【英文文獻】
1. Alonso, G. &; Schek, H. J. (1996). “Research issues in large workflow management systems,” In Proceedings of NSF Workshop on Workflow and Process Automation in Information Science, pp 126-132.
2. Bernus, P. &; Nemes, L. (1995). “Enterprise integration: engineering tools for designing enterprises,” Heron, 8, pp.1-11.
3. Bond, B., Burdick, D., Miklovic, D., Pond, K., &; Eschinger, C. (1999). “C-commerce: The new arena for business applications,” Research Note, Gartner Group.
4. Collins, T. (1999). “Striking it big together,” Supply Management, 4, pp. 28-30.
5. Davenport, T. H. &; Short, J. E. (1990). “The new industrial engineering: Information technology and business process redesign,” Sloan Management Review, 31 (4), pp. 11-27.
6. Davenport, T. H. (1993). “Process innovation: Reengineering work through information technology,” Boston: Harvard Business Press.
7. Delphi Group (2005), “BPM 2005 market milestone report,” A Delphi Group White Paper, p. 5.
8. Ford Motor Company (1988), “Potential failure mode and effects analysis,” Instruction Manual.
9. Georgakopoulos, D., Hornick, M., &; Sheth, A. (1995). “An overview of workflow management: From process modeling to workflow automation infrastructure,” Distributed and Parallel Databases, 3 (2), pp. 119-153.
10. Harrington, H. J. (1991). “Business process improvement: The breakthrough trategy for total quality, productivity, and competitiveness,” New York: McGraw-Hill.
11. Hammer, M. (1990). “Reengineering work: Don't automate, obliterate,” Harvard Business Review, 68(4), pp. 104-112.
12. Hammer, M. &; Champy, J. (1993). “Reengineering the corporation: A manifesto for business revolution,” Business Horizons, 36 (5), pp. 90-91.
13. Hollingsworth, D. (1995). “The workflow reference model,” Workflow Management Coalition, pp. 6-18
14. Hronec, S. M. &; Andersen, A. (1993). “Vital signs: Using quality, time, and cost performance measurements to chart your company's future,” New York: Amacom.
15. IBM (2012). “Leading through connections,” CEO C-suite Studies, p. 46.
16. Li, H. &; Shi, M. (1999). “Application of agents in workflow management system,” APCC/OECC '99. Fifth Asia-Pacific Conference on Communications and Fourth Optoelectronics and Communications Conference, 2, pp. 1068-1072.
17. McCready, S. (1992). “There is more than one kind of workflow software,” Computerworld, 2, pp. 86-90.
18. Marchand, D. &; Stanford, M. (1995). “Business process redesign: A framework for harmonizing people, information and technology,” Business Process Change: Reengineering Concepts, Methods and Technologies, pp. 34-56.
19. Mohan, C. (1996). “State of the art in workflow management research and products,” ACM SIGMOD International Conference on Management of Data, 25 (2), pp. 544-560.
20. Rakich, J. S., Longest Jr, B. B., Darr, K., &; Guerrieri, L. R. (1993). “Managing health services organizations,” Journal for Nurses in Professional Development, 9 (3), p. 162.
21. Smith, H. &; Fingar, P. (2002). “Business process management: The third wave,” Florida: Meghan-Kiffer Press.
22. Stamatis, D. H. (2003). “Failure mode and effect analysis: FMEA from theory to execution,” Milwakee: ASQ Quality Press.
23. Teng, S. H. G. &; Ho, S. Y. M. (1996). “Failure mode and effects analysis: an integrated approach for product design and process control,” International Journal of Quality &; Reliability Management, 13 (5), pp. 8-26.
24. Tenner, A. R. &; DeToro, I. J. (1997). “Process redesign: the implementation guide for managers,” Reading: Addison-Wesley.
【中文文獻】
1. 李訓仁 (2007),「BPM資訊系統實務應用特性之研究」,中原大學資訊管理研究所碩士論文。
2. 吳萬益 (2011),「企業經營與診斷」,台北:前程文化。
3. 屈君懋 (2010),「企業流程分析方法之研究」,國立中山大學資訊管理研究所碩士論文。4. 曹健齡、楊義明 (1997),「失效模式與效應分析的作業方式」,品質管制月刊,第33卷第4期,頁 55-59。5. 張清亮、陳文欽、蔡志弘 (1999),「CE認證之產品風險分析─以一般醫療器材為例」,機械工業,第191期,頁 154-162。6. 張慶童 (2006),「壽險業IT導入BPM之研究-以個案公司系統再造為例」,國立政治大學經營管理碩士學程資訊管理組論文。7. 莊秀文、許國敏、莊淑婷 (2006),「病人安全與風險管理實務導引」,台北:華杏。
8. 連茂森 (2006),「企業導入商業流程管理系統之個案研究」,國立臺灣科技大學資訊管理研究所碩士論文。9. 黃敬仁、廖麗滿 (2008),「企業電子化之彈性工作流程建構機制設計」,技術學刊,第23卷第2期,頁 71-82.10. 黃彥棻 (2012),「特力集團打造零售四合一計畫」,iThome電腦報,第578期,頁 20-22。
11. 梁嘉凱 (2000),「企業程序管理應用之個案研究」,東吳大學企業管理研究所碩士論文。12. 梁賓先 (2004),「BPM≠Workflow+EAI」Available online: http://www.flowring.com/pagelogic/mainpage.jsp?pl=ma300010040000tc. (Downloaded: December 12, 2013)。
13. 陳玲君 (2013),「台灣IC先進封測產業發展策略與趨勢」,經濟部投資業務處全球台商e焦點電子報, 第243期,Available online: http://twbusiness.nat.gov.tw/epaperArticle.do?id=239042567. (Downloaded: November 6, 2013)。
14. 游佳萍 (1997),「企業流程分析模式之設計與實作」,國立中山大學資訊管理系碩士論文。15. 潘建光、楊尚文 (2012),「2012年台灣IC製造與封測產業發展回顧與展望」,資策會。
16. 謝財源、張忠孝、鐘清章、邱柏松、王英一 (1990),「可靠度管理手冊」,中華民國品質管制學會, 頁 195-211。
17. 羅應浮 (2000),「專案管理的失效模式與效應分析」,中華大學工業工程管理研究所碩士論文。