1. Antill, J. M., and Woodhead, R. W.,“Critical Path Methods in Construction Practice”, John Wiley & Sons, 4th ed, New York, 1990.
2. Antonio, A., Gonzalez-Quevedo, AbouRizk, S. M., Iseley, D. T., Halpin, D. W., “Comparison of Two Simulation Methodologies in Construction”, Journal of Construction Engineering and Management, ASCE, 119(3), 573-589, 1993.
3. Ahuja, V., and Thiruvengadam, V.,“Project Scheduling and Monitoring:current research status”, Construction Innovation, 4, 19-31, 2004.
4. Boctor, F. F.,“Some Efficient Multi-Heuristic Procedure for Resource-constrained Project Scheduling ”, European Journal of Operational Research, 49, 3-13, 1990.
5. Callahan, M. T., Quackenbush, D. G., Rowings, J. E.,“Construction Project Scheduling”, McGraw-Hill, New York, 1992.
6. Chehayeb, N. N., and AbouRizk, S. M.,“Simulation-Based Scheduling with Continuous Activity Relationships”, Journal of Construction Engineering and Management, ASCE, 124(2), 107-115, 1998.
7. Feng, C. W., Liu, L., Burns, S. A.,“Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems”, Journal of Computing in Civil Engineering, ASCE, 11(3), 184-189, 1997.
8. Feng, C. W., Liu, L., Burns, S. A.,“Stochastic Construction Time-Cost Trade-Off Analysis”, Journal of Computing in Civil Engineering, ASCE, 14(2), 117-126, 2000
9. Glover, F., Kelly, J. P., Laguna, M.,“Genetic Algorithms and Tabu Search Hybrids for Optimization”, Computers Ops Res., 22(1), 111-134, 1995.
10. Hajdu, M.,“Network Scheduling Techniques for Construction Project Management ”, Kluwer Academic Publisher, Netherlands, 1997.
11. Halpin, D. W., and Riggs, L. S., “Planning and Analysis of Construction Operations”, Wiley, Inc., 1992.
12. Harris, R. B.,“Precedence and Arrow Networking Techniques for Construction”, Wiley, New York, 1978.
13. Harris, R. B.,“Packing Method for Resource Leveling(PACK)”, Journal of Construction Engineering and Management, ASCE, 116(2), 331-350, 1990.
14. Harris, R. B., and Ioannou, P. G.,“Scheduling Projects with Repetitive Activities”, Journal of Construction Engineering and Management, ASCE, 124(4), 269-278, 1998.
15. Hegazy, T.,“Optimization of Resource Allocation and Leveling Using Genetic Algorithms”, Journal of Construction Engineering and Management, ASCE, 125(3), 167-175, 1999.
16. Hiyassat, M. A. S.,“Modification of Minimum Moment Approach in Resource Leveling”, Journal of Construction Engineering and Management, ASCE, 126(4), 278-284, 2000.
17. Kurihara, K., Nishiuchi, N.,“Efficient Monte Carlo simulation method of GERT-type network for project management”, Computer & Industrial Engineering, 42, 521-531, 2002.
18. Leu, S. S., and Yang, C. H., “GA-based Multicriteria optimal model for construction scheduling”, Journal of Construction Engineering and Management, ASCE, 125(6), 420-427, 1999.
19. Li, H., and Love, P.,“Using Improved Genetic Algorithm to Facilitate Time-Cost optimization”, Journal of Construction Engineering and Management, ASCE, 123(3), 223-237, 1997.
20. Li, H., Cao, J. N., Love, P. E. D., “Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems”, Journal of Construction Engineering and Management, ASCE, 125(5), 347-353, 1999.
21. Liu, L., Burns, S.A., Feng, C. W.,“Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method”, Journal of Construction Engineering and Management, ASCE, 121(4), 446-454, 1995.
22. Martinez, J. C., and Ioannou, P. G.,“General-Purpose Systems for Effective Construction Simulation”, Journal of Construction Engineering and Management, ASCE, 125(4), 265-276, 1999.
23. Moselhi, Osama and EI-Rayes,“Least Cost Scheduling for Repetitive Projects”, Canadian Journal of Civil Engineering, 20(5), 834-843, 1993.
24. Moselhi, Osama and EI-Rayes,“Scheduling of Repetitive Projects with Cost Optimization”, Journal of Construction Engineering and Management, ASCE, 119(4), 681-688, 1993.
25. Osama Abudayyeh, P.E. et al, “Analysis of Trend in Construction Research:1985-2002”, Journal of Construction Engineering and Management, ASCE, 130(3), 433-439, 2004.
26. Pietroforte, R., and Stefani, T. P.,“ASCE Journal of Construction Engineering and Management:Review of the year 1983-2000”, Journal of Construction Engineering and Management, ASCE, 130(3), 440-448, 2004.
27. Reda, R. M.,“RPM:Repetitive Project Modeling”, Journal of Construction Engineering and Management, ASCE, 116(2), 316-330,1990.
28. Shi, J. J.,“Activity-Based Construction(ABC)Modeling and Simulation Method”, Journal of Construction Engineering and Management, ASCE, 125(5), 354-360,1999.
29. Son, J., and Skibniewski, M. J.,“Multiheuristic Approach for Resource Leveling problem in Construction Engineering:Hybrid Approach”, Journal of Construction Engineering and Management, ASCE, 125(1), 23-31,1999.
30. Tavas, L. M., and Weglarz, J., “Project Management and Scheduling:A Permanent Challenge for OR.”, European Journal of Operational Research, 49, 1-2, 1990.
31. Wiest, J. D., and Levy, F. K.,“A Management Guide to PERT/CPM”, Prentice-Hall, Englewood Cliffs, N. J., 1977.
32. Zhong, D. H., and Zhang, J. S.,“New method for calculating path float in program evaluation and review technique(PERT)”, Journal of Construction Engineering and Management, ASCE, 129(5), 501-506, 2003.
33. 劉福勳,「實用工程進度規劃與控制」,漢天下工程管理顧問有限公司,1996。
34. PMI專案管理學會,「專案管理知識體系指南」,展頡知識管理顧問股份有限公司,台北,2003。
35. 林耀煌,「營建工程施工規劃與管理控制」,四版,長松出版社,台北,1996。
36. 黃价成,「時程管理體系整合作法」,碩士論文,國立成功大學土木工程研究所,台南,2000。37. 張敬廉,「網圖模組於大型公共工程主辦機關進度管理之應用」,碩士論文,國立交通大學土木工程研究所,新竹,2001。38. 黃正忻,「營建工程管理」,九樺出版社,1997。
39. 李得璋,「營建經營管理-營建工程規劃與進度控制」,財團法人台灣營建研究院,1987。
40. 高志魁,「關鍵鍊排程於營建工程排程之研究」,碩士論文,中華大學營建管理研究所,新竹,2003。41. 王炤琮,「動態網圖規劃數學模式之初步研究」,碩士論文,國立台灣工業技術學院工程技術研究所,台北,1991。
42. 黃承傑,「專案進度風險分析模式-考慮不確定性作業之影響」,碩士論文,國立高雄第一科技大學營建工程研究所,高雄,2002。43. 傅正輝,「作業相關性對總工期不確定影響之評估模式」,碩士論文,朝陽科技大學營建工程系,台中,2004。44. 吳旻謙,「重複性工程排程規劃演算法之研究」,博士論文,國立台灣科技大學營建工程系,台北,1999。45. 張芷宜,「運用機率限制規劃求解資源及資金供給不確定條件下之重複性工程排程問題」,碩士論文,朝陽科技大學營建工程系,台中,2004。46. 李威憲,「工程專案資源拉平方法PLA之研究」,碩士論文,國立台灣科技大學營建工程係,台北,2002。47. 曾貽威,「考慮現金流量之專案多重資源排程最佳化之研究」,碩士論文,朝陽科技大學營建工程系,台中,2001。48. 楊崇揮,「多評準施工流程最適化計算模式之探討」,碩士論文,國立台灣工業技術學院,營建工程技術研究所,台北,1997。49. 黃榮村,「模擬退火法應用於多資源專案排程問題之研究」,碩士論文,國防管理學院資源管理研究所,1995。
50. 蔡政峰,「求解有限資源專案排程問題最佳化之研究-以基因演算法求解」,碩士論文,國立成功大學工業管理學系,台南,2001。51. 羅友廷,「模糊多目標混合式遺傳演算法在零工式排程系統之應用」,碩士論文,東海大學工業工程研究所,台中,1999。52. 張嘉君,「應用模擬退火法求解營建工程專案多重資源排程最佳化之研究」,碩士論文,朝陽科技大學營建工程系,台中,2003。53. 王維志、劉正章、何春嫻,「新營建電腦模擬語言--STROBOSCOPE」,營建管理季刊,第45期,第58-第60頁,1990。
54. 蔡雅雯,「營建作業模擬系統邏輯控制元件之研究」,碩士論文,國立中央大學土木工程學系,桃園,2002。55. 黃榮堯,「大處著眼、小處著手-施工作業流程電腦模擬規劃分析」,營建管理季刊,第36期,第38頁-第48頁,1998。56. 吳獻堂,「應用模糊理論與電腦模擬分析營建操作生產力-COST電腦模擬程式之介紹」,碩士論文,朝陽科技大學營建工程系,台中,2000。57. 洪轟嘉,「結合限制理論與SmartLink電腦模擬之開發以輔助預拌混凝土供應鏈之規劃」,碩士論文,國立中興大學土木工程學系,台中,2001。58. 吳坤鴻,「時程分析技術知識地圖之建置」,碩士論文,中華大學營建管理研究所,新竹,2005。