|
【1】夏德鈺,「核能發電安全」,財團法人中興工程科技研究發展基金會,2002年。 【2】“Modular Accident Analysis Program, MAAP5 User’s Manual,” Fauske & Associates, Inc., November 2008. 【3】“RETRAN-02-A Program for Transient Thermal-Hydraulic Analysis of Complex Flow Systems,” EPRI Document No. P1850-CCMa, November 1984. 【4】“RELAP5YA-A Computer Program For Light-Water Reactor System Thermal-Hydraulic Analysis User’s Manual,” Yankee Atomic Electric Company, October 1982. 【5】R. O. Wooton, P. Cybulskis, and S. F. Quayle, “MARCH-2 (Meltdown Accident Response Characteristics) Code Description and User’s Manual”, Battelle Columbus Laboratories, August 1984. 【6】MELCOR-A computer code for analyzing in nuclear power plants and the design basis accidents for advanced power plant applications. Available : http:// melcor.sandia.gov/ 【7】Y. Xu, M. Ishii, and M. A. Feltus, “Safety analysis of multiple-failure of passive safety systems in SBWR-1200 SBLOCA,” Nuclear Engineering and Design 230 (2004) 107-119. 【8】Kenji Arai, Akira Murase, Ryoichi Hamazaki, and Masahiko Kuroki, “AB1600—Progress of ABWR technology toward next generation ABWR,” Nuclear Engineering and Design 238 (2008) 1902-1908. 【9】Rae-Joon Park, Sang-Baik Kim, Seong-Wan Hong, and Hee-Dong Kim, “Detailed evaluation of coolant injection into the reactor vessel with RCS depressurization for high pressure sequences,” Nuclear Engineering and Design 239 (2009) 2484-2490. 【10】Takashi Sato, Makoto Akinaga, and Yoshihiro Kojima, “Two types of a passive safety containment for a near future BWR with active and passive safety systems,” Nuclear Engineering and Design 239 (2009) 1682-1692. 【11】Thomas K.S. Liang, Chung-Yu Yang, and Liang-Che Dai, “Analysis of ABWR FW pump performance during power ascending and verification of an operational strategy to jump pump speed across the critical region with RELAP5-3D,” Annals of Nuclear Energy 36 (2009) 917-922. 【12】Chung-Yu Yang, Thomas K.S. Liang, B. S. Pei, C. K. Shih, S. C. Chiang, and L. C. Wang, “Development and application of a dual RELAP5-3D-based engineering simulator for ABWR,” Nuclear Engineering and Design 239 (2009) 1847-1856. 【13】Yuh-Ming Ferng, Ying-Ting Liu, and Chunkuan Shih, “Investigating the execution of EOPs in LOTDFP + ATWS + LOCA scenarios for an ABWR using MAAP code,” Nuclear Engineering and Design 240 (2010) 198-203. 【14】“Emergency Operation Procedures, EOPs”,龍門電廠緊急操作程序書,2002年12月。 【15】Changwook Huh, Namduk Suh, and Goon-Cherl Park, “Optimum RCS depressurization strategy for effective severe accident management of station black out accident,” Nuclear Engineering and Design 239 (2009) 2521-2529. 【16】Te-Chuan Wang, “Comparison of Severe Accident Results by Using MAAP5 and MAAP4 codes,” Proceeding of the 18th International Conference on Nuclear Engineering ICONE 18, May 2010. 【17】General Electric Co., “FSAR of Lung-Men Nuclear Power Station Units 1&2,” August 15, 2007. 【18】Kwang-Sheng Chang, Te-Chuan Wang, “Analysis of LBLC-PF-R-N Accident Sequence and Hydrogen Generation of Lungmen Nuclear Power Plant with MAAP4 and MAAP-ABWR,” Institute of Nuclear Energy Research, October, 2005. 【19】蔡欣昌,「核能四廠電廠全黑事故及失水事故之分析研究」,中原大學機械工程研究所,2005年7月。 【20】陳俊翔,「進步型沸水式反應爐嚴重事故之研究」,中原大學機械工程研究所,2007年6月。 【21】李志毅,「核四廠電廠全黑狀況下嚴重事故導則之分析」,中原大學機械工程研究所,2008年7月。 【22】龍門電廠嚴重事故導則(Severe Accident Guidelines, SAGs)。 【23】林昱鑫,「龍門核能電廠之嚴重事故分析」,中原大學機械工程研究所,2009年7月。 【24】劉盈廷,「以MAAP程式驗證龍門電廠在預期暫態未急停事故下之緊急操作程序書」,國立清華大學工程與系統科學系研究所,2008年6月。 【25】http://wapp4.taipower.com.tw/nsis/option0-4.asp,台灣電力股份有限公司網站,龍門核能電廠簡介。 【26】「核四訓練教材」,台灣電力公司,2006年12月。 【27】「核四廠緊急計畫演習嚴重事故演練模擬分析與評核,九十八年度研究報告作業,期中報告(附件二)」,台灣電力股份有限公司。
|