中文引用資料:
周至宏,2011,最佳化方法課程講義,國立高雄第一科技大學,系統資訊與控制研究所,台灣。
劉東官,2007,智慧型多目標動態生產排程系統教材,工業技術研究院,台灣。
郭瑞祥,蔣明晃,陳亞男,劉基全,2004,多廠生產規劃之供應鏈決策支援模式,臺大管理論叢,第十五卷第一期,頁49-74。陳建良,1995,排程概述,機械工業雜誌,153期,頁122-137,台灣。黃國祐,2009, "考量相依整備時間之完工時間最小化的非等效平行機問題",國立臺灣科技大學,碩士論文。林麗莉,2008, "具利潤分享機制的二層級供應鏈協同生產規劃" ,朝陽科技大學,碩士論文。劉鎮瑋, 2012, "具資源限制及非等效平行機台考量之流程型生產排程問題" ,國立雲林科技大學,碩士論文。陳彥竹,2009, “結合共享基因演算法與區段搜尋最佳化零工工廠排程問題" , 大同大學,碩士論文。王治平,2003, “實際零工式生產排程問題的派工法則” ,國立政治大學,碩士論文。英文引用資料:
A.S.Fraser, 1957, ”Simulation of genetic systems by automatic digital computers”, International Journal of Biological Sciences , vol. 10, pp. 484–491.
Arora, 1998, "Polynomial time approximation schemes for Euclidean traveling salesman and other geometric problems", Journal of the ACM (JACM) Volume 45 Issue 5.
A. Hertz, M. Widmer, 1996, "An improved tabu search approach for solving the job shop scheduling problem with tooling constraints", Discrete Applied Mathematics 65, 319-346.
Bagley, 1967, The Behavior of Adaptive Systems which Employ Genetic and Correlation Algorithms, University of Michigan, Michigan, USA, Doctoral Dissertation.
Beamon BM, 1998, “Supply chain design and analysis: models and method.Int. J. Production Economics 55 (1998) 281–94.
Conway, R. W., et al., 1967, Theory of Scheduling, Addison-Wesley.
D.R. Sule, 1999, Logistics of Facility Location and Allocation, Marcel Dekker Inc., New York, NY.
Felix T.S. Chan, S.H. Chung, L.Y. Chan, G. Finke, M.K. Tiwari, 2006, “Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach”, Robotics and Computer-Integrated Manufacturing 22 (2006) 493–504.
Felix T.S. Chan, S.H. Chung, P.L.Y. Chan, 2005, "An adaptive genetic algorithm with dominated genes for distributed scheduling problems", Expert Systems with Applications 29 (2005) 364–371.
Goldberg, 1989. Genetic Algorithms in Search, Optimization and Machine Learning, Wesley Longman, Boston.
Graham, 1966, “Bounds for certain multiprocessing anomalies”, Bell System Technical Journal, vol. 45, pp. 1563–1581.
Graham, R.L., et al., 1979, “Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey”, Ann. Discrete Math, 5, pp.287-326.
H.Z. Jia, J.Y.H. Fuh, A.Y.C. Nee, Y.F. Zhang, 2003, “A modified genetic algorithm for distributed scheduling problems”, Journal of Intelligent Manufacturing 15(2003) 351–362.
J.Holland, 1975, Adaptation in Natural and Artificial Systems, University of Michigan Press, Michigan.
Kawanaka, H., 2001, "Genetic algorithm with the constraints for nurse scheduling problem", Department of Electrical and Electronic Engineering, Faculty of Engineering, Mie University.
Kim, D. W., Kim, K. H., Jang, W., and Chen, F. F., 2002, ”Unrelated parallel machine scheduling with setup times using simulated annealing”, Robotics And Computer-Integrated Manufacturing, Vol.18, pp.223-231.
L. De Giovanni, F. Pezzella, 2010, ” An Improved Genetic Algorithm for the Distributed and Flexible Job-shop Scheduling problem”, European Journal of Operational Research 200 (2010) 395–408
M. Gen and R. Cheng, 1997, Genetic algorithms and engineering design, John Wiley and Sons, New York .
M. Garey, D. Johnson and R. Sethi, 1976, The complexity of flow shop and job shop scheduling, Mathematics of Operations Research 1 (2) (1976) 117-129.
Cheng, T. E. E., and Diamond, J. E., 1995, ”Scheduling Two Job Classes on Parallel Machines”, IIE Transactions, Vol.27, pp.689-693.
Pinedo, Michael, 1995, Scheduling: Theory, algorithms, and systems, Prentice Hall , Englewood Cliffs, N.J.