|
[1]Antony, J. and R. Banuelas, 2001, “A strategy for survival”, Manufacturing Engineer, vol. 80(3), pp. 119-121. [2]Boyles, R. A., 1991, “The Taguchi capability index”, Journal of Quality Technology, vol. 23, pp.17-26. [3]Boyles, R. A., 1994, “Process capability with asymmetric tolerances”, Communications in Statistics, vol. 23(3), pp.615-643. [4]Chan L. K., Cheng S. W., and F. A. Spring, 1988, “A new measure of process capability: Cpm”, Journal of Quality Technology, vol. 20, pp.162-173. [5]Chen, K. S., Huang, M. L. and R. K. Li, 2001, “Process capability analysis for an entire product” International Journal of Production Research, vol. 39(17), pp.4077-4087. [6]Corbett, L. M., 1992, “Delivery windows—a new view on improving manufacturing flexibility and on-time delivery performance”, Production and Inventory Management Journal, vol. 33(3), pp.74-79. [7]Garg, D., Narahari, Y., and N. Viswanadham, 2004, “Design of Six Sigma supply chains”, IEEE transactions on automation science and engineering, vol. 1(1), pp.38-57. [8]Garg, D., Narahari, Y., and N. Viswanadham, 2006, “Achieving sharp deliveries in supply chains through variance pool allocation”, European Journal of Operational Research, vol. 171, pp.227-254. [9]Guiffrida, A. L. and R. Nagi, 2006, “Cost characterizations of supply chain delivery performance”, International Journal of Production Economics, vol. 102, pp.22-36. [10]Harry, M. and R. Schroeder, 2000, Six-Sigma: the breakthrough management strategy revolutionizing the world’s top corporations, Random House, USA. [11]Huang, M. L., Chen, K. S. and Y. H. Hung, 2002, “Integrated process capability analysis with an application in backlight module”, Microelectronics & Reliability, vol. 42, pp.2009-2014. [12]Hsiang, T. C. and G. Taguchi, 1985, A tutorial on quality control and assurance-the Taguchi methods , ASA Annual Meeting, Las Vegas, Nevada, USA. [13]Jaruphongsa, W., Centinkaya, S. and C. H. Lee, 2004, “Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simply supply chain”, International Journal of Production Economics, vol. 92(2), pp.169-180. [14]Kane, V. E., 1986, “Process capability indices”, Journal of Quality Technology, vol. 18, pp.41-52. [15]Kotz, S. and N. L. Johnson, 1993, Process Capability Indices, Chapman & Hall, London. [16]Kotz, S. and C. R. Lovelace, 1998, Process Capability Indices in Theory and Practice, Arnold, London. [17]Kotz, S. and N. L. Johnson, 2002, “Process capability indices – a review, 1992-2000”, Journal of Quality Technology, vol. 34(1), pp.1-19. [18]Lee, C. H., Centinkaya, S. and A.P.M. Wagelmans, 2001, “A dynamic lot-sizing model with demand time windows”, Management Science, vol. 47(10), pp.1384-1395. [19]Lee, J. C., Hung, H. N., Pearn, W. L., and T. L. Kueng, 2002, “On the Distribution of the Estimated Process Yield Index Spk”, Quality and Reliability Engineering International, vol. 18, pp.111-116. [20]Pearn, W. L., Kotz, S. and N. L. Johnson, 1992, “Distributional and inferential properties of process capability indices”, Journal of Quality Technology, vol. 24, pp.216-231. [21]Pearn, W. L. and K. S. Chen, 1997, “Multi-process performance analysis: a case study”, Quality Engineering, vol. 10(1), pp.1-8. [22]Pearn, W. L., Lin, G. H. and K. S. Chen, 1998, “Distributional and inferential properties of the process accuracy and process precision”, Communications in Statistics: Theory and Methods, vol. 27(4), pp.985-1000. [23]Pearn, W. L., Ko, C. H., and K. H. Wang, 2002, “A multi-process performance analysis chart based on the incapability index Cpp : an application to the chip resistors”, Microelectronics Reliability, vol. 42(7), pp.1121-1125. [24]Pearn, W. L. and M. H. Shu, 2003, “Lower confidence bounds with sample size information for Cpm applied to production yield assurance”, International Journal of Production Research, vol. 41(15), pp.3581-3599. [25]Pearn, W. L., Shu, M. H., and B. M. Hsu, 2004, “Cpm MPPAC for manufacturing quality control applied to precision voltage reference process”, International Journal Manufacturing Technology, vol. 23, pp.712-719. [26]Pearn, W. L. and S. Kotz, 2006, Encyclopedia and handbook of process capability indices. A Comprehensive Exposition of Quality Control Measures Series of Quality, Reliability and Engineering Statistics, Vol.12, World Scientific, Singapore. [27]Ruczinski, I., 1996, “The relation between Cpm and the degree of inclusion. Doctoral dissertation”, University of Würzburg, Würzburg, Germary. [28]Singhal S. C., 1990, “A new chart for analyzing multi-process performance”, Quality Engineering, vol. 2(4), pp.379-390. [29]Singhal S. C., 1991, “Multi-process performance analysis chart (MPPAC) with capability zones”, Quality Engineering, vol. 4(1), pp.75-81. [30]Shu, M. H., 2006, “Manufacturing capability assurance for product with multiple characteristics: a case study applied to low dropout voltage regulator”, International Journal of Industrial Engineering, vol. 13(1), .pp. 41-50. [31]Stevenson, W. J. 2007, Operation management international student edition with global readings, McGraw-Hill/Irwin, New York. [32]Tadukamala, P., 1994, “The confusion over Six Sigma quality”, Quality Progress, vol. 27(11), pp.83-95. [33]Wilson, E. B. and M. M. Hilferty, 1931, “The distribution of Chi-Square”, Proceedings of the Notional Academy of Sciences, Washington, vol. 17, pp. 684-688.
|