1.Adamus C. L. and M. J. Bergman, “Estimating Nonpoint Source Pollution Loads With GIS Screening Model”, Water Resources Bulletin, 1995.
2.Adema J. E., Application of the BASINS Model to Examine the Impacts of Urbanization on Watershed Hydrology, A Thesis Presented to the Faculty of the School of Engineering and Applied Science, University of Virginia, 1999.
3.Beck, M. “Water Quality Modeling: A Review of the Analysis of Uncertainty”, Water Resources Research, Vol. 23, No.8, pp.1939-1942, 1987.
4.Bicknell B. R., J. C. I mhoff, J. L Kittle., Jr. A. S., Donigian, Jr. and Johanson R. C., Hydrological Simulation Portranrogram F(HSPF)– User''s Manual for Version 11, U.S. EPA, National Exposure Research Laboratory Office of Research and Development, EPA/600/R-97/080, 1996.
5.Bowie, G. L., W. B. Mills, “Rates, Constant, and Kinetics Formulations in Surface Water Quality Modeling(second edition”), Environmental Research Laboratory Office of Research and Development U.S. Environmental Protection Agency , 1985.
6.Buchak, E. M. and J. E. Edinger, “ User Guide for LARM2 ”, U. S. Army Engineer Waterways Experiment Station, Hydraulies Laboratory, Instruction Report E-82-3, 1982.
7.Burges, S. J. and D. P. Lettenmaier, “Probabilistic methods in stream quality management”, Water Resources Bulletin, Vol.11, No.1, pp.115-130, 1975.
8.Chapra, S.C., “Total Phosphorous Model for Great Lakes”, J. Envir. Eng. Div., ASCE, Vol. 103, April, 1977.
9.Chapra, S. C. and K. H. Reckhow ,” Engineering Approaches for Lake Management, Vol. 1:Data Analysis and Empirical Modeling”, Butterworth Publishers, Woburn, Ma., 1983.
10.Chapra, S. C. and K. H. Reckhow,” Engineering Approaches for Lake Management Vol. 2:Mechanistic Modeling”, Butterworth Publishers,Woburn, Ma., 1983.
11.Chen, C. W., “Concepts and Utilities of Ecologic Model,” J. Sanitary Eng. Div., ASCE, pp.1085-1097, Oct., 1970.
12.D. P. Larsen, J. V. Sickle, K.W. Malueng, and P.D. Smith, “The effect of Wastewater Phosphorous Removal on Shagawa Lake, Minnesoda:Phosphorous Supplies”, Lake Phosphrous and Chlorophyll-a”, Water Research, Vol. 13, May, 1979.
13.Di Toro, D. M., D. J. O´Conner, and R. V. Thomann, “A Dynamic Model of the Phytoplankton Population in the Sacramento-San Joaquin Delta,” Advances in Chemistry, No. 116, American Chemical Society, pp.131-180, 1971.
14.Donigian, A.S. Jr., Baker, D.A. Haith and M.F. Walter,” HSPF Parameter Adjustments to Evaluate the Effects of Agricultural Best Management Practices”, EPA Contract No.68-03-2895, U.S. EPA Environmental Research Laboratory, Athens, GA, (PB-83-247171), 1983.
15.Donigian, A.S. Jr., and H.H. Davis, “User''s Manual for Agricultural Runoff Management (ARM) Model”, U.S. Environmental Protection Agency, EPA- 600/3-78-080, 1978.
16.Eppley, R. W., “Temperature and Phytoplankton Growth in the Sea”, Fishery Bulletin. 70(4): 1063-1085, 1972.
17.Gwo, J. P., L. E. Toran, M. D. Morris, and G. V. Wilson, “Subsurface Stromflow Modeling with Sensitivity Analysis Using a Latin-Hypercube Sampling Technique,” Ground Water, Vol. 34,No.5, pp.811-818, 1996.
18.Harr, M. E., Reliability-Based Design in Civil Engineering, McGraw-Hill Book Company, New York, 1987.
19.Harr, M. E., “Probabilities Estimates For Multivariate Analyses”, Applied Mathematical Modeing, Vol. 13, pp.313-318, 1989.
20.Haubner, S. M., and E. F. Joeres, “Using a GIS for Estimating Input Parameters in Urban Stormwater Quality Modeling”, Water Resources Bulletin, 1996.
21.Iman, R. L. and J. C. Helton, “A comparison of uncertainty and sensitivity analysis technique for computer models.” Report NUREGICR-3904, SAND 84-1461, Sandia National Laboratories, Albuquerque, New Mexico, 1985.
22.Kuo, J. T. and J. H. Wu, “A Nutrient Model for a Lake with Time-Variable Volumes,” Water Science and Technology, Vol.24, No.6, pp.133-139, 1991.
23.Kuo, J. T., J. H. Wu, and W. S. Chu, “Water Quality Simulation of Te-chi Reservoir Using Two-Dimensional Models”, Water Science and Technology, Vol. 30, No.2, pp.63-72, 1994.
24.Kuo, J. T. and R. V. Thomann, “Phytoplankton Modeling in the Embayments of Lakes”, Journal of Enviromental Engineering, ASCE, Vol. 109, No.6, pp.1311-1332, 1983.
25.Lahkim, B. M. and L. A. Garcia, “Stochatic modeling of exposure and risk in a contaminated heterogeneous aquifer. 2: Application of Latin Hypercube Sampling.” Environmental Engineering Science, Vol. 16, No. 5, pp. 329-342, 1992.
26.Lahlou M., L. Shoemaker, S. Choudhury, R. Elmer, A. Hu, Manguerra H. and Parker A., Better Assessment Science Integrating Point and Nonpoint Source(BASINS):User’s Mannual for Version 2.0, U.S. EPA, Office of Water, EPA-823-B-98-006, 1998.
27.Lahlou M., Shoemaker L., Choudhury S., Elmer R., Hu A., Manguerra H. and Parker A., BASINS Technical Note 1-6:User’s Mannual for Version 2.0, U.S. EPA, Office of Water, EPA-823-R-99-006, 1999.
28.Lawrence, A.I., J. Marrsaleh, J. B. Ellis, and B. Urbonas, “Stormwater Detention and BMPs”, Journal of Hydraulic Research, vol.34, 1996.
29.Markofsky, M. and D. R. P. Harlemn, “Prediction of Water Quality in a Stratified Reservoir”, J. Hydr. Engineering, ASCE, May, 1973.
30.Mckay, M. D., R. J. Beckman, and W. J. Conover, “A Comparison of Three Methods for Selecting Values of input Variables in the Analysis of Output from a Computer Code.” Technometrics, Vol. 21, No. 2, pp. 239-245, 1979.
31.Mckey, M. D., “Sensitivity and uncertainty analysis using a statistical sample of input values. “Uncertainty Analysis, Y. Ronen, ed., CRC Press, Inc., Boca Raton, Fla., pp. 145-186, 1988.
32.Melching, C. S. and S. Anmangandla, “Improved First-Order Uncertainty Method for Water-Quality Modeling”, Journal of Environmental Engineering, Vol. 118, No. 5, pp. 791-805, 1992.
33.Melching, C. S., “Computer Moedls of Watershed Hydrology”, Reliability Estimation, Singh V. P., ed., Littleton, Colorado, Water Resources Publication, pp. 69-118, 1995.
34.Melching, C. S. and C.G. Yonn, “Key Sources of Uncertainty in QUAL2E Model of Passaic River,” Journal of Water Resources Planning and Management, ASCE, Vol. 122, No. 2 , pp. 105-113, 1996.
35.Melching, C. S. and W. Bauwens, “Uncertainty in Coupled Nonpoint Source and Stream Water-Quality Models”, Journal of Water Resources Planning and Management, Vol. 127, No. 6, pp.403-411, 2001.
36.Melching, C. S. and G. Manache, Sensitivity Analysis of a Water-Quality Model Using Latin Hypercube Sampling, Journal of Water Resources Planning and Management, Vol. 130, No. 3, pp. 232-242, 2004.
37.Mortimer, C.H., “The Oxygen Content of Air Saturated Fresh Waters over Ranges of Temperature and Atmospheric Pressure of Limnological Interest”, International Vereinigung Theoretische and Angewandte Limnologie, Vol 22,pp2-23, 1981.
38.Orlob, G. T.,” Model for Stratified Impoundment, Chap. 8”, in Models for Water Quality Management, A.K. Biswas (ed) McGraw-Hill Bock Company, Inc. New Youk, 1981.
39.Pionke, H. B., W. J. Gburek, A. N.Sharpley and R. R. Schabel, “Flow and Nutrient Export Patterns for an Agricultural Hill-Land Watershed”, Water Resources Research, 1996.
40.Robinson, K. J. and Ragan R. M., “Geographic Information System Based Nonpoint Pollution Modeling”, Water Resources Bulletin, 1993.
41.Rosenblueth, E., “Point Estimates for Probability Memonts,” Porceedings, National Academy of Science, pp.3812-3814, Washington, D. C., 1975.
42.Rosenblueth, E., “Two Point Estimates in Probabilities,” Applied Mathematical, Vol. 5,pp. 309-335, 1981.
43.Saget, A., Chebbo, G. and Bertland, J. L., “The First Flush in Sewer Systems”, Water Science and Technology, 1996.
44.Swepherd, A., Sustainable rural development, London:Macmillam Press LTD,1998.
45.Thomann, R. V. and J. A. Muller, “Principles of Surface Water Quality Modeling and Contro”l, Harper & Row, Publishers, New York., 1987.
46.Tsihrintzis, V. A., H. R. Fuentes, and R. K. Gadipudi, “Modeling Prevention Alternatives for Nonpoint Source Pollution at a Well-field in Florida”, Water Resources Bulletin, 1996.
47.Vollenweider, R. A., “Input-Output Models with Special Reference to the Phosphorous Loading Concept in Limnology”, Hydrol. (Schweiz), 1975.
48.Vollenweider, R. A, “The Scientific Basis of Lake and Stream Eutrophication, with Particular Reference to Phosphorus and Nitrogen as Eutrophication Factors,” Tech. Rep. OECD, DAS/CSI/68.27, 1983.
49.Yen, B. C. and Y. K. Tung, “Uncertainty and Sensitivity Analyses of Pit-Migration Model”, Journal of Hydraulic Engineering, ASCE, Vol. 119, No.2, pp.262-283, 1993.
50.Yen B. C. and Y. K. Tung, Relibility and Uncertainty Analyses in Hydraulic Design, ASCE, 1993.
51.Yoon J., “Watershed-Scale Nonpoint Source Pollution Modeling and Decision Support System Based on A Model-GIS-RDBMS Linkage”, GIS and Water Resources, 1996.
52.Yu S. L., and R. J. Kaighn, “VODT Manual of Practice for Planning Stormwater Management” Virginia Transportation Research Council and The University of Virginia, Charlottesville, VA, March 1992.
53.工研院能源與資源研究所,「石門水庫水區崩塌地及土地利用航測調查計劃整體報告書」,台灣省北區水資源局,1998。
54.中華水土保持學會,「水土保持手冊農地篇」,行政院農委會,1992。
55.王智益,「BASINS及CE-QUAL-RIV1應用於非點源污染傳輸設計流量之研究」,碩士論文,國立台灣大學土木研究所,2000。56.行政院農業委員會,「水土保持技術規範」,2003。
57.余嘯雷、駱尚廉、郭振泰等,「台灣地區水庫集水區非點源污染控制技術及策略之研究」,行政院國家科學委員會委託,台大環工所執行,1993。
58.吳先琪、王美雪、陳世裕,「甘泉計畫(I)水庫水質維護大型計畫-子計畫(三) 水庫中磷的質量平衡及控制策略研究(第一年)」,行政院環境保護署委託,國立台灣大學環境工程學研究所,1990。
59.吳建鋐,「德基水庫二維水理與水質模式之模擬」,國立台灣大學土木工程研究所碩士論文,1990。60.李志賢,「水庫涵容能力分析」,國立成功大學環境工程研究所碩士論文,1993。61.李建忠,「HSPF模式應用於瑪家水庫優養潛勢分析之研究」,碩士論文,國立成功大學水利及海洋工程研究所,1996。62.李珮璇,「暴雨初期沖刷對水源水質衝擊之評估」,碩士論文,國立台北科技大學環境規劃與管理研究所,2002。63.李鴻源、高正忠、郭振泰、許銘熙、楊錦川,「水質保護綱要計畫-非點源污染防治計畫研究」,行政院環境保護署研究報告,1992。
64.李鴻源,「大漢溪上游石門水庫集水區特性探討之研究」,經濟部水利處北區水資源局,2000。
65.杜蕙莘,「非點源污染模型結合地理資訊系統應用於水質管理上之研究」,碩士論文,國立中興大學法商學院資源管理研究所,1997。
66.和新工程顧問公司,「石門水庫集水區第三階段治理規劃」,經濟部水利署北區水資源局委託,2000。
67.林雍富,「應用BASINS模式於非點源污染傳輸之模擬—以霧社水庫為例」,碩士論文,國立台灣大學土木工程研究所,2002。68.林鈺,「水質模擬之不確定性分析」,碩士論文,國立台灣大學土木工程研究所,1996。69.林鎮洋、章興儒,「台灣水庫集水區非點源污染調查之回顧與展望」,第十五屆環境規劃與管理研討會,2000。
70.邱昱嘉,「應用HSPF 模式與銫-137 技術於集水區產砂量推估之研究」,台灣大學土木工程學研究所碩士論文,2003。
71.侯錦雄,「休閒農業區及休閒農場設施設置範例〈推廣手冊〉」,七星農業發展基金會,1999。
72.洪轟誌,「非點源污染模式參數不確定性分析」,碩士論文,國立交通大學環境工程研究所,1993。73.高思懷、游以德,「水庫集水區水質污染防治策略計畫期末報告書」,經濟部水利署委託,台灣環保文教基金會執行,2003。
74.國立成功大學防災研究中心,「流域土砂管理模式之研究」,經濟部水利署,2002。
75.康恬慎,「石門水庫集水區不同時期崩塌地調查成果分析」,台灣大學森林研究所碩士論文,2001。
76.逢甲大學地理資訊系統研究中心,「台灣地區重要水庫集水區水資源資料庫建至及保育計劃」,經濟部水資源局,2000。
77.郭明杰,「非點源污染模式水文模擬之探討」,碩士論文,國立台灣大學土木工程研究所,1994。78.郭東晃,「非點源污染對河川水質之影響研究」,碩士論文,國立交通大學土木工程研究所,1993。79.郭振泰、楊德良、何政儒,「德基水庫水質模擬與探討(第一年研究報告)」,水資會/臺大土木工程研究所,1984。
80.郭振泰、楊德良、何政儒,「德基水庫水質模擬與探討(第二年研究報告)」,水資會/臺大土木工程研究所,1985。
81.郭振泰、楊德良、何政儒,「德基水庫水質模擬與探討(第三年研究報告)」,水資會/臺大土木工程研究所,1987。
82.郭振泰等,「鳳山水庫優養之探討與模擬(一)、(二)」,省環保處及環保署委託,臺大土木工程研究所執行,1989。
83.郭振泰、吳俊宗等,「臺灣地區給水水源優養評估法之建立及其優養程度調查(一)、(二)」,環保署委託,臺大土木工程研究所執行,1990。
84.郭振泰、余嘯雷、林鎮洋等,「水庫集水區非點污染源控制手冊及分級分區管理措施之研訂」,經濟部水資源局專案研究計劃,1997。
85.郭振泰等,「台灣地區水庫入流泥沙、水質觀測方法及水壩安全評估風險分析(一)、(二)、(三)」,經濟部水資源局委託,台大水工試驗所、美國匹茲堡大學、伊利諾大學執行,1998∼2000。
86.郭振泰、龍梧生等,「翡翠水庫水質模擬與應用(一)」,台北翡翠管理局委託,台大土木工程研究所執行,1998。
87.郭振泰、龍梧生等,「翡翠水庫水質模擬與應用(二)」,台北翡翠管理局委託,台大土木工程研究所執行,1999。
88.郭振泰、龍梧生等,「翡翠水庫水質模擬與應用(三)」,台北翡翠管理局委託,台大土木工程研究所執行,2000。
89.郭振泰、郭文健、吳俊宗、張穗蘋、黃益助等,,「牡丹水庫水質調查及改善計畫」,經濟部水利署南區水資源局,財團法人新環境基金會執行,2003。
90.陳有祺、陳筱華等,「石門水庫水質監測、水域生態環境及非點源污染之調查研究(二)」,經濟部水利署北區水資源局委託,中華大學水域生態環境研究中心執行,2004。
91.陳孟威,「類神經網路應用於石門水庫集水區暴雨產砂量推估之研究」,台灣大學土木工程學研究所碩士論文,2000。
92.陳信彰,「分佈型降雨-逕流模式之不確定性與敏感度分析」,碩士論文,國立成功大學水利及海洋工程研究所,1997。93.陳美心,「土地利用變遷對水源涵養效益之影響-以大埔水庫集水區為例」,碩士論文,逢甲大學土地管理研究所,1999。94.陳昶憲等,「山坡地集水區頻率洪流推估—以台北市郊內雙溪為例」,中華水土保持學報,第28卷,第2期,pp.178-483,1997。
95.陳莉,「以物件導向之遺傳演算法優選水庫運用規線之硏究」,博士論文,國立台灣大學農業工程學研究所,1995。
96.陳鴻傑,「曾文水庫集水區污染物傳輸及水庫水質模擬」,碩士論文,國立台灣大學土木研究所,2003。97.曾鈞敏,「水庫二維水理與水質模式之建立與應用」,碩士論文,國立成功大學水利暨海洋工程研究所,1991。98.黃建源,「淡水河流域大漢溪、新店溪非點源污染分析調查及整治規劃-板新水源區、翡翠水庫水源區氮磷污染分析、調查及整治規劃」,行政院環境保護署委託,美商傑明工程顧問公司執行,2000。
99.黃鈺真,「HSPF模式應用於曾文水庫集水區非點源污染負荷之推估」,國立成功大學環境工程學系碩士論文,2001。100.楊德良、林國峰、王如意、郭振泰、顏清連,「德基水庫集水區治理規劃研究報告第三冊-逕流、沖蝕及泥砂運移模式操作手冊」,台灣大學水工試驗所研究報告,1990。
101.溫清光,「非點源示範計畫」,國立成功大學環境工程系,1998。
102.溫清光,「流域性集水區非點源污染最佳管理示範作業計畫」,國立成功大學環境工程系,2000。
103.溫清光、郭振泰、龍梧生、張穗蘋、李志賢、莊淑滿,「曾文水庫水質調查及改善計畫」,水利署南區水資源局委託,財團法人成大研究法展基金會執行,2001。
104.萬象,「台灣地區水庫管理資訊系統建立(二) 」,經濟部水資源局,1998。
105.葉宗育,「水庫懸浮固體濃度即時監測暨集水區水質模式NPSM應用於翡翠水庫」,台灣大學環工研究所碩士論文,2001。106.趙美英,「德基水庫二維水理水質之模擬與風險分析」,碩士論文,國立台灣大學土木研究所,2001。107.趙倬群,「石門水庫集水區崩坍土砂產量推估之研究」,國立台灣大學土木工程所碩士論文,2004。108.劉柏廷,「牡丹水庫集水區非點源污染模擬及風險分析」,國立台灣大學土木工程所碩士論文,2004。109.歐陽元淳,「水庫集水區土壤沖蝕之研究-以石門、翡翠水庫為例」,台灣大學地理環境資源研究所碩士論文,2003。
110.蔡宗賢,「水庫集水區暴雨時期崩塌土砂量推估之研究」,碩士論文,國立台灣大學土木工程研究所,2005。111.蔡長泰、沈學汶、王文江,「台灣河川沉滓輸運之分析(三)」,經濟部水資源統一規劃委員會委託,國立成功大學水利暨海洋工程系執行,1993。
112.賴益成,「集水區泥砂遞移率推估之研究」,國立中興大學水土保持學系碩士論文,1998。
113.賴進松、郭振泰、吳俊宗、龍梧生、胡弘道等,「水庫集水區水質污染防制技術手冊」,經濟部水利署委託,國立台灣大學水工試驗所執行,2003。
114.駱尚廉、郭振泰等,「湖泊水庫水質改善及優養化評估法之建立和調查(三)、(四)」,環保署委託,臺大環境工程研究所執行,1992∼1993。
115.謝斌暉,「暴雨期間河川水質模式設計流量之研究」,碩士論文,國立台灣大學土木工程研究所,1999。116.顏本琦,徐享崑,郭振泰,「水資源風險與可靠度分析簡介」,台灣水利季刊,第40卷,第4期,1992。
117.魏敏裕,「集水區非點源污染之水質模擬運用AGNPS與GIS」,碩士論文,國立台灣大學農業工程研究所,1993。118.羅浩文,「翡翠水庫二維水質模擬與風險分析」,碩士論文,國立台灣大學土木工程研究所,1999。119.鐘文祥,「基隆河之水質模擬與風險分析」,碩士論文,國立台灣大學土木工程研究所,1995