|
Ahmadi, J. H., Ahmadi, R. H., Dasu, S., &; Tang, C. S. (1992). Batching and scheduling jobs on batch and discrete processors. Operations research, 40(4), 750-763. Albers, S., &; Brucker, P. (1993). The complexity of one-machine batching problems. Discrete Applied Mathematics, 47(2), 87-107. Attar, S., Mohammadi, M., &; Tavakkoli-Moghaddam, R. (2013). Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times. The International Journal of Advanced Manufacturing Technology, 68(5-8), 1583-1599. Baker, K. R., &; Jia, D. (1993). A comparative study of lot streaming procedures. Omega, 21(5), 561-566. Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M. Y., Potts, C., Tautenhahn, T., &; Van De Velde, S. (1997). Scheduling A Batching Machine 1. Chang, P.-Y., Damodaran*, P., &; Melouk, S. (2004). Minimizing makespan on parallel batch processing machines. International Journal of Production Research, 42(19), 4211-4220. Fanti, M., Maione, B., Piscitelli, G., &; Turchiano, B. (1996). Heuristic scheduling of jobs on a multi-product batch processing machine. International Journal of Production Research, 34(8), 2163-2186. Grabowski, J., &; Pempera, J. (2000). Sequencing of jobs in some production system. European Journal of Operational Research, 125(3), 535-550. Guinet, A. (1991). Textile production systems: a succession of non-identical parallel processor shops. Journal of the Operational Research Society, 655-671. Gupta, J. N. (1988). Two-stage, hybrid flowshop scheduling problem. Journal of the Operational Research Society, 359-364. Jacobs, F. R., &; Bragg, D. J. (1988). Repetitive Lots: Flow-time Reductions through Sequencing and Dynamic Batch Sizing. Decision Sciences, 19(2), 281-294. Jin, Z., Ohno, K., Ito, T., &; Elmaghraby, S. (2002). Scheduling Hybrid Flowshops in Printed Circuit Board Assembly Lines. Production and Operations Management, 11(2), 216-230. Johnson, S. M. (1954). Optimal two&;#8208;and three&;#8208;stage production schedules with setup times included. Naval research logistics quarterly, 1(1), 61-68. Kropp, D. H., &; Smunt, T. L. (1990). Optimal and heuristic models for lot splitting in a flow shop. Decision Sciences, 21(4), 691-709. Linn, R., &; Zhang, W. (1999). Hybrid flow shop scheduling: a survey. Computers &; industrial engineering, 37(1), 57-61. Liu, C.-Y., &; Chang, S.-C. (2000). Scheduling flexible flow shops with sequence-dependent setup effects. Robotics and Automation, IEEE Transactions on, 16(4), 408-419. Liu, S., Cui, J., &; Li, Y. (2008). Heuristic-tabu algorithm for hybrid flowshop scheduling with limited waiting time. Paper presented at the Computational Intelligence and Design, 2008. ISCID''08. International Symposium on. Mathirajan, M., Sivakumar, A., &; Chandru, V. (2004). Scheduling algorithms for heterogeneous batch processors with incompatible job-families. Journal of Intelligent Manufacturing, 15(6), 787-803. Potts, C. N., &; Kovalyov, M. Y. (2000). Scheduling with batching: a review. European Journal of Operational Research, 120(2), 228-249. Potts, C. N., &; Van Wassenhove, L. N. (1992). Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. Journal of the Operational Research Society, 395-406. Ram, B., &; Patel, G. (1998). Modeling furnace operations using simulation and heuristics. Paper presented at the Proceedings of the 30th conference on Winter simulation. Ramasesh, R. V., Fu, H., Fong, D. K., &; Hayya, J. C. (2000). Lot streaming in multistage production systems. International Journal of Production Economics, 66(3), 199-211. Robinson, J. K., &; Giglio, R. (1999). Capacity planning for semiconductor wafer fabrication with time constraints between operations. Paper presented at the Simulation Conference Proceedings, 1999 Winter. Ruiz, R., &; Vazquez-Rodriguez, J. A. (2010). The hybrid flow shop scheduling problem. European Journal of Operational Research, 205(1), 1-18. Scholl, W., &; Domaschke, J. (2000). Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations. Semiconductor Manufacturing, IEEE Transactions on, 13(3), 273-277. Sherali, H. D., Sarin, S. C., &; Kodialam, M. S. (1990). Models and algorithms for a two-stage production process. Production Planning &; Control, 1(1), 27-39. Su, L.-H. (2003). A hybrid two-stage flowshop with limited waiting time constraints. Computers &; industrial engineering, 44(3), 409-424. Trietsch, D., &; Baker, K. R. (1993). Basic techniques for lot streaming. Operations research, 41(6), 1065-1076. Van De Rzee, D., Van Harten, A., &; Schuur, P. (1997). Dynamic job assignment heuristics for multi-server batch operations-a cost based approach. International Journal of Production Research, 35(11), 3063-3094. Webster, S., &; Baker, K. R. (1995). Scheduling groups of jobs on a single machine. Operations Research, 43(4), 692-703. Weng, W. W., &; Leachman, R. C. (1993). An improved methodology for real-time production decisions at batch-process work stations. Semiconductor Manufacturing, IEEE Transactions on, 6(3), 219-225. Wittrock, R. J. (1985). Scheduling algorithms for flexible flow lines. IBM Journal of Research and Development, 29(4), 401-412. Wittrock, R. J. (1988). An adaptable scheduling algorithm for flexible flow lines. Operations research, 36(3), 445-453. Wu, C.-H., Lin, J. T., &; Chien, W.-C. (2012). Dynamic production control in parallel processing systems under process queue time constraints. Computers &; industrial engineering, 63(1), 192-203. Yang, D.-L., &; Chern, M.-S. (1995). A two-machine flowshop sequencing problem with limited waiting time constraints. Computers &; industrial engineering, 28(1), 63-70. Yuan, J., Liu, Z., Ng, C., &; Cheng, T. E. (2004). The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan. Theoretical Computer Science, 320(2), 199-212. Zhang, W., Yin, C., Liu, J., &; Linn, R. J. (2005). Multi-job lot streaming to minimize the mean completion time in< i> m-1 hybrid flowshops. International Journal of Production Economics, 96(2), 189-200. 林則孟, 蔡建基, 陳盈彥, &; 陳子立. (2009). 考量等候時間限制之半導體爐管機台派工法則. Journal of Advanced Engineering, 4(3), 273-278. 張玉鈍和曾毓文. (2000). 運用系統模擬與遺傳演算法從事非相關平行機器排程之研究. Paper presented at the 科技與管理學術研討會. 陳幸滿. (2003). 雙機流程型生產環境下具批量流與等候時間限制的多產品排程問題. 中央大學.
|