[1]Timoshenki S., Young D.H. and Weaver W.Jr, Vibration Problem Problems in Engineering, 4th ed., Wiley, New York
[2]Chen Y.H., ”Generalized dynamic-stiffness matrix of a Timoshenko beam for transverse vibration”, Earthquake Engineering and Structural Dynamics, Vol.15,1987, pp.391-402.
[3]Wu J.S. and Dai C.W., “Dynamic response of multi-span non-uniform beam due to moving loads”, Journal of Structural Engineering, ASCE, Vol.113, No.3, 1987, pp.459-474.
[4]Yang Y.B. and Yau J.D. and Hsu L.C., “Vibration of simple beams due to trains moving at high speeds”, Engineering Structures, Vol.19, No.11,1997, pp.936-944.
[5]Akin J.E. and Mofid M., “Numerical solution for response of beams with moving mass”, Journal of Structural Engineering, ASCE, Vol.115, No.1,1989, pp.120-131.
[6]許琳青, “橋樑於高速列車作用下之衝擊反應”,國立台灣大學土木工程學研究所碩士論文, 1996, 楊永斌 教授指導.[7]Genin J. and Chung Y.I., “Response of a continuous guideway on equally spaced supports traversed by a moving vehicle”, Journal of Sound and Vibration, Vol.67, No.2,1979, pp.245-251.
[8]施光夏, “過渡段軌道之動態反應’’, 國立台灣大學工程科學與海洋工程研究所碩士論文,2004[9]張昀青,劉維寧,張玉娥,牛潤名, “軌道結構參數對隧道地面點動力影響的影響分析’’, 2006
[10]許維倫, “高鐵列車行經高架橋樑時支列車成做舒適度分析’’,2007
[11]左景奇,姜其斌,傅代正, “板式軌道彈性墊層CA砂漿的研究’’, 2005
[12]李文峰, “高速列車輪/軌互制行為之動態分析及驗證’’,2007
[13]Luo,Y., Yin,H., and Hua,C., “The dynamic response of railway ballast to the action of trains moving at different speeds,’’ Proc. Of the Inst. Of Mech. Engineers-E-J. of Rail and Rapid Transit, 1996,210,95-101.
[14]吳坤枰, ’’高速列車行經道岔結構之動態反應分析’’,國立台灣大學工程科學與海洋工程研究所碩士論文,2010[15]Yang.Y.B, Yau,J.D., Wu, Y.S., “Vehicle-Bridge Interaction Dynamic With Applications to High-Speed Railways’’,pp.175-179. River Edge, NJ : World Scientific, 2004
[16]林家慶, “高鐵列車對於軌道橋樑的衝擊’’,國立台灣大學工程科學及海洋工程研究所碩士論文,2002