[1]熊培霖等作,基礎知識與應用實務 : 專案管理入門寶典,台北:博鴻國際出版社,2006。
[2]詹姆斯•路易斯博士,專案管理聖經,台北:臉譜出版社,2004。
[3]蔡登茂、邱煥能,「專案資源需求規劃與排程問題之研究」,經濟部中小企業處第六屆中小企業研究碩博士論文獎論文輯錄,台北,2001,第31-44頁。[4]鄭劍仁,「創新思維於專案管理之應用」,台灣專案管理雜誌,第四期,2009,第63頁。
[5]黃榮華、楊長林、劉士豪,「考慮資源限制與穩健性之專案排程研究」,輔仁管理評論,第十五卷,第三期,2008,第1-32頁。[6]蔡登茂,「有限資源專案排程問題之文獻回顧研究」,正修學報,第九期,1996,第57-74頁。[7]黃榮村,模擬退火法應用於多資源專案排程問題之研究,碩士論文,國防管理學院資源管理研究所,台北,1995。
[8]李紹遠,資源限制專案計畫排程問題之研究,碩士論文,淡江大學管理科學研究所,台北,1982。[9]曾明仁,資源限制專案計劃最短排程之研究,碩士論文,淡江大學管理科學研究所,台北,1983。[10]陳鴻輝,資源限制專案計劃最適排程研究,碩士論文,淡江大學管理科學研究所,台北,1983。[11]林欣慧,多組態資源限制專案排程問題解算之研究-包含不可恢復資源限制,碩士論文,元智大學工業工程與管理學系,桃園,2004。[12]J.E. Kelley, The critical path method: Resources planning and scheduling, In: J.F. Muth, G.L. Thompson (Eds.), Industrial Scheduling, Prentice-Hall, Englewood Cliffs (N.J.), 1963, pp. 347-365.
[13]L. V. Tavares and J. Weglarz, "Project Management and Scheduling: A Permanent Challenge for OR, " European Journal of Operational Research, Vol.49, 1990, pp.1-2.
[14]F. F. Boctor, "Some efficient multi-heuristic procedures for resource-constrained project scheduling, " European Journal of Operational Research, Vol. 49, No. 1, 1990, pp. 3-13.
[15]R. Kolisch, and A. Drexl, "Local search for nonpreemptive multi-mode resource-constrained projects scheduling, " IIE Transactions, Vol.29, 1997, pp.987-999.
[16]T. L. Pascoe, An experimental comparison of heuristic methods for allocating resources, Unpublished Ph. D. Thesis, Department of Engineering Cambridge University, Cambridge, England, 1965.
[17]E. W. Davis and J. H. Patterson, "A comparison of heuristic and optimum solutions in resource-constrained project scheduling, " Management Science, Vol. 121, No. 8, 1975, pp. 944-955.
[18]A. A. Mohammad and A. M. Youssef , "Resource constrained project scheduling using simulation, " Construction Management and Economics, Vol. 20, No. 4, 2002, pp.323-330.
[19]A. Edward, R. Silver, V. Victor and de. Dominique, "A Tutorial on Heuristic Methods, " European Journal of Operational Research, Vol. 5, No. 3, 1980, pp. 153-162.
[20]E. W. Davis, "Project scheduling under resource constraints historical review and categorization of procedures, " AIIE Transactions., Vol. 5, No. 4, 1973, pp. 297-312.
[21]J. H. Mize, A heuristic scheduling model for multi-project organizations, Unpublished Ph.D. Thesis, Purdue University, Indiana, 1964.
[22]L. G. Fendley , "Toward the development of a complete multiproject scheduling system, " Journal of Industrial Engineering, Vol. 19, No. 10, 1968, pp. 505-515.
[23]L. Gonguet, Comparison of three heuristic procedures for allocating resources and producing schedule, In:H.J.M. Lombaers (ed.), Project Planning by Network Anal-ysis, North-Holland, Amsterdam, 1969, pp. 249-255.
[24]J. Moder, C. Phillips, and E. Davis, Project management with CPM, PERT and precedence diagramming, 3rd Edition, Van Nostrand Reinhold, New York,1983.
[25]O. Liess and P. Michelon, "A constraint programming approach for the resource-constrained project scheduling problem, " Annals of Operations Research , Vol.57, No. 1, 2008, pp. 25-36.