (2004),「晶圓製造廠連續型時間限制問題之產能決策模式」,中華大學科技管理研究所碩士論文。28.張逸輝 (2004),「晶圓廠模擬模式之建立與分析」,成功大學製造工程研究所碩士論文。29.覃禹華 (2005),「2005半導體工業年鑑」,工硏院產業經濟與資訊服務中心。
30.黃英鈺 (2005),「晶圓製造廠內時間限制機台之現場管控模式」,中華大學科技管理研究所碩士論文。31.蔡啟聰 (1996),「晶圓製造廠考慮等候時間限制之派工策略」,交通大學工業工程與管理研究所碩士論文。32.戴瑞德 (2002),「晶圓製造廠系統化設施規劃」,中原大學工業工程研究所碩士論文。33.羅文雄,蔡榮輝,鄭岫盈 譯 (2003),Quirk, M. and Serda, J. 著,「半導體製造技術」,滄海出版社。