[1]Yen, Andrew, “Intelligent CPFR-DCM Presentation,” Wolverine Decision Technology Inc., 2004, available from http://ld.itri.org.tw/activity/931020/Intelligent%20CPFR%20-%20DCM%20presentation.pdf
[2]Auto-ID Labs Japan, “EPCglobal Network?,” 2004, available from http://www.auto-id.jp/tech/index.html
[3]Childerhouse, P., Towill, D., “Engineering supply chains to match customer requirements,” Logistics Information Management, 13(6), 2000, Pages 337-345
[4]Taylor, David A., “Supply Chains-A manager’s Guide,” Addison Wesley, 2004, Pages 39-40
[5]Disney, S.M., “The production and inventory control problem in vendor managed inventory supply chains,” Ph.D. Thesis, Cardiff Business School, Cardiff University, 2001
[6]Disney, S.M., Potter, A.T., Gardner, B.M., “The impact of vendor managed inventory on transport operations,” Transportation Research, Part E 39, 2003, Pages 363-380
[7]eBizprise Inc., “CPFR Solution,” 2005, available from http://www.ebizprise.com.tw/ch/our_solutions/cpfr_solution.htm
[8]EPCglobal Inc., “The EPCglobal Network?: Overview of Design, Benefits, & Security,” 2004, available from: http://www.epcglobalinc.org/
[9]deMin, James E., “Collaborative Planning, Forecasting and Replenishment (CPFR) and the Network-Cracking the Bullwhip,” IT Research Library, 2003, Infonet Services Corporation, available from http://itresearch.forbes.com/
[10]Lee, H.L., Padmanabhan, P., Whang, S., “Information distortion in a supply chain: The Bullwhip Effect,” Management Science, 43, 1997a, Pages 543-558.
[11]Lee, H.L., Padmanabhan, V., Whang, S., “The bullwhip effect in supply chains,” Sloan Management Review, 38 (3), 1997b, Pages 93-102.
[12]Holweg Matthias, Disney Stephen, Holmstrom Jan, Sama Ros Johanna, “Supply Chain Collaboration: Making Sense of the Strategy Continuum,” European Management Journal, Vol. 23, No. 2, 2005, Pages 170-181
[13]Pagarkar Mubin, “RFID in Integrated Order Management Systems: White Paper,” IT Research Library,2005, Tata Consultancy Services, available from http://itresearch.forbes.com/
[14]Senge, P.M., “ The Fifth Discipline,” Random House, London, 1990
[15]Steven, M., “Die Koordination im Unternehmen,” WISU, Vol. 7, 2001, Pages 965-970
[16]Jouenne Thierry, “Henkel-Eroski CPFRR Pilot Case Study, ” CPFR Website, 2000
[17]Towill, D.R., “Forridge-Principles of good material flow,” Production Planning and Control, 8 (7), 1997, Pages 622-632.
[18]Towill, D.R., McCullen, P., “The impact of an agile manufacturing programme on supply chain dynamics,” International Journal Logistics Management, 10 (1), 1999, Pages 83-96
[19]Van Ackere, A., Larsen, E.R., Morecroft, J.D.W., “Systems thinking and business process redesign: An application to the Beer Game,” European Management Journal, 11 (4), 1993, Pages 412-423
[20]VICS, “Roadmap_To_CPFR, Version 3.0,” 1999, available from http://www.vics.org/
[21]VICS, “VICS Collaborative Planning Forecasting and Replenishment (CPFRR) Recommedation,” VICS, 2001
[22]VICS, “Retail Event Collaboration Business Process Guide,” VICS, 2004a, available from http://www.vics.org/
[23]VICS, “CPFR Overview,” VICS, 2004b, available from http://www.vics.org/committees/cpfr/
[24]Wikner, J., Naim, M.M., Towill, D.R., “The system simplification approach in understanding the dynamic behavour of a manufacturing supply chain,” Journal of System Engineering, 2, 1992, Pages 164-178.
[25]YossiSheffi, “The value of CPFR, RIRL Conference Proceedings,” Lisbon. Portugal, October 13-16, 2002
[26]Zapfel, G. , “Bausteine und Architekturen von Supply Chain Management – System, ” PPS Management, Vol. T(1), 2001, Pages 9-18.
[27]Tatung GMD,「RFID技術於電子資訊業製造自動化之應用」,工業局製造業自動化技術推廣計畫之提案,大同公司全球運籌管理處,民國2004年a。
[28]Tatung GMD,「影像顯示產業RFID示範性應用計畫」,經濟部技術處示範性資訊應用計畫之提案,大同公司全球運籌管理處,民國2004年b。
[29]李湖沌,「大同家電廠BTS流程IMIS與TAMIS流程整合」,大同公司經營資訊處,民國2005年a。
[30]李湖沌,「廠別分倉補貨表查訊範本」,大同公司經營資訊處,民國2005年b。
[31]林則孟,「CPFRR協同規劃預測補貨個案-力山企業集團」,製商整合E化個案集,第一冊,民國2004年,Pages 3-41。
[32]高鵬虎,「CPFR商業流程導入之研究以國內行動電話維修業為例」,國立台灣科技大學,碩博士論文網,民國2003年。[33]陳中和,「RFID在物流運籌之整合應用」,運籌整合應用實務研討會,中國文化大學推廣教育部延平分部,民國2004年10月14日。
[34]蔡永正,「訊電大同牌PDP及LCD 進銷存預測表之範本」,大同訊電公司企劃處,民國2005年。
[35]薛旭志,「3C零售業導入CPFR模式之研究」, 國立高雄第一科技大學,碩博士論文網,民國2004年。[36]蕭榮興、蘇偉仁、許育嘉,「電子商務導航」,資策會電子商務研究所,第6卷第14期,民國93年9月。