中文部分
1.白光華,創新協同產品研發-PDM 應用實務,2003,中國生產力中心,台北。
2.陳銘崑,2004,”OEM接單型態下電子化協同設計參考模式之研究, Journal of the Chinese Institute of Industrial Engineers”, Vol. 21, No. 4, pp. 395-408
3.經濟部「資訊業電子化AB計畫」結案報告,2002
4.吳琮璠,1997,”資訊管理個案研究方法”,資訊管理學報第四卷第一期英文部分
1.Aberdeen Group ,Collaborative Product Commerce ,http://www.aberdeen.com.
2.Asanuma, B./T. Kikutani ,1992, "Risk Absorption in Japanese Subcontracting: A Microeconometric Study of the Automobile Industry", The Journal of the Japanese and International Economies 6, pp. 1-29.
3.Asanuma, Banri,1998, "Manufacturer-Supplier Relationships in Japan and the Concept of RelationSpecific Skill," The Journal of the Japanese and International Economies, 1989, 3, 1-30.
4.Bensaou, M.,1999,: Portfolios of Buyer-Supplier Relationships. Sloan Management Review Summer, 35-44
5.Bidault, F., C. Despres , C. Butler ,1998,. Leveraged Innovation Unlocking the Innovation Potential of Strategic Supply. Macmillan, London.
6.Bill Hakanson,2000,Design-Chain Council Established as a Special Interest Group within the Supply-Chain Council - Focus on Design Chain Issues and the Design-Chain Operations Reference-Model,http://www.supply-chain.org/
7.Charles H. Fine and Daniel E. Whitney, MIT Working Paper, "Is the Make-Buy Decision Process a Core Competence ?",April 1996.
8.Clark, K.B. ,1989, Project Scope and project performance: the effects of parts strategy and supplier involvement on product development, Management Science, 35, 10, 1247-1263.
9.Cooper, R. G. ,1994,Perspective: Third Generation New Product Process, Journal of Production Management (11), 1994, 3-14
10.Datamonitor, 2005,"Global Motorcycle Manufacturers" , http://www.researchandmarkets.com
11.Davidow W. , Malone M. 1992, The Virtual Corporation, Harper Collins.
12.Deloitte Research Group ,2001, http://www.deloitte.com/
13.DeSanctis Gerardine, Monge Peter,1999,"Introduction to the Special Issue:Communication Processes for Virtual Organizations", Organization Science Vol.10,No.6, pp 693-703, November-December, 1999
14.Dyer, J.H. ,1997," Effective interfirm collaboration: How firms minimize transaction costs and maximize transaction value", Strategic Management J. 18(7) 535-556.
15.Dyer, JH, 1996,"Specialized Supplier Networks as a Source of Competitive Advantage", Strategic Management Journal, 17: 55-83.
16.Ferguson, Ch. H. and Ch. R. Morris, 1994, Computer Wars: the Fall of IBM and the Future of Global Technology, New York: Times Books.
17.Huang, C. J., Trappery, A., Yao, Y. H. ,2003, "Collaborative design , collaborative product commerce, configuration management, workflow management", Journal of the Chinese Institute of Industrial Engineers, Vol. 20,No. 4
18.Jinwoo Kim,1999, "Hierarchical Structure of Intranet Functions and Their Relative Importance: Using the Analytic Hierarchy Process for Virtual Organizations", Decision Support Systems, Volume: 23, Issue: 1, pp.59-74
19.Lee, D.L. and Chen, Y.M.,1996, "Integrated Product and Process Data Management", Integrated Computer-Aided Engineering, 13, 1-4 .
20.Leonard-Barton, D.,1992," Core capabilities and core rigidities: A paradox in managing new product development. "Strategic Management Journal 13: 111-125
21.Monczka, R.M., Trent, R.J., Callahan, T.J., 1994. "Supply base strategies to maximize supplier performance." International Journal of Physical Distribution and Logistics 23 (4), 42-54.
22.O'Grady, P. and Chuang, W. C.,2001, "Research issues in e-commerce and product development" , Cybernetics and Systems, Vol. 32, No. 7, pp.775-786.
23.Paul Schonseleben, Dr. (Prof), 2000,"With agility and adequate partnership strategies towards effective logistics networks",Computers in Industry, Volume: 42, Issue: 1, pp.33-42, June
24.Prasad,Biren,1996,"Concurrent Engineering Fundamentals-Integrated Product and Process Organization", Prentice Hall,New Jersey.
25.Simchi-Levi, David., Kaminsky, Philip., and Simchi-Levi, Edith.,2000, "esigning and Managing the Supply Chain -Concepts, Strategies, and Case Studies", McGraw-Hill Higher Education, New York.
26.Strader, Troy J.; Lin, Fu-Ren; Shaw,Michael J.,1998, "Information infrastructure for electronic virtual organization management",Decision Supprt Systems, Volume: 23, Issue: 1,May, 1998, pp. 75-94
27.Supply-Chain Council ,2004 Supply-chain operations reference model ,version 6.0. Supply-Chain Council, Pittsburgh, PA
28.Supply-Chain Council ,2004, Design-Chain Special Interest Group ,Design-Chain Operations Reference-model (DCOR) 1.0 .
29.Twigg, D. ,1995 ,'Design Chain Management: Inter-organisational Co-ordination of Product Development in the UK Automotive Industry", Doctoral Thesis, University of Warwick
30.Wang, L., Shen, W., Xie, H., Neelamkavil, J., Pardasani, A. ,2002,"Collaborative conceptual design-state of the art and future trends" , Computer-Aided Design, Vol. 34, Iss. 13, pp. 981-996.
31.Yin, R. K.,1994, "Case Study Research, Design and Methods (2nd ed.)", Sage Publications, Newbury Park, CA, Merriam, S. B.,1988,"Case study research in education". Thousand Oaks, CA: Jossey-Bass.
32.Stake, R. E. ,2000, "Case studies" In N. K. Denzin, & Y. S. Lincoln, (Eds.). Handbook of qualitative research (2nd ed.). Thousand Oaks, CA: Sage.
網站部分
1.Supply-Chain Council , http:// www.supply-chain.org/