王朝正(1995),「生產系統中檢驗站設置之研究」,元智大學工業工程管理學系碩士論文。元虹產業報告(2008),http://www.s-tek.com.tw/cinformation2.htm
朱育宏(2001)「生產系統檢驗站設置問題之研究」,中原大學工業工程所碩士論文。吳枚珊(民94)中等學校藝術類教法。http://tart.ntua.edu.tw/graphic/graphic/graphic.htm
莊泓錡(2000),「品質確保系統之績效衡量」,逢甲大學工業工程所碩士論文。蔡志宏(2004年),「台灣汽車產業之供應鏈整合探討~以中華汽車為例」,元智大學工業工程與管理研究所碩士論文。劉朝陽(1998),「再回流生產系統檢驗站設置問題之研究」,中原大學工業工程學系碩士論文。劉其學(2004年),「流程分析在煉鋼維護決策系統之應用」,屏東科技大學工業管理研究所碩士論文。鄭英俊(2004),「品質成本決策效能分析-以汽車製造業原料採購為例」,屏東科技大學工業工程工業管理學系論文。
戴久永(1996),「創造魅力品質」,管理雜誌,第260期毅嘉科技資料,http://www.ichia.com
AIAG.,(2005), “Measurement Systems Analysis 3rd.”, 125-140.
Albright, T.L. and Roth, H.P.(1992), The measurement of quality costs: An alternative paradigm. Accounting Horizons, Vol. 6, Issue 2, 15-27.
American Society for Quality Cost of Quality.,(1999), The Certified Quality Manager Handbook.
Barad, M.,(1990), A Break-Even Quality Level Approach to Location of Inspection Station in a Multi-Stage Production Process,” International Journal of Production Research,Vol. 28, No. 1, 29-45.
Britney, R.R.,(1972), Optimal screening plans for non-serial production systems. Management Science, 18(9), 551-559
Bai, D. S., and Yun, J. H.,(1996), Optimal allocation of inspection effort in a serial multi-stage production. Computers and Industrial Engineering, 30(3), 387-396
Chakravarty, A. K.,(1987), Strategic Allocation of inspection effort in a serial, multi-product production system. IIE Transactions, 19(1), 13-22
Chevalier, P. B., and Wein L. M.,(1997), Inspection for Circuit Board Assembly,Management Science, Vol. 43, No. 9, 1198-1213.
Eppen, G. D., and Hurst, E. G.,(1974), Optimal Location of Inspection Stations in a Multistage Production Process, Management Science, Vol. 20, No. 8, 1974, 1194-1200.
Feigenbaum, A. V.,(1961), Total Quality Control, McGraw-Hill Book Company, 83-106.
Feigenbaum, A.,(1961), Quality and Business Growth Today, Quality Progress,15(11): pp.22-25, 1982.
Freeman, H. L., (1967), Cornell, R. W., Ladue, H. L., Lancaster, E. J., and Schock, Jr., H. E., Quality Costs — What and How, ASQC Quality Costs — Cost Effectiveness Technical Committee.
Gurnani, H., and Drezner, Z., and Akella, R.,(1996), Capacity planning under different inspection strategies. European Journal of Operational Research, 89(2), 302-312
Juran, J. M.,(1951), Quality Control handbook, New York, McGraw Hill.
Juran, J. and F. Gryna. Juran's.,(1988) Quality Control Handbook, 4thed. New York:
McGraw-Hill,1988.
Kang, K. S., and Ebeling, K. A., La, S. H.,(1900), The optimal location of inspection stations using a Rule-based methodology. Computers and Industrial Engineering, 19(1-4), 272-275
Kang, K. S., and Ebeling, K. A., La, S. H., (1990), The optimal location of inspection stations using a Rule-based methodology. Computers and Industrial Engineering, 19(1-4), 272-275
Kaspi, M., and Raz, T.,(1994), “Optimal Sequencing of Production and Inspection
Operations,” International Journal of Production Research, Vol. 32, No. 1, 209-221.
Lee, J., and Unnikrishnan, S.,(1998), “Planning Quality Inspection Operations in Multistage
Manufacturing Systems with Inspection Errors,” International Journal of Production
Research, Vol. 36, No. 1, 141-155.
Lindsay, G. F., and Bishop, A.B.,(1964), “Allocation of Screening Inspection Effort-
Dynamic-Programming Approach,” Management Science, Vol. 10, No. 2,343-352.
Mandel, J., Repeatability and Reproducibility,(1992), Journal of Quality Technology, 4(2), 74-85.
Margavio, G.W., Margavio, T.M., and Fink,(1993), “Quality Improvement Technology Using the Taguchi Method.” The CPA Journal, 72-75.
Montogomery, D. C., and Runger, G. C.,(1993), “Gauge Capability and Designed Experiments. Part II: Experiment Design Models and Variance Component Estimation,” Quality Engineering, Vol. 6, 289-305.
Mandroll, S.S., Shrivastava A.K., and Ding, Y., “A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes,” IIE Transactions, Vol. 38, 2006, pp.309-328.
Narahari, Y., and Khan, L. M., “Modeling Reentrant Manufacturing Systems with
Inspection Stations,” Journal of Manufacturing Systems, Vol. 15, No. 6, 1996, pp.
367-378.
Peters, M. H., and Williams, W. W., (1984), “Location of Quality Inspection Stations: An
Experimental Assessment of Five Normative Heuristics,” Decision Sciences, Vol. 15,
No. 3, 389-408.
Pasewark, W. R., “The evolution of quality control costs in U.S. Manufacturing.” Journal of Cost Management, Vol. 5, Issue 1, p.46-53, spring 1991
Roodhooft, F. and L. Warlop, “On the role of sunk costs and asset specificity in outsourcing decisions: a research note,” Accounting Organizations and Society, 24, 363-369, 1999.
Tsai, P. “Variable Gauge Repeatability and Reproducibility Study Using The Analysis Of Variance Method,” Quality Engineering, 1(1), pp.107-115,1988.
Trippi, R. R., “An On-Line Computational Model for Inspection Resource Allocation,” Journal of Quality Technology, Vol. 6, No. 4, 1974, pp. 167-174.
White, L. S.,(1966), “The Analysis of a Simple Class of Multistage Inspection Plans,”
Management Science, Vol. 12, No. 9, 685-693.
White, L. S.,(1969), “Shortest Route Models for the Allocation of Inspection Effort on a
Production Line,” Management Science, Vol. 15, No. 5, 1969, 249-259.
Yum, B. J., and McDowell, E. D.,(1987), “Optimal Inspection Policies in a Serial Production System Including Scrap Rework and Repair: An MILP Approach,” International
Journal of Production Research, Vol. 25, No. 10, 1451-1464.
Zhao, L. N., and Zheng, Y. P., (2000), “Cope with Inspection Allocation in Re-Entrant Lines
by Simulated Annealing,” Chinese Journal of Mechanical Engineering, Vol. 36, No. 2, 56-59.
H. Rau., Y.-H., Chu., and K.-H. Cho., (2005), “Layer modeling for the inspection allocation problem in reentrant production systems”, International Journal of Production Research, Vol.43 , No.17 p.3633-3655.
H. Rau., and Y. H. Chu., (2005), “ Inspection allocation planning with two types of workstations WVD and WAD”, International Journal of Advanced Manufacturing Technology, Vol.25 , No. 9-10 p.947-953.