1. Aalst van der, W. M. P. (1999). Formalization and Verification of Event-Driven Process Chains. Information and Software Technology, 41, 639-650.
2. Aalst van der, W. M. P., Hofstede ter, A. H. M., Kiepuszewski, B., & and Barros, A. P. (2003a). Workflow Patterns.
3. Aalst van der , W. M. P., ter Hofstede, A. H. M., & Weske, a. (2003b). Business Process Management:A Survey. Springer-Verlag Berlin Heidelberg, 1-12.
4. Appelrath, H. J., Ritter, J., Ritter, J., & Ritter, J. (2000). SAP R/3 Implementation methods and tools.
5. Arnold, J. R. T., Chapman, S. N., & Clive, L. M. (2004). Introduction to materials management casebook (6 Edition ed.).
6. Beamon, B. M., & Bermudo, J. M. (2000). A hybrid push/pull control algorithm for multistage, multi-line production systems. Production planning & Control, 11(4), 349-356.
7. Closs, D. J., Roath, A. S., Goldsby, T. J., Eckert, J. A., & Swartz, S. M. (1998). An Empirical Comparison of Anticipatory and Response-Based Supply Chain Strategies. International Journal of Logistics Management, 9(2), 21-33.
8. CoxⅡ, J. F., & Blackstone, J. H. (2007). APICS dictionary (12 Edition ed.).
9. Davenport, T. H. (1993). Process Innovation: Reengineering work through information technology: Harvard Business School Press.
10. Davenport, T. H., & Short, J. (1990). The New Industrial Engineering: Information Technology and Business Process Redesign. Sloan Management Review, 32, 11-27.
11. Deleesnyder, J. L., Hodgson, T. J., King, R. E., O’Grady, R. E., & Savva, A. (1992). Integrating kanban type pull systems and MRP type push systems: insights from a markovian model. IIE Transactions, 24,43-57.
12. Earl, M. J. (1994). The New and Old of Business Process Redesign. Journal of Information System, 3(1), 5-22.
13. Groenevelt, H., & Karmarkar, U. (1987). Dynamic kanban system: a case study: University of Rochester.
14. Grover, V., & Malhotra, M. K. (1997). Tutorial: Business Process Reengineering: A Tutorial on the Concept. Evolution Method Technology and Application Journal of Operation Management, 15, 193-213.
15. Hall, R. W. (1986). Syncro-MRP: combining kanban and MRP , the YAMAHA PYMAC system. Production Planning and Control, 43-56.
16. Hammer, M., & Champy, J. (1993). Reengineering the Corporation: A Manifesto for Business Revolution: Harper Collins Publishers.
17. Hammer, M., & Stanton, S. A. (1995). The reengineering revolution : a handbook. New York: Harper Business.
18. Harrington, S. H. (1991). Business Process Improvement. New York: McGraw Hill.
19. Imagine That, Inc. (2002). Extend Version 6 User’s Guide.
20. Joseph, O., & George, P. (1994). Orlicky's material requirements planning. New York: McGraw-Hill.
21. Karmark, U. S. (1986). Integrating MRP with kanban / pull system: University of Rochester.
22. Keller G., & Teufel T. (1998). SAP R/3 Process Oriented Implementation: Iterative Process Prototyping.
23. Kotha, S. (1995). Mass customization: Implementing the emerging paradigm for competitive advantage. Strategic Management Journal, 16, 21-42.
24. Law, A. M., & Kelton, W. D. (2000). Simulation Modeling and Analysis. New York : McGraw-Hill (3 Edition ed.).
25. Levi, D. S., Kaminsky, P., & Levi, E. S. (2008). Designing and managing the supply chain: concepts,strategies,and studies : McGraw-Hill (3 Edition ed.).
26. Monk, E. F., & Wagner, B. J. (2009). Concepts in Enterprise Resource Planning (3 Edition ed.).
27. Olhager, J., & Ostlund, B. (1990). An integrated push-pull manufacture strategy. European Journal of Operations Research, 45, 135-142.
28. Olsen, K. A., Satre, P., & Thorstenson, A. (1997). A procedure-oriented generic bill of materials. Computers & Industrial Engineering, 32, 29-45.
29. PineⅡ, J. B. (1993). Mass customization: Harvard University Business School Press.
30. PineⅡ, J. B., & Boynton, A. (1993). Marking Mass Customization Work. Harvard Business Review, 71, 108-119.
31. Porter, M., & E., M. V. (1985). How information gives you competitive advantage. Harvard Business Review.
32. Sarker, B. R., & Fitzsimmons, J. A. (1989). The performance of push and pull system: a simulation and comparative study. International Journal of Production Research, 27, 1715-1732.
33. Scheer, A. W. (1999). ARIS--business process modeling.
34. Scheer, A. W., Abolhassan, F., Jost, W., & Kirchmer, M. (2002). Business process excellence: ARIS in practice.
35. Schnitt, D. L. (1991). Reengineering the Organization Using Information Technology. Journal of System Management.
36. Silveira, G. D., Borenstein, D., & Fogliatto, F. S. (2001). Mass customization: Literature review and research directions. International Journal Production Economics, 72, 1-13.
37. Spearman, M. L., & Zazanis, M. A. (1992). Push and pull production systems: issues and comparisons. Operations Research, 40, 521-532.
38. Starr, M. K. (1965). Modular production ? a new concept. Harvard Business Review, 131-142.
39. Stephen, R. (2001). Business Process Management-Winning the Next Phase of Market Competition. Q-Line Technologies, 1-11.
40. Stevenson, W. J. (2007). Operations management (9 Edition ed.).
41. Takahashi, K., Hiraki, S., & Soshiroda, M. (1994). Pull-Push integration in production ordering systems. International Journal of Production Economics, 33(77), 155-161.
42. Terzi, S., & Cavalieri, S. (2004). Simulation in the Supply Chain Context: A Survey. Computers in Industry, 53, 3-16.
43. Toni, A. D., Caputo, M., & Vinelli, A. (1988). Production management techniques: push-pull classification and application conditions. International Journal of Operations and Production Management, 8(2), 35-51.
44. Vernadat, F. (1996). Enterprise Modeling and Integration: Principles and Application.
45. Womack, J. P., & Jones, D. T. (2003). Lean Thinking.
46. Womack, J. P., Jones, D. T., & Roos, D. (1990). The machine that changed the world.
47. 林則孟 (2002), 系統模擬理論與應用: 滄海書局。48. 侯君溥 (2005), 供應鏈管理: 美商麥格羅,希爾股份有限公司。
49. 勝呂隆男 (2005), 適正庫存之想法與算法: 先鋒企管經銷。
50. 曾文宏, 邱清爐, 方正中, 張嘉華, & 林建廷 (2008), 多產品環境下CONWIP與看板系統模擬研究, 工商管理學刊, 4(1), 55-62。
51. 賴士葆 (2004), 生產與作業管理:理論與實務: 華泰出版股份有限公司。