參考文獻
中文文獻
[1]向生平(2002)「軍心士氣影響下集中化序列攻擊策略-模式建構與參數估計」,國防管理學院國防決策科學研究所碩士論文。[2]李志華(2003)「基因演算法於震災路網搶修排程問題之研究」,成功大學交通管理科學系碩士論文。[3]周宗信(2005)「專案推移理論之修正與應用-以電腦伺服器維護人力排程問題為例」,國防管理學院國防決策科學研究所碩士論文。[4]陳燕良(2002)「營建作業流程電腦模擬-資源組合最佳化改良模式」,朝陽科技大學營建工程系碩士論文。[5]蔡政峰(2000)「求解有限資源專案排程問題最佳化之研究-以基因演算法求解」,成功大學工業管理學系碩士論文。[6]劉偉遠(2003)「汽電共生廠最佳機組排程研究」,大同大學電機工程研究所碩士論文。
英文文獻
[7]Nearchou, A. C. (2004), “The effect of various operators on the genetic search for large scheduling problems,” Production Economics, Vol. 88, pp.191-203.
[8]Bruzzone, A. G. and R. Signorile. (2000), “Simulation and genetic algorithms for ship planning and shipyard layout.” Simulation, Vol. 171, No.2, pp.74-83.
[9]Cheng, R. W. and M. Gen. (1997), “Parallel machine scheduling problems using memetic algorithms,” Computers & Industrial Engineering, Vol. 33, No. 3, PP.761-764
[10]Carnahan, B. J., M. S. Redfern and B. Norman. (2000), “Designing safe job rotation schedules using optimization and heuristic search” Ergonomics, Vol. 43, No. 4, pp.543-560.
[11]Carter, A. E. and C. T. Ragsdale. (2002), “Scheduling pre-printed newspaper advertising inserts using genetic algorithms,” Omega, Vol. 30, pp. 415-421.
[12]Cheng, T. M., H. T. Wu, Y. F. Ke., and C. W. Feng. (2002), “Applying Genetic Algorithms on the Computer Simulation for Improving Construction Productivity.” The Ninth International Conference on Computing in Civil and Building Engineering, April 3-5, Taipei, Taiwan.
[13]Chang, C. C., R. S. Chen., and J. Z. Shyu. (2006), “Project Advancement and Its Applications to A Case on Multi-Air-Route Quality Budget al.location,” Accepted Journal of Operational Research Society, (SSCI).
[14]Evolver, Newfield (1998), NY: Palisade Corporation, (www.palisade.com).
[15]Funda, S. S. and G. Ulusoy. (1999), “Parallel machine scheduling with earliness and tardiness penalties,” Computers & Operations Research Vol. 26, No.8, PP.773-787
[16]Glass, C. A., C. N. Potts and P. Shade. (1994), “Unrelated parallel machine scheduling using local search,” Mathematical and Computer Modeling, Vol. 20, No. 2, PP.41-52
[17]Holland, J. H. (1992), “Genetic Algorithms,” Scientific American, Vol. 267, pp.66-72.
[18]Liu, M. and C. Wu. (1999), “A genetic algorithm for minimizing the makespan in the case of scheduling identical parallel machines,” Artificial Intelligence in Engineering, Vol. 13, PP.339-403.
[19]Malmborg, C. J. (1996), “A genetic algorithm for service level based vehicle scheduling,” European Journal of Operational Research, Vol. 93, No. 1, pp.121-135.
[20]Maniezzo, V. and A. Colorni. (1999), “The ant system applied to the quadratic assignment problem,” IEEE Transactions on Knowledge and Data Engineering, Vol. 11, No. 5, pp.769-778.
[21]Paul, R. J., and T. S. Chanev. (1998). “Simulation Optimization Using a Genetic Algorithm.” Simulation Practice and Theory, Vol. 6, pp.601-611.
[22]Ponnambalam, S. G., H. Jagannathan, M. Kataria and A. Gadicherla, (2004), “A TSP-GA multi-objective algorithm for flow-shop scheduling,” International Journal of Advanced Manufacturing Technology, Vol. 23, pp.909-915.
[23]Wang, Y. Z. (2003), “Using genetic algorithm methods to solve course scheduling problems.” Expert Systems with Applications, Vol. 25, pp.39-50.