1.Boctor, F.F.(1990), Some efficient multi-heuristic procedures for resource-constrain -ed project scheduling,European Journal of Operational Research, 49(1), 3 -13.
2.Chen, J., and Askin, R. G. (2009). Project selection, scheduling and resource allocation with time dependent returns. European Journal of Operational Research, 193(1), 23-34.
3.Demeulemeester, E., Herroelen, W., 2002. Project Scheduling: A Research Handbook. Kluwer Academic Publishers.
4.Ghasemzadeh, F., Archer, N., and Iyogun, P. (1999). A Zero-One Model for Project Portfolio Selection and Scheduling. The Journal of the Operational Research Society, 50(7), 745-755.
5.Grefenstette, J.J. (1986)”Optimization of control parameters for genetic algorithms,”IEEE Trans. Syst., Man, Cydern., 6(1),122-128.
6.Kelley , J.E.(1963). The critical-path method: Resources planning and scheduling.
7.Kotler, P. (1980). Marketing Management Analysis, Planning, and Control (Fourth ed.): Prentice Hall Press.
8.Loch, C.H., Pich, M.T., Terwiesch, C. and Urbschat, M. (2001), Selecting R&;D Projects at BMW: A Case Study of Adopting Mathematical Programming Models. IEEE Transactions on engineering management, 48(1), 70-80.
9.Markowitz, H. (1952). Portfolio Selection. The Journal of Finance, 7(1), 77-91.
10.Metropolis, N., A. W. Rosenbluth, M. N. Rosenbluth, A. H., M. H. Teller and E. Teller(1953), Equation of state calculation by fast computing machine,The Journal of Chemical Physics, 21,1087-1092.
11.Ulrich, K. and Eppinger S. (2000). Product Design and Development, McGraw-Hill Inc, New York, 3, 38.
12.Ulrich, K. T., and Eppinger, S. D. (2008). Product Design and Development (Fourth ed.): McGraw-Hill/Irwin.
13.林慧滿,(2003),研發績效衡量系統之構建,交通大學,碩士論文。
14.黃榮村,(1995),模擬退火法應用於多資源專案排程問題之研究,國防管理學院,碩士論文。
15.蔡登茂,(1996),有限資源專案排程問題之文獻回顧研究,正修學報,第九期,頁57-74。