參考文獻
[1]Houlihan, J.B., Supply Chain Management, Proceedings of the 19th International Technical Conference of the British Production and Inventory, 1984.
[2]Christopher,M., Logistics and Supply Chain Management: Strate for Reducing Costs and Improving Service,Pitman, London, 1992.
[3]David F. Ross, Competing through Supply Chain Management: Creating Market-Winning Strategies Through Supply Chain Partnership, London: Chapman&Hall, 1997.
[4]Cooper, R. G., Perspective: Third-Generation New Product Processes, Journal of Product Innovation Management, Vol.11, pp.3-14, 1994.
[5]Bloomberg, David J., Adrian Murray, and Joe B. Hanna, The Management of Integrated Logistics, 2d ed. Sydney: Prentice-Hill of Australia Pt. Ltd., 1998.
[6]Johnson, J. and Mattson, L. G., Interorganizational Relations in Industrial Systems: A Network Approach Compared with the Transactional Cost Approach, International Studies of Management and Organization, Vol.ⅩⅧ, No.1, pp.34-48, 1987.
[7]Frentzel, D. G. & Sease, G. J., Logistics Taking Down the Walls. Annual Conference Proceedings, CLM, pp.643-654., 1996.
[8]Silver, E. A. et al., Inventory Management and Production Planning and Scheduling, 3’rd ed., Wiley Press, 1998.
[9]Axsater, S., Simple solution procedures for a class of two-echelon inventory problems, Operations Research, Vol. 38, pp.64-69, 1990a.
[10]Axsater, S., Modeling emergency lateral transshipments in inventory system, Management Science, Vol. 36, pp. 1329-1338, 1990b.
[11]Tagaras G., Cohen M.A., Pooling in two-location inventory inventory systems with non-negligible replenishment lead time, Management Science, Vol.38, pp.1067-1083, 1992.
[12]Avijit Banerjeea, Jonathan Burtonb, Snehamay Banerjeec, A simulation study of lateral shipments in single supplier, multiple buyers supply chain networks, Int. J. Production Economics, pp.81–82, 103–114, 2003.
[13]Herer, Y. T., and Tzur, M., The dynamic transshipment problem, Naval Research Logistics, Vol. 48, pp. 386-408, 2001.
[14]Zeigler, B.P., “Theory of the Modeling and Simulation”, John Wiley and Sons, New York, 1976.
[15]Towill, D.R., “Supply Chain Dynamics,” Industrial Journal of Computer Integrated Manufacturing, Vol.4, No.4, pp.197-208,1991.
[16]Reichelt, K., and Lyneis, J., “The use of simulation to unravel the detailed complexities of projects and project management,” System Dynamics in Economic and Financial, Vol.5, pp.78-87. 1998.
[17]Hafeez, K., Griffiths, M., Griffiths, J., and Naim M. M., “Systems design of a two-echelon steel industry supply chain” International Journal of Production Economics, Vol.45, pp.121-130, 1996.
[18]Lee HL. A multi-echelon inventory model for repairable items with emergency lateral transshipments. Management Science, pp.1302±16, 1987.
[19]Law, A. M., and Kelton, W. D., “Simulation Modeling and Analysis,”McGraw-Hill, Second Edition, 1991.
[20]Banks, J., Carson, J., and Nelson B.“Discrete-Event System Simulation”, Prentice Hall,Inc.,New Jersey, 1995.
[21]張有恒,「物流管理」,華泰文化事業公司,1998。
[22]張煦逸,民國八十一年,「進銷存系統之建立與實務之應用」,碩士論文,國立中興大學企業管理研究所。[23]許宏熙,民國八十九年,「供應鏈理論應用於營建物料規劃之研究-以預鑄廠鋼筋材料為例」,碩士論文,台灣大學土木工程研究所。[24]江靜芳,民國八十九年,「精簡營建於預拌混凝土供應鏈應用之研」,碩士論文,國立中央大學土木工程研究所。[25]林蔚菁,民國九十一年,「系統模擬於鋼筋供應鏈管理之研究」,碩士論文,朝陽科技大學營建工程系。[26]潘乃欣、楊明山,民國八十八年,「存貨理論在營建專案物料採購計劃之應用」,第一屆營建管理學術研討會,台灣科技大學。
[27]林則孟,”系統模擬理論與應用”,滄海書局,2001。
[28]林宏澤、林清泉,民國八十年,「系統模擬」,高立圖書有限公司,台北,1991。