|
1.AgenaRisk 5.0, User Manual (2008), www.agenarisk.com. 2.Enrique Lopez Droguett, Marcio das Chagas Moura (2008), “A semi-Markov model with Bayesian belief network based human error probability for availability assessment of downhole optical monitoring systems”, Simulation Modelling Practice and Theory, Vol. 16, No. 10, pp.1713-1727. 3.Neville Stanton (1996), “Human Factors in Nuclear Safety”, Taylor and Francis Ltd. 4.Peters, G. (1966), “Human error: Analysis and control”, Journal of the ASSE, January. 5.M. Harrison (2004), “Human Error Analysis and Reliability Assessment”, The Interdisciplinary Research Collaboration in Dependability,http://spiderman-2.lass.fr/IFIPWG/Workshop&Meeting/46/05-Harrison.pdf. 6.Xuhong He, Yao Wang, Zupei Shen, Xiangrui Huang (2007), “A simplified CREAM prospective quantification process and its application”, Reliability Engineering and System Safety, Vol. 93, No. 2, pp.298-306. 7.D.A. Powers (2000), “Technical Basis and Implementation Guidelines for Technique for Human Event Analysis”, US Nuclear Regulatory Commission, May. 8.Regilda da Costa e Silva Menezes, Enrique Lopez Droguett (2006), “Modeling Human Reliability in Maintenance of Transmission Line via Bayesian Belief Networks”, Third International Conference on Production Research-Americas’ Region, Vol. 17, No. 1, pp. 162-185. 9.Lauritzen, S., Thiesson, B., and Spiegelhalter, D. (1994), “Diagonstic systems created by model selection methods: A case study”, New York, pp. 143-152 10.Edwards, E. (1972), “Man and Machine: Systems for Safety. Proceedings of British Airline Pilots Associations Technical Symposium”, London, pp. 21-36. 11.A. Chen, R.S. Guo, G.S. Wu (2000), “Real-time Equipment Health Evaluation and Dynamic Preventive Maintenance”, The Ninth International Symposium on Semiconductor Manufacturing, pp. 375-378. 12.C.T. Chen, Y.W. Chen, J. Yuan (2003), “On a Dynamic Preventive Maintenance Policy for a System under Inspection”, Reliability Engineering and System Safety, Vol. 80, No. 1, pp. 41-47. 13.鄭達才(2000),「設備維護管理現在與未來」,中國生產力中心。 14.張家禎(2004),「電火工品之貝氏可靠度分析」。 15.連夷佐(2003),「橋樑維護管理生命週期成本評估模式之研究」。 16.吳南蒨(2004),「失效率老化速率減緩之週期性預防維護模型」。 17.陳清南(2006),「營建機具設備維護策略之探討-以機具租賃業為對象」。 18.陳宏彬(2007),「基於水工元件的檢查資料估算水工閘門的生命週期並即時更新可靠度」。 19.聶錦楨(2003),「異質馬可夫式衰退系統之多動作動態預防維護策略研究」。 20.蔡秉憲(2009),「應用半馬可夫過程於可靠度之研究:以電廠水泵為例」。 21.洪辰昀(2005),「馬可夫過程可修復系統加入更新隨機干擾之模型的穩定狀態機率」。 22.蔡燕純(2004),「應用馬可夫預防維護模型於維修保養策略之探討」。 23.沈暐閔(2009),「以模糊理論為基礎之人為疏失量化機率評估方法之發展」。 24.黃正宏(2007),「核三廠功率提升對安全評估之人為可靠度分析果的影響」。 25.楊詠翔(2009),「專家經驗獲取在貝氏網路運用之探討-以營建安全為例」。 26.鄭至欽(1999),「模糊理論於安全度評估之應用」。 27.Alexander Dunn (2010),「對設備維修中人為失誤的控制」,中國設備工程,第6期,第65-67頁 28.孙旋,牛秦洲,徐和飞,巫世晶,秦明,黄河潮(2006),「基于贝叶斯网络的人因可靠性评价」,中國安全科學學報,第16卷,第8期,第22-27頁。 29.张力,胡朝(2008),「核电厂维修中的人因失误分析及预防对策」,核動力工程,第29卷,第5期,第64-68頁。 30.任菊,蔡光君(2008),「电子设备维修中的人为差错与预防」,成都航空職業技術學院學報,第24卷,第2期,第31-33頁。 31.刘骁(2008),「大型系统中安全防护及人因可靠性应用研究」。
|