|
1.Allahverdi, A., Ng, C.T., Cheng, T.C.E. and Kovalyov, M. Y. (2008). A Survey of Scheduling Problems with Setup Times or Costs. European Journal of Operational Research, 187(3), 985-1032. 2.Allaoui, H. and Artiba, A. (2004). Integrating Simulation and Optimization to Schedule a Hybrid Flow Shop with Maintenance Constraints. Computers and Operations Research, 47(6), 431-450. 3.Amini, M.W.T., Racer, M. and Nejad, M.G. (2012). Alternative Supply Chain Production-Sales Policies for New Product Diffusion: an Agent-Based Modeling and Simulation Approach. European Journal of Operational Research, 216(2), 301-311. 4.Baker, K.R. (1974). Introduction to Sequencing and Scheduling, Wiley, New York. 5.Balsmeier, P.W. and Voisin, W.J. (1996). Supply Chain Management: A Time-Based Strategy. Industrial Management, 38(5), 24-27. 6.Banerjee, D., Syal, M. and Hastak, M. (2006). Material Flow-based Facility Layout Analysis of a Manufactured Housing Production Plant. Journal of Architectural Engineering, 12(4), 196-206. 7.Baud-Lavigne B., Agard B. and Penz, B. (2012). Mutual Impacts of Product Standardization and Supply Chain Design. International Journal of Production Economics , 135(1) , 50-60. 8.Berry, D., Towill, D.R. and Wadsley, N. (1994). Supply Chain Management in the Electronics Product Industry. International Journal of Physical Distribution and Logistics Management, 24(10), 20-32. 9.Celso M.H., Débora P.R., and André B.M. (2005). Minimizing Earliness and Tardiness Penalties in a Single-machine Problem with a Common Due Date. European Journal of Operational Research, 160(1), 190-201. 10.Cem, S. and Cooper, W. D. (1995). Dye Machine Scheduling and Roll Selection. Production and Inventory Management Journal-Fourth Quarter. 36(4), 64-70. 11.Charnsirisakskul, K., Griffin, P.M. and Keskinocak, P. (2006). Pricing and Scheduling Decisions with Lead-Time Flexibility. European Journal of Operational Research, 171(1), 153–169. 12.Chen, M.S. and Lan, C.H. (2001). The Maximal Profit Flow Model in Designing Multiple-Production-Line System with Obtainable Resource Capacity. International Journal of Production Economics, 70(2), 175-184. 13.Cheng, R., Gen, M. and Tozawa, T. (1995). Minmax Earliness/Tardiness Scheduling in Identical Parallel Machine System Using Genetic Algorithms. Computers & Industrial Engineering, 29(4), 513-517. 14.Cooper, Martha, C. and Ellram (1993). Characteristics of Supply Chain Management and the Implication for Purchasing and Logistics Strategy. The International Journal of Logistics Management, 4(2), 13-24. 15.Chopra, S. and Meindl, P. (2004). Supply chain management: Strategy, Planning, and Operation, 2nd ed., Pearson Prentice Hall, New Jersey. 16.Christopher, M. (1992). Logistics and Supply Chain Management: Strategies for Reducing Costs and Improving Services, 2nd ed., Financial Times/Pitman, London. 17.Ene, M., Galante, G., and Panascia, E. (2005). The Facility Layout Problem Approached Using a Fuzzy Model and a Genetic Search. Journal of Intelligent Manufacturing, 16, 303-316. 18.Fu, M., Askin, R., Fowler, J., Haghnevis, M., Keng, N., Pettinato, J.S. and Zhang, M. (2011). Batch Production Scheduling for Semiconductor Back-End Operations. IEEE Transactions on Semiconductor Manufacturing, 24(2), 249-260. 19.Fumero, Y., Corsano, G. and Montagna, J.M. (2011). Detailed Design of Multiproduct Batch Plants Considering Production Scheduling. Industrial & Engineering Chemistry Research, 50, 6146-6160. 20.Gafarov, E. R., Lazarev, A. A. and Werner, F. (2011). Single Machine Scheduling Problems with Financial Resource Constraints:Some Complexity Results and Properties. Mathematical Social Sciences, 1(1), 7-13. 21.Gao, Z. and Tang, L. (2003). A Multi-Objective Model for Purchasing of Bulk Raw Materials of a Large-Scale Integrated Steel Plant. International Journal of Production Economics, 83(3), 325-334. 22.Garcia, C.A., Ibeas, A., Herrera, J. and Vilanova, R. (2012). Inventory Control for the Supply Chain:an Adaptive Control Approach Based on the Identification of the Lead-Time. Omega, 40(3), 314-327. 23.Garg, A. (1999). An Application of Designing Products and Processes for Supply Chain Management. IIE Transactions, 31(5), 417-429. 24.Graham, R.L., Lawler, E.L., Lenstra, J.K. and Rinnooy Kan., A.H.G. (1979). Optimization and Approximation in Deterministic Sequencing and Scheduling:a Survey. Annals of Discrete Mathematics, 5(2), 287-326. 25.Handfield, R.B. and Nichols, E.L., JR. (1999). Introduction to Supply Chain Management, Prentice-Hall Inc, New York. 26.Haupt, R. (1989). A Survey of Priority Rule-Based Scheduling. OR Spektum, 11(1), 3-16. 27.Houlihan, J. (1984). Supply Chain Management. Proceedings of 19th International Technical Conference of the British Production and Inventory Control Society, 101-110. 28.Hu, S.J. and Koren, Y. (2005). Reconsider Machine Layout to Optimize Production. Manufacturing Engineering, 134(2), 81-90. 29.Irani, S.A. and Huang, H. (2006). Cascading Flow Lines and Layout Modules:Practical Strategies for Machine Duplication in Facility Layouts. International of Journal Flex Manufacture System, 17(2), 119-149. 30.Jayaraman, V. and Pirkul, H. (2001). Planning and Coordination of Production and Distribution Facilities for Multiple Commodities. European Journal of Operational Research, 133(2), 394-408. 31.Jellouli, O. and Chatelet, E. (2001). Monte Carlo Simulation and Genetic Algorithm for Optimizing Supply Chain Management in a Stochastic Environment. IEEE International Conference on Systems, Man, and Cybernetics, 3, 1835-1839. 32.Kalakota, R. and Whinston, A.B. (1996). Frontiers of Electronic Commerce, Addison-Wesley Publishing, MA. 33.Kang, J.H. and Kim, Y.D. (2012). Inventory Control in a Two-Level Supply Chain with Risk Pooling Effect. International Journal of Production Economics, 135(1), 116-124 34.Kopczak, L.R. (1997). Logistics Partnership and Supply Chain Restructuring:Survey Results from the US Computer Industry. Production and Operations Management, 6(3), 226-247. 35.Krüger, D. and Scholl, A. (2010). Managing and Modelling General Resource Transfers in (Multi-)Project Scheduling. OR Spectrum, 32(2), 369–394 36.Kumar, M.S., Islam, M.N., Lenin, N., Kumar, D.V. and Ravindran, D. (2011). A Simple Heuristic for Linear Sequencing of Machines in Layout Design. International Journal of Production Research, 49(22), 6749-6786. 37.Leachman, R.C., Benson, R.F., Liu, C. and Raar, D.J. (1996). IMPReSS: An Automated Production-planning and Delivery-Quotation System at Harris Corporation-Semiconductor Sector. INTERFACES, 26(1), 6-37. 38.Lee, C.Y. (1999). Two-Machine Flowshop Scheduling with Availability Constraints. European Journal of Operational Research, 114(2), 420-429. 39.Lee, H. and Billington, C. (1992). Management Supply Chain Inventory:Pitfalls and Opportunities. Sloan Management Science, 33(3), 65-73. 40.Li, H. and Jiang, D. (2012). New Model and Heuristics for Safety Stock Placement in General Acyclic Supply Chain Networks. Computers & Operations Research, 39(7), 1333-1344. 41.Lin, M.T. (2008). The Single-Row Machine Layout Problem in Apparel Manufacturing by Hierarchical Order-Based Genetic Algorithm. International Journal of Clothing Science and Technology, 20(5), 258-270. 42.Markland, R.E., Darby-Dowman, K.H. and Minor, E.D. (1990). Coordinated Production Scheduling for Make-to-Order Manufacturing. European Journal of Operational Research, 45(2), 155-176. 43.Mansouri, S.A., Gallear, D.A. and Mohammad H. (2012). Decision Support for Build-to-Order Supply Chain Management Through Multiobjective Optimization. International Journal of Production Economics, 135(1) , 24-36. 44.Min, L. and Cheng, W. (1999). A Genetic Algorithm for Minimizing the Makespan in the Case of Scheduling Identical Parallel Machines. Artificial Intelligence in Engineering, 13(4), 399-403. 45.Metz, P.J. (1998). Demystifying Supply Chain Management. Supply Chain Management Review, Winter Iss. 46.Min, H. and Melachrinoudis, E. (1999). The Relocation of a Hybrid Manufacturing/Distribution Facility from Supply Chain Perspectives:A Case Study. Omega, 27(1), 75-85. 47.Mizgier, K.J., Wagner, S., Holyst, M. and Janusz, A. (2012). Modeling Defaults of Companies in Multi-Stage Supply Chain Networks. International Journal of Production Economics , 135(1) , 14-23. 48.Monch, L., Zimmermannb, J. and Ottob, P. (2006). Machine Learning Techniques for Scheduling Jobs with Incompatible Families and Unequal Ready Times on Parallel Batch Machines. Engineering Applications of Artificial Intelligence, 19(3), 235-245. 49.Muth J.F. and G.L. Thompson (1963). Industrial Scheduling, Prentice-Hall, Englewood Cliffs, New Jersey. 50.Nepal, B., Monplaisir, L. and Famuyiwa, O. (2012). Matching Product Architecture with Supply Chain Design. European Journal of Operational Research , 216(2) , 312-325. 51.Newhart, D.D., Stott, K.L. and Vasko, F.J. (1993). Consolidating Product Sizes to Minimize Inventory Levels for a Multi-Stage Production and Distribution Systems. Journal of Operational Research Society, 44(7), 637-644. 52.Park, M.W. and Kim, Y.D. (1997). Search Heuristic for a Parallel Machine Scheduling Problem with Ready Times and Due Dates. Computers and Industrial Engineering, 33(3), 793-796. 53.Parnell, C. (1999). Reshaping Apparel:SCM Enterprise Control. Apparel Industry Magazine, 60(10), 14-18. 54.Petrovic, D., Roy, R. and Petrovic, R. (1998). Modelling and Simulation of a Supply Chain in an Uncertain Environment. European Journal of Operational Research, 109(2), 299-309. 55.Pinedo, M. (2002). Scheduling:Theory, Algorithms and Systems, 2nd ed., Prentice-Hall:Englewood Cliffs, New Jersey. 56.Rajagopalan, S. and Nan, X. (2012). Product Variety, Pricing and Differentiation in a Supply Chain. European Journal of Operational Research , 217(1), 84-93. 57.Robinson, E.P. and Satterfield, R.K. (1998), Designing Distribution Systems to Support Vendor Strategies in Supply Chain Management. Decision Sciences, 29(3), 685-706. 58.Ross, D.F. (1997). Competing Through Supply Chain Management: Creating Market-Winning Strategies Through Supply Chain Partnerships, Chapman & Hall, London. 59.Saunders, M.J. (1995). The Comparative Analysis of Supply Chain and Implications for the Develop of Strategies. London:Seventh Internation IPSERA Conference, 469-477 60.Simchi-Levi, D., Kaminsky, P. and Simchi-Levi, E. (2001). Designing and Managing the Supply Chain:Concepts, Strategies, and Case Studies, McGraw-Hill, Boston:Irwin. 61.Stevens, G.C. (1989). Integrating the Supply Chain. International Journal of Physical Distribution and Materials Management, 19(8), 3-8. 62.Tan, K.C., Kannan, V.J. and Handfield, R.B. (1998). Supply Chain Management:Supplier Performance and Firm Performance. International Journal of Purchasing and Materials Management, 34(3), 2-9. 63.Traham, S. (1989). International Journal of Physical Distribution and Materials Management. Integrating the Supply Chain, 19(8), 3-8. 64.Timpe, C.H. and Kallrath, J. (2000). Optimal Planning in Large Mulit-Site Production Networks. European Journal of Operational Research, 126(2), 422-435. 65.Wang, R.C. and Liang, T.F. (2004). Application of Fuzzy Multi-Objective Linear Programming to Aggregate Production Planning Computers & Industrial Engineering, 46(1), 17-41. 66.Weng, Z.K. (1997). Pricing and Ordering Strategies in Manufacturing and Distribution Alliances. IIE Transactions, 29, 681-692. 67.Xanthopoulos, A., Vlachos, D. and Iakovou, E. (2012). Optimal Newsvendor Policies for Dual-Sourcing Supply Chains:A Disruption Risk Management Framework. Computers & Operations Research , 39(2) , 350-357. 68.Yung, S.K. and Yang, C.C. (1999). Intelligent Multi-Agents for Supply Chain Management. IEEE SMC’99 Conference Proceedings, 2, 528-533. 69.Zhou, Z., Cheng, S. and Hua, B. (2000). Supply Chain Optimization of Continuous Process Industries with Sustainability Considerations. Computers and Chemical Engineering, 24, 1151-1158.
|