[1]Barki, H., and J. Hartwick. Measuring user participation, user Involvement, and
user attitude. MIS Quarterly. 18(1), 1994: 59-79.
[2]Belbin, R. M. (1993). Team roles at work. Oxford ; Boston, Butterworth-Heinemann.
[3]Blackwell, G. W., 1986, “Multidisciplinary team research”, In Chubin, D. E., et al. (Eds.)InterdisciplinaryAnalysis and Research, pp.103-114, Maryland: Lomond.
[4]Chen, S. J., Lin, L., 2004, “Modeling Team Member Characteristics for the Formation of Multifunctional Team in Concurrent Engineering”, IEEE Transactions on EngineeringManagement, vol.51, no.2, pp.111-124.
[5]Fan, Z.P., Feng, B., Jiang, Z.Z and Fu, N. , “A method member selection of R&D team using the individual and collaborative”, Expert systems with applications, 36,27 8313-8323, 2008.
[6]Gungor, Z., Serhadlioglu, G. and Kesen, S.E., “A fuzzy AHP approach to personnel selection problem”, Applied soft computing, 9, 641-646, 2009.
[7]Hauptman, O., Hirji, K. K., 1999, “Managing integration and coordination in cross-functional teams: An international study of concurrent engineering product development”, R&D Management, vol.29, no.2, pp.179-191.
[8]Holland, J. H. (1975). Adaptation in natural and artificial systems : an introductory analysis with applications to biology, control, and artificial intelligence. Ann Arbor, University of Michigan Press.
[9]Hull, F. M., Collins, P. D. and Liker, J. K., “Composite from of Organization as a Strategy for Concurrent Engineering Effectiveness”, IEEE Transactions on Engineering Management, Vol. 43, No. 2,PP. 133-142,1996.
[10]Kaiser, K., and R. Bostrom. Personality characteristics of MIS design project
teams:An empirical study and action-research design. MIS Quarterly. 6(4),
1982:43-60.
[11]Kozar, K.A., and I. Zigurs, Human and machine roles In team product reviews.Information and Management. 23, 1992: 149-157.
[12]Lawrence, I. M., W. E. Curley, et al. (1988). Differential item functioning for
males and females on SAT-verbal reading subscore items. New York (Box 886,
New York 10101-0886), College Entrance Examination Board.
[13]Mankin, D., Cohen, S. G., & Bikson, T. K. 1996. Teams and techology:
Fulfilling the promise of the new organization. Boston, MA: Harvard Business School Press.
[14]Meyer, A. D. and Hooland, B. V., “The Contribution of Manufacturing to Shortening Design Cycle Times”,
R&D Management, Vol.20, No.3, PP.229-239, 1990.
[15]Myers, I. B., 1980, Introduction to Type, CA: Consulting Psychologists Press.
[16]Myers, I. B., McCaulley, M. H., 1985, Manual: A Guide to the Development and
Use of the Myers–Briggs Type Indicator. CA: Consulting Psychologists Press.
[17]Newman, M., and D. Robey. A social process model of user-analyst relationships.MIS Quarterly. 16(2), 1992: 249-266.
[18]Palisade Corporation, “Guide to Evolver: The Genetic Algorithm Solver for
Microsoft Excel”, Newfield, New York, 1998.
[19]Rapoport, S., U. Hinterberger, et al. (1961). "[On limiting factors in respiration
and glycolysis in reticulocytes]." Acta Biol Med Ger 7: 528-531
[20]Saaty, T. L., 1977, “A Scaling Method for Priorities in Hierarchical Structure”,
Journal of Mathematical Psychology, vol.5, pp.237-281.
[21]Saaty, T. L., 1980, The Analytical Hierarchy Process, NY: McGraw-Hill.
[22]Salomore, T. A., “What Every Engineer Should Know About Concurrent Engineering? ”, Marcel Dekker Inc, 1995.
[23]Senior, B. (1997). "Team roles and team performance: Is there ''really'' a link?"
Journal of Occupational and Organizational Psychology 70: 241-258.
[24]Stalk, G., Jr., & Hout, T. M. 1990. Competing against time: How time-based
competition is reshaping global markets. New York: The Free Press.
[25]Stephens, C. Five CIO’s at work: Folklore and facts revisited. Journal of Systems
Management. 1993: 34-40.
[26]Swink, M. L., Sandvig, J. C., and Mabert, V. A.,“Adding‘Zip’Product
Development: Concurrent Engineering Methods and Tools”, Business Horizons,
PP.41-49, April 1996
[27]Syan, C. S. and Menon, U., Concurrent Engineering –concepts, implementation and practice, Chapman & Hall, London SE18HN, UK, 1994.
[28]Taylor, J. B., 1986, “Building an interdisciplinary team”, In Chubin, D. E., et al.
(Eds.)InterdisciplinaryAnalysis and Research, pp.141-154, Maryland: Lomond.
[29]Winner, R.I., Pennell, J.P., Bertrand, H.E., and Slusarczuk, M.G., “The Role of
Current Engineering in Weapons system Acquisition,” Institute for Defense
Analyses, Report R-338, December 1988.
[30]Yoshimura, M., Fujimi, Y., Izui, K., Nishiwaki, S., “Decision-making support system for human resource allocation in product development projects”, International journal of production research, 44(5), 831-848, 2006.
[31]Zakarian, A., Kusiak, A., 1999, “Forming Teams: An Analytical Approach”,
IIE Transactions,vol.31, pp.85-97.
[32]張志平、嚴永益、林師豪、徐鳴鮫,「應用同步工程改善生產系統之研究」,
中華民國品質學會第 38 屆年會暨第 8 屆全國品質管理研討會,頁30-341。
[33]陳弘毅,「運用同步工程技術落實專案計畫品質管理工作」,新新雙月刊,
第廿一卷第二期,桃園:中山科學研究院,頁100-106,1993年。
[34]賀全慶,「同步工程與專案管理」,新新雙月刊,第廿四卷第三期,桃園:
中山科學研究院,頁103-109,1996 年。
[35]胡宜中、秦漢傑,「多準則決策分析於研發專案成員選取之評估」,中原大
學工業工程學系碩士論文,2006年。
[36]王順德,「應用基因演算法於多層甲板結構物之最佳化設計」,造船及船舶
機械工程學系碩博士班論文,2002年。
[37]吳泰熙,「護理人員排班問題之求解及自動化護理人員排班系統之開發(I)」,
國立台北大學企業管理系計畫,2007年。
[38]林俊儀,「結合分析層級程序法與整數規劃求多功能團隊成員指派之最適化」,國立台北科技大學生產系統工程與管理系碩士論文,2002年。[39]王 溥,「影響專案工程團隊績效之團隊管理研究」,中山大學人力資源管
理研究所碩士論文,2000年
[40]林威旭、黃乾怡,「運用同步工程改善新產品專案開發作業流程以 Battery
Pack 為例」,中華民國品質學會第 42 屆年會暨第 12 屆全國品質管理研
討會。
[41]蕭堯仁 潘妍伶 鍾一平 林孟弘,2003,”客製化監控之基因演算經濟管制圖
設計”,中國工業工程學會第九十二年度暨學術研討會。