|
Ben-Daya, M., & Raouf, A., 1994, “Inventory models involving lead time as decision variable”. Journal of the Operational Research Society, 45, pp. 579-582. Brander, Pär and Forsberg, Rolf, 2006, “Determination of safety stocks for cyclic schedules with stochastic demands”. International Journal of Production Economics, Volume: 104, Issue: 2, pp. 271-295. Chang, H. C., Ouyang, L. Y., Wu, K. S. and Ho, C. H., 2006, “Integrated vendor – buyer cooperative inventory models with controllable lead time and ordering cost reduction”. European Journal of Operational Research, Volume: 170, Issue: 2, pp. 481-495. Dellaert, Nico, and Jeunet, Jully, 2003, “Controlling multi-level production in a rolling-schedule environment”. International Journal of Production Economics, Volume: 85, Issue: 1, pp. 113-121. Dellaert, D., and Jeunet, J., 2005, “An alternative to safety stock policies for multi-level rolling schedule MRP problems”. European Journal of Operational Research, Volume: 163, Issue: 3, pp. 751-768. Enns, S. T., 2002, “MRP performance effects due to forecast bias and demand uncertainty”. European Journal of Operational Research, Volume: 138, Issue: 1, pp. 87-102. Jeunet, Jully, 2006, “Demand forecast accuracy and performance of inventory policies under multi-level rolling schedule environments”. International Journal of Production Economics, Volume: 103, Issue: 1, pp. 401-419. Lan, S. P., Chu, Peter, Chung, K. J., Wan, W. J., and Lo Ricky, 1999, “A simple method to locate the optimal solution of the inventory model with variable lead time”. Computers & Operations Research, Volume: 26, Issue: 26, pp.599-605. Lee, W. C., Wu, J. W., and Hou, W. B., 2004, “A note on inventory model involving variable lead time with defective units for mixtures of distribution”. International Journal of Operation Economics, Volume: 89, Issue: 1, pp. 31-44. Lee, W. C., 2005, “Inventory model involving controllable backorder rate and variable lead time demand with the mixtures of distribution”. Applied Mathematics and Computation, Volume: 160, Issue: 3, pp.701-717. Lee, W. C., Wu, J. W., and Lei C. H., 2007, “Computational algorithmic procedure for optimal inventory policy involving ordering cost reduction and back-order discounts when lead time demand is controllable”. Applied Mathematics and Computation, In Press, Corrected Proof, Available online. Liao, C. J., and Shyu, C. H., 1991, “An analytical determination of lead time with normal demand”. International Journal of Operations Production Management, 11, pp. 72-78. Mohammad, A. Hoque and Suresh, K. Goyal, 2006, “A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer”. International Journal of Operation Economics, Volume: 102, Issue: 2, pp. 217-225. Ouyang, L. Y., Yen, N. C., and Wu, K. S., 1996, “Mixture inventory model with backorders and lost sales for variable lead time”. Journal of the Operational Research Society, 47, pp. 829-832. Ouyang, L. Y., and Wu, K. S., 1997, “Mixture inventory model involving variable lead time with a service level constraint”. Computers & Operations Research, Volume: 24, Issue: 9, pp. 875-882. Ouyang, L. Y., and Chang, H. C., 2000, “The variable lead time stochastic inventory model with a fuzzy backorder rate”. Journal of the Operational Research Society of Japan, Volume: 44, Issue: 1, pp. 19-33. Ouyang, L. Y., and Chuang, B. R., 2001, “Mixture inventory model involving variable lead time and controllable backorder rate”. Computers & Industrial Engineering, Volume: 40, Issue: 4, pp. 339-348. Ouyang, L. Y., and Yao, J. S., 2002, “A minimax distribution free procedure for mixed inventory model involving variable lead time with fuzz demand”. Computers & Operations Research, Volume: 29, Issue: 5, pp. 471-487. Ouyang, L. Y., Wu K. S., and Ho, C. H., 2004, “Integrated vendor – buyer cooperative models with stochastic demand in controllable lead time”. International Journal of Operation Economics, Volume: 92, Issue: 3, pp. 255-266. Pan, C. H., Lo, M. C., and Hsiao, Y. C., 2004, “Optimal reorder point inventory models with variable lead time and backorder discount considerations”. European Journal of Operational Research, Volume: 158, Issue: 2, pp. 488-505. Pan, C. H. and Hsiao, Y. C., 2005, “Integrated inventory models with controllable lead time and backorder discount consideration”. International Journal of Production Economics, Volume: 93-94, Complete, pp. 387-397. Ryu, S. W. and Lee, K. K., 2003, “A stochastic inventory model of dual sourced supply chain with lead-time reduction”. International Journal of Production Economics, Volume: 81-82, pp. 513-524. Spitter, J. M. and Kok, A. G., and Dellaert , N. P., 2005, “Timing production in LP models in a rolling schedule”. International Journal of Production Economics, Volume: 93-94, pp. 319-329. Tersine, R. J., 1982, Principle of inventory and Materials Management, North Holland, New York. Tang, Ou and Robert W. Grubbström , 2003, “The detailed coordination problem in a two-level assembly system with stochastic lead times”. International Journal of Production Economics, Volume: 81-82, pp. 415-429. Tan, Man-Yi and Tang, Xiao-Wo, 2006, “The Further Study of Safety Stock under Uncertain Environment”. Fuzzy Optimization and Decision Making, Volume: 5, Issue: 2,pp. 193-202. Wagner, H.M., and Whitin, T.M., 1958, “Dynamic version of the economic lot size model”. Management Science , 5, pp. 89–96.
|