[1]Gomez T., C. Marnay, A. Siddiqui, L. Liew and M. Khavkin, “Ancillary Services Markets in California,” Environmental Energy Technologies Division, Ernest Orlando Lawrence Berkeley National Laboratory, University of California, Berkeley, California, Chap. 3(1999).
[2]Cheung W., David Sun, ” Energy and Ancillary Service Dispatch for the Interim ISO New England Electricity Market,” IEEE Transactions on Power Systems, Vol. 15, No. 3, pp. 968-974(2000).
[3]Han S. X., J. Sun, F. Yan, ” AGC Generator Auxiliary Service Quantitative Evaluation,” J. Power system Technology, Vol. 29, No. 18, pp. 26-29(2005).
[4]Wu J. G., J. Y. Liu, W. P. Song, B. Y. Yang, D. W. Duan, ” Research on Assessing Methods of AGC Generator in Auxiliary Service under Market Environment,” J. China Power, Vol. 4, No. 5, pp. 14-17(2006).
[5]Wu J. G., J. Y. Liu, ” AGC Bidding Auction Algorithm Based on Analytic Hierarchy Process,” J. Inner Mongolia Electric Power, Vol. 24, No. 3, pp. 5-8(2006).
[6]Harrington, H. J., The Improvement Process, McGraw-Hill, New York, USA (1987).
[7]Saaty, T. L., The Analytic Hierarchy Process, McGraw-Hill , New York, USA(1980).
[8]鄧振源、曾國雄,「層級分析法(AHP)的內涵特性與應用(上)」,中國統計學報,第二十七卷,第六期,第5∼22頁,民國七十八年。[9]鄧振源、曾國雄,「層級分析法(AHP)的內涵特性與應用(下)」,中國統計學報,第二十七卷,第七期,第1∼20頁,民國七十八年。[10]蒙以正,MATLAB 入門與精進,儒林圖書公司,民國九十二年。
[11]Kundar P., Power System Stability and Control, McGraw-Hill, New York, USA (1994).
[12]資料來源:http://w3.taipower.com.tw/,民國96 年5月。
[13]陳躬耕,「電力供需平衡供需機制」,電機月刊,第一五一期,第232∼242頁,民國九十二年七月。
[14]涂正義、蔡利郎、曾重富、雷旭民、施有為,「電力系統頻率品質之提升」, 台電工程月刊,第六七九期,第29∼41頁,民國九十四年五月。[15]陳躬耕,「自動發電功能的解析與操作」,台電工程月刊,第五零四期, 第69∼90頁,民國七十九年八月。[16]陳躬耕,「中央調度中心電能管理系統功能」,電機技師月刊,第九十二期,第35∼51頁,民國九十一年四月。
[17]Bhattacharya K., M. H. J. Bollen and J. E. Daalder, Operation of Restructured Power Systems, Kluwer Academic Publishers, Chap. 5(2001).
[18]NERC While Paper, Draft of Proposed Standards for Interconnected Operations Services(1999).
[19]NERC Operating Policy-10, Interconnected Operations Services, Draft-3.1(2000).
[20]“Ancillary Services and Bulk-power Reliability,” A Position Paper of the Electric-system Reliability Task Force, Secretary of Energy Advisory Board(1998).
[21]蘇慶宗,「電力輔助服務管理」,電機月刊,第一五二期,第240∼247頁,民國九十二年八月。[22]Ge J., L. Z. Zhang, X. B. Zhou, L. Dong, ” Discussion on AGC Units Participating Auxiliary Service in Electricity Market,” J. Power system Technology, Vol. 26, No. 12, pp. 61-65(2002).
[23]Saaty, Thomas L., The Analytic Hierarchy Process, McGraw-Hill, New York(1980).
[24]Saaty, Thomas L., “A Scaling Method for Priorities in Hierarchical Structure,” J. Mathematical Psychology, Vol. 15, No. 3, pp. 234-281(1977).
[25]陳亭羽、曾國雄,「模糊測度應用於多屬性決策時之資訊需求量簡化研究」,管理學報,第十七卷,第三期,第483∼514頁,民國八十九年。[26]Saaty, Thomas L., “How to make a decision: The Analytic Hierarchy Process,” J. Operation Research, Vol. 48, No. 1, pp. 9-26(1990).
[27]陳遷、王浣辦, 「AHP 方法判斷尺度的合理定義」,系統工程月刊,第十四卷,第五期,第18∼20頁,民國八十五年。
[28]Li H. L., ”An Efficient Method for Soling Linear Goal Programming problems,” J. Operational Theory & Applications, No.2, pp. 90(1996).
[29]林惠玲、陳正倉,應用統計學,雙葉書廊有限公司,民國八十九年年。
[30]張文恭、洪紹平,「電業自由化下之電力市場介紹」,電機月刊,第一五三期,第238∼249頁,民國九十二年九月。[31]祁培倫,系統合理備轉容量限制下抽蓄電廠之調度運用,國立台灣科技大學電資學院電機工程系碩士論文,民國九十五年七月。[32]吳進忠,獨立電力系統合理備轉容量規劃與調度之研究,國立台灣科技大學電資學院電機工程系博士論文,民國九十二年七月。[33]Wu C. C. and N. Chen, “A Study of Operation Standards for Frequency Control and Spinning Reserve Scheduling for Isolated Power Systems,” 22th Power Engineering Symposium, Kaohsiung, Taiwan, R. O. C. , pp. 591-595(2001).
[34]Wu C. C. and N. Chen, “Online Methodology to Determine Reasonable Spinning Reserve Requirement for Isolated Power Systems,” IEE Proceedings: Generation, Transmission and Distribution, Vol. 150, pp. 455-461(2003).
[35]Wu C. C. and N. Chen, “Frequency-based Method for Fast-Response Reserve Dispatch in Isolated Power Systems,” IEE Proceedings -Generation, Transmission and Distribution, Vol. 151, No. 1, pp. 73-77( 2004).
[36]Chang R. F., C. H. Lu, T. Y. Hsiao, “Prediction of Frequency Response after Generator Outage Using Regression Tree,” IEEE Transactions on Power System, Vol. 20, No. 4, pp. 2146-2147 (2005).
[37]王醴、林建廷等,「遽變負載對系統頻率之影響及改善對策」,臺電工程月刊 ,第六一三期,第52∼68 頁,民國八十八年九月。
[38]張維欽,負載模型對台電系統頻率驟降之影響,國立臺北科技大學電機與能源研究所碩士學位論文,民國八十九年六月。[39]台灣電力公司,台電電力系統運轉操作章則彙編,第十次修訂,台灣電力公司發行,台北,民國八十九年八月。
[40]台灣電力公司,台灣電力系統頻率運轉規範之研擬,民國九十五年一月。
[41]張標盛,「台電電力系統之運轉」,台電工程月刊,第五七三期,第188∼209頁,民國八十五年五月。