[1] Alfares, H. K., 2007, “Inventory model with stock-level dependent demand rate and variable holding cost”, International Journal of Production Economics, Vol. 108, pp.259–265.
[2] Aly, M., Kouly, O. and Dolgui, A., 2004, “The MPS parameterization under lead time uncertainty”, International Journal of Production Economics, Vol. 90, pp.369-376.
[3] Averill, M. Law and W. David Kelton. 2000, Simulation modeling and analysis page 60-80. Copyright by McGraw-Hill Higher Education.
[4] Axsater, S., 1996, “Using the determinidtic EOQ formula in stochastic inventory control”, Management Science, Vol. 42, No.6
[5] Bashyam, S. and M. C. Fu, 1998, “Optimization of (s, S) inventory system with random lead times and a service level constraint,”Management Science, Vol. 44, pp.243-256
[6] Ben-Daya, M. and A. Raouf, 1994, “Inventory models involving lead time as decision variable”, Journal of Operational Research Society, Vol. 45, pp.579-582.
[7] Ben-Daya, M. and S.M. Noman, 2008, “Integrated inventory and inspection policies for stochastic demand,” European Journal of Operational Research, Vol. 185, pp.159–169.
[8] Chen, K. K. and C. T. Chang, 2007, “A seasonal demand inventory model with variable lead time and resource constraints”, Applied Mathematical Modelling, Vol. 31, pp.2433–2445
[9] Clark, A. J. and H. Scarf, 1960, “Optimal policy for a multi-echelon inventory problem”, Management Science, Vol. 6, No.3.
[10] David Simchi-Levi, Kaminsky and Edith Simchi-Levi, 2007, Designing and managing the supply chain: concepts, strategies and case studies page 239-240. Copyright by McGraw-Hill Higher Education.
[11] Das, K. and M. Maiti, 2003, ”Inventory of a differential item sold from two shops under single management with shortages and variable demand,” Applied Mathematical Modelling,” Vol. 27, pp.535–549.
[12] Dobrila P., 2001,” Simulation of supply chain behaviour and performance in an uncertain environment”, International Journal of Production Economics. Vol. 71, pp.429-438.
[13] Egar, F. and C. Tellkamp, 2005, “Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain”, International Journal of Production Economics, Vol. 95, pp.373-385.
[14] Gottfried, A., 1984, Home environment and early cognitive development: Integration, meta-analysis, and conclusions. Orlando, FL: Academic Press.
[15] Goyal, S. K. and B.C. Giri, 2003,” A simple rule for determining replenishment intervals of an inventory item withlinear decreasing demand rate”, International Journal of Production Economics, Vol. 83, pp.139–142.
[16] Guido W. S., M. Schuhmacher and F. Castells, 2003, ” Uncertainty assessment by a Monte Carlo simulation in a life cycle inventory of electricity produced by a waste incinerato”, Journal of Cleaner Production, Vol. 11, pp.279-292.
[17] Kyu Hun Hahn, K. H., H. Hwang and S. W. Shinn, 2004, “A returns policy for distribution channel coordination of perishable items”, European Journal of Operational Research, Vol. 152, pp.770–780.
[18] Harris, F. W., 1913, How many parts to make at once. Factory, The Magazine of Management, Vol.10, pp.135-136, 152.
[19] Hax, A. C. and D. Candea, 1984, Production and Inventory Management. Prentic-Hall, New Jersey, pp.133-134
[20] Jayaraman, V., 1998, “Transportation, facility location and inventory issues in distribution network design”, International Journal of Operations & Production Manamegent, Vol. 18, No.5.
[21] Kelton and W. David. 2002, Simulation with Arena. Copyright by McGraw-Hill Higher Education.
[22] Kleijnen, J. P. C. and J. Wan, 2007, “Optimization of simulated systems: OptQuest and alternatives,” Simulation Modelling Practice and Theory, Vol. 15, pp.354-362.
[23] Leovigildo, L. G. and P. B. Adelita, 1999,”A simulator that uses Tabu Search to approch the optinal solution to stochastic inventory models,” Computer & Industrial Engineering, Vol. 37, pp.215-218.
[24] Lee, W. C., 2005, “Inventory model involving controllable backorder rate and variable lead time demand with the mixtures of distribution”, Applied Mathematics and Computation, Vol. 160, pp.701–717.
[25] Maiti, M. K. and M. Maiti, 2005, “Inventory of damageable items with variable replenishment,” Computers & Industrial Engineering, Vol. 49, pp. 432–448.
[26] Maiti, M. K., 2008, “Fuzzy inventory model with two warehouses under possibility measure on fuzzy goal”, Production, Manufacturing and Logistics, Vol. 188, pp.746-774.
[27] Ouyang, L. Y. and K. S. Wu, 1996, “Mixture inventory model involving variable leadtime with a service level constraint”, Computers & Operations Research, Vol. 24, No. 9, pp.875-882.
[28] Pal, A.K., R.N. Bhunia and Mukherjee, 2006, “Optimal lot size model for deteriorating items with demand rate dependent on displayed stock level (DSL) and partial backordering,” European Journal of Operational Resear, ch Vol. 175, pp.977–991.
[29] Rau, H. and B. C. OuYang, 2007, “A general and optimal approach for three inventory models with a linear trend in demand”, Computers & Industrial Engineering, Vol. 52, pp.521–532.
[30] Rosenfild, D.B., 1987, “The retailer facility location problem: A case study”, Journal of business logistic, Vol. 8, No. 2.
[31] Spitter, J. M., A.G. de Kok and N.P. Dellaert, 2005, “Timing production in LP models in arolling schedule,” International Journal of Production Economics. Vol. 93–94, pp.319–329.
[32] Swafford, P. M., S. Ghosh and N. Murthy, 2006, “The antecedents of supply chain agility of a firm: Scale development and Model testing”, Journal of Operations Managemwnt, Vol. 24, pp.170-188.
[33] Tersine, R. J., 1994, Principles of Inventory and Materials Management, PTR prentice Hall, Englewood Cliffs, New Jersey, pp.90-95.
[34] Tripathy, P.K., W.M. Wee and P.R. Majhi, 2003, “An EOQ model with process reliability considerations”, Journal of the Operational Research Society, Vol. 54, pp.549-554.
[35] Yao, Z., C.H. Stephen Leung and K.K. Lai, 2008, “Analysis of the impact of price-sensitivity factors on the returns policy in coordinating supply chain”, European Journal of Operational Research, Vol. 187, pp.275–282.
[36] Zaid, T. B. and L. Benkherouf, 2004, “On an inventorymodel for deteriorating items with stock dependent and time-varying demand rates”, Computers & Operations Research, Vol. 31, pp. 223–240.
[37] Zhao, G. Q., J. Yang and G. K. Rand, 2001, “Heuristics for replenishment with linear decreasing demand”, International Journal of Production Economics, Vol. 69, pp.339-345.
[38] 林我聰, 羅國正, 郭建良, 2002, 推行供應鏈管理之不確定性因素及其因應策略之探討-以台灣資訊電子業為例, Journal of the Chinese Institute of Industrial Engineers, Vol. 19, No. 6, pp.60-78.
[39] 吳淑娟,2006,搜尋接駁轉運系統之最佳(s, S)存貨政策,東華大學全球運籌管理研究所碩士論文。[40] 陳麒文,2008,接駁轉運系統內最佳存貨政策之決定,中原大學工業與系統工程系碩士論文。[41] 楊倉碩,1995,供需不確定性因素影響下主排程的因應策略之研究---以個案分析為例,台灣大學商學研究所碩士論文。[42] 黃惠民、楊伯中編著,2007,”供應鏈存貨系統設計與管理-觀念、策略與個案研究”,滄海書局出版。