1.Abdulaziz A.Bubshait and Michael J. Cunningham, 2004, Management of Concurrent Delay in Construction, Cost Engineering, Vol. 46, No. 6, pp. 22-28.
2.Barry B. Bramble, Michael F. Donofrio, PE, John B. Stetson, IV, RA, 1990, Avoiding and Resolving Construction Claims, R.S. Means Company, INC.
3.Business Publishiers ,1993, Construction Claims Monthly Vol.15, No.10.
4.Business Publishiers, 2002, Construction Claims Monthly, Vol. 24, No. 3.
5.Charlton, Michael, 2001, Programme float and concurrent delay, Seminar entitled delays, Delays and Extension of Time, The Law & Practice in Singapore.
6.Contracts & Commercial Consultants, Concurrent Delay Reviewed, http://www.alway-associates.co.uk/legal-update/article.asp?id=24
7.David Weare, Partner, Davies Arnold Cooper, 2007, Contract journal ,Case Law analysis: Construction Act amendments, http://www.contractjournal.com/Articles/2007/07/11/55553/legal+q.html
8.George E Baram, 2000, The window methods of analyzing delay claims, AACE International Transactions.
9.Householder, Jerry L. and Ruland, Huland E., 1990, Who Owns float? ,Journal of Construction Engineering and Management, Vol.116, No.1, ASCE.
10.Apirath Prateapusanond, 2003, A Comprehensive Practice of Total Float Pre-Allocation and Management for the Application of A CPM-Based Construction Contract, Virginia Polytechnic Institute and State University, Doctor of Philosophy in Civil Engineering.
11.Jeremy Winter, 2002, Concurrent Delay - New Case Law, http://www.stevetennant.com/assets/Concurrent%20Delay%20New%20Case%20Law.pdf.
12.John R. Spittler, 2003, Analyzing Concurrent Delay when Using the Lean Approach to Scheduling, AACE International Transactions.
13.Jon M. Wickwire, Thomas J. Driscoll, Stephen B. Hurlbut, and Scott B. Hillman, 2005, Construction scheduling: preparation liability, and claims, second edition.
14.Mark Boe, 2004, Identifying Concurrent Delay, http://www.cpmiteam.com.
15.Paul Levin, 1998, Construction contract claims, changes & dispute resolution, Second edition, American Society of Civil Engineers (ASCE Press).
16.R.B. Reynolds and S.G. Revay , 2001, Concurrent Delay: A Modest Proposal, The Revay Report, Volume 20 ,Number 2.
17.Robert H. Robinson, 2006, Building Information Modeling, http://www.whi-inc.com/Comments/2006%20spring.pdf.
18.Sabah Alkass , Mark Mazerolle, and Frank Harris (1996), Construction Delay Analysis Techniques, Journal of Construction Engineering and Management, Vol.14, pp. 375-394.
19.Satish B Mohan, Khalid S Al-Gahtani, 2005, Current Delay Analysis Techniques and Improvements, AACE International Transactions, pg. PS201, 6 pgs.
20.Thomas F Peters, 2003, Dissecting the doctrine of concurrent delay ,AACE International Transactions.
21.Victor M. Ostrowski, and Michael T. Midgette, 2006, Concurrent Delay Analysis in Litigation, Cost Engineering, Vol. 48, No. 1, pp. 30-37.
22.中華民國商務仲裁協會,1996,仲裁案例選輯(Ⅰ)。
23.古嘉諄、陳希佳、顏玉明,2006,工程法律實務研析(二),顏玉明,營建工程工期問題之探討,p111-146,元照出版有限公司。
24.古嘉諄、陳希佳、顏玉明,2006,工程法律實務研析(二),李惠貞,展延工期增加費用相關問題,p147-184,元照出版有限公司。
25.行政院公共工程委員會,2000,公共工程發放趕工獎金實施要點總說明。
26.行政院公共工程委員會,2001,政府採購履約爭議處理案例彙編(一)。
27.行政院公共工程委員會,94年3月11日工程管字第09400081220號函分行,查核結果品質缺失懲罰性違約金機制常見問題及解答。
28.行政院公共工程委員會,2006,工程採購契約範本。
29.林金面,2002,營建管理學,文笙書局。
30.林曉瑩、黃麗蓉,2005,論業主與承商之共同遲延(上)(下),營建知訊,268期、269期。31.張嘉琪,2007,共同遲延責任分配之系統化分析方法,國立中央大學,碩士論文。32.郭斯傑、詹前輝,1995,浮時所有權及工程進度耽延責任歸屬之探討,國立台灣大學工程學刊,第85-100頁,民84.10. 6,第六十五期。
33.陳美伶、李太正、陳連順合著,2002,民法入門,元照出版公司。
34.黃立,2006,民法債編總論,第三版,元照出版有限公司。
35.鄭明龍,2003,營建工程遲延分析,國立高雄第一科技大學,碩士論文。