[1] 岩室宏,單元生產,日本:日刊工業新聞社,2002。
[2] 加藤治彥,生產管理,日本:日本能率協會,2002。
[3] 賴士葆,生產與作業管理,台北:華泰書局,1995。
[4] 白健二、陳文華、郭瑞祥、蔣明晃,生產與作業管理,台北:國立空中大學,2001。
[5] 賴彥銘,應用群聚技術求解製造單元形成問題,碩士論文,私立大葉大學工業工程所,彰化,2002。[6] 許文治,生產線再造革命,台北:聯經出版社,2003。
[7] 賴慶松、鄒慶士譯,生產與作業管理,台北:倉海書局,2001。
[8] 林則孟,系統模擬,台北:倉海書局,2001。
[9] 張百棧,生產管理,台北:華泰書局,1996。
[10] 門田安弘著,黃一魯譯,豐田式生產體系,台北:中國生產力中心,1987。
[11] 大野耐一著,國瑞協力會TPS 自主研究會譯,豐田生產方式,台北:財團法人中衛發展中心,2001。
[12] Rother, M. and Shook, J., Learning to See, Taipei, Corporate Synergy Development Center, 2006.
[13] Liker, J.K. and Meier, D., The Toyota Way Fieldbook, New York, McGraw-Hill Education, 2006.
[14] Miltenburg, J. “U-Shaped Production Lines:A Review of Theory and Practice,” International Journal of Production Economics , Vol.70.lssue 3, pp.201, 2001.
[15] Mitrofanov, S.P. Scientific Principles of Group Technology, Volumes I, II & III , English Translation, National Lending Library for Science and Technology, 1966.
[16] Hollier, R. and Corlett, N., Workflow in Batch Manufacturing, London, HMSO, 1966.
[17] Isa, K., and Tsuru, T. “Cell Production and Workplace Innovation in Japan:Toward a New Model for Japanses Manufacturing?”, Social Research Science Network, Vol.41, lssue 4, pp. 548-578, 2002.
[18] Davis, M.M., Auqilano, N.J. and Chase, R.B., Fundamentals of Operations Management, New York , McGraw-Hill, 1999.
[19] Kapstein , J. “Volo’s Radical New Plant:The Death of The Assembly Line?, Business Week, No.3121, pp.92-93, 1989.
[20] Gottfried, B.S., Element of Stochastic Process Simulation , Englewood Cliffs, N.J. Prentice-Hall,1998.
[21] Shannon, R., “Operation Research Methodologies in Industrial Engineering,” AIIE Transaction, Vol.12, Issue 4, pp.364-367, 1980.
[22] Greene, J.H., Production and Inventory Control Handbook, New York, McGraw-Hill, 1987.
[23] Haik, B.E and Aomar, R.A., Simulation-Based Lean Six-Sigma and Design for Six-Sigma, Wiley, Hoboken, 2006.
[24] Omer, F.B. and Serpil, E., ”Simulation Modeling and Analysis of a JIT Production System,” International Journal of Production Economics, Vol.55, Issue 2, pp.203-212, 1998.
[25] Huang, P.Y, Rees, L.P., Taylor, B.W., ”A Simulation Analysis of The Japanese Just-In-Time Technique (with Kanbans) for a Multi-Line,Multi Stage Production System,” Decision Sciences, Vol.14, Issue 3, pp.326-344, 1983.
[26] Detty, R.B. and Yingling, J.C., “Quantifying Benefits of Conversion to Lean Manufacturing with Discrete Event Simulation: a Case Study,” International Journal of Production Research, Vol.38, Issue 2, pp.429-445, 2000.
[27] Abdulmalek, F.A. and Rajgopal, J., “Analyzing The Benefits of Lean Manufacturing and Value Stream Mapping Via Simulation: A Process Sector Case Study,” International Journal of Production Economics, Vol.107, Issue 1, pp.223-236, 2007.
[28] Crawford, K.M. , John,F.C. and Blackstone, H., Performance Measurement Systems and The JIT Philosophy Principles and Cases, Virginia, APICS, 1988.
[29] Louis, R.S., How to Implement Kanban for America Industry, New York, Productivity Press, 1992.
[30] John, M., “Balancing U- Lines in a Multiple U-Line Facility,” European Journal of Operational Research, Vol.109, Issue 1, pp.1-23,1998.
[31] Chang, T.M., Yih, Y., ”Generic Kanban System for Dynamic Environments,” International Journal of Production Research, Vol.132, Issue 4, pp.889-902, 1994.
[32] Durmusoglu, M. B., “Analysis of The Conversion from a Job Shop System to a Cellular Manufacturing System,” International Journal of Production Economic, Vol.30, Issue 1, pp.427-436, 1993.