研究生:Bolor-Saikhan
研究生(外文):Bolorsaikhan Gankhuyag
論文名稱:Use Analytic Hierarchy Process for Subcontractor Evaluation in Construction Industry in Mongolia: A Case study
論文名稱(外文):Use Analytic Hierarchy Process for Subcontractor Evaluation in Construction Industry in Mongolia: A Case study
指導教授:蔡佩芳, PhD
指導教授(外文):Pei - Fang Tsai, PhD
口試委員:段葉芳 , PhD鄭辰仰, PhDShu-Jen Steven Tsai, PhD
口試委員(外文):Yeh-Fand Duann, PhDChen Yang Cheng, PhDShu-Jen Steven Tsai, PhD
口試日期:2016-06-29
學位類別:碩士
校院名稱:國立臺北科技大學
系所名稱:管理國際學生碩士專班 (IMBA)
學門:商業及管理學門
學類:企業管理學類
論文種類:學術論文
畢業學年度:104
中文關鍵詞:Subcontractor evaluationConstruction managementAnalytic hierarchy process (AHP)Evaluation criteriaMongolian construction
外文關鍵詞:Subcontractor evaluationConstruction managementAnalytic hierarchy process (AHP)Evaluation criteriaMongolian construction.
相關次數:
  • 被引用被引用:0
  • 點閱點閱:68
  • 評分評分:系統版面圖檔系統版面圖檔系統版面圖檔系統版面圖檔系統版面圖檔
  • 下載下載:7
  • 收藏至我的研究室書目清單書目收藏:0
Construction has become one of the most important industries of the economy in the developing countries like Mongolia. Nowadays, up to 80 percent of the performance in the building project are completed by subcontractors in the construction industry. The performance evaluation has been a significant issue for construction management, as most of the subcontractor evaluation systems are concerned with the decision of subcontractor selections. The main purpose of the research is to identify critical factors of the subcontractor’s performance evaluation in Mongolian building construction industry.
The research methodology involves two phases. In the first phase, critical evaluation criteria are to be determined among a list of factors related to subcontractor performance. Based on the literature, a list of 32 potential criteria and based on the informal discussion with a number of experts in construction, 21 potential criteria were selected for further consideration. Then, several face to face interviews were conducted with subject experts in Mongolia. Out of the 53 potential factors, a consensus was reached on 16 critical criteria for most of the construction projects in Mongolia.
In the second phase, a pairwise comparison questionnaire survey was conducted to find the relative weights among these critical criteria from the previous interviews. Moreover, these 16 selected criteria were classified into 4 dimensions: Subcontractor Management, Resources, Quality, and On-site Performance. Each criterion was weighted in the subcontractor evaluation process using the Analytic Hierarchy Process (AHP) analysis. It was found that the two competitive dimensions were: Quality, which had the highest weight of 0.346, and Management, with weights of 0.336. The most important criterion was about the accuracy, with the weight of 0.1570.
Construction has become one of the most important industries of the economy in the developing countries like Mongolia. Nowadays, up to 80 percent of the performance in the building project are completed by subcontractors in the construction industry. The performance evaluation has been a significant issue for construction management, as most of the subcontractor evaluation systems are concerned with the decision of subcontractor selections. The main purpose of the research is to identify critical factors of the subcontractor’s performance evaluation in Mongolian building construction industry.
The research methodology involves two phases. In the first phase, critical evaluation criteria are to be determined among a list of factors related to subcontractor performance. Based on the literature, a list of 32 potential criteria and based on the informal discussion with a number of experts in construction, 21 potential criteria were selected for further consideration. Then, several face to face interviews were conducted with subject experts in Mongolia. Out of the 53 potential factors, a consensus was reached on 16 critical criteria for most of the construction projects in Mongolia.
In the second phase, a pairwise comparison questionnaire survey was conducted to find the relative weights among these critical criteria from the previous interviews. Moreover, these 16 selected criteria were classified into 4 dimensions: Subcontractor Management, Resources, Quality, and On-site Performance. Each criterion was weighted in the subcontractor evaluation process using the Analytic Hierarchy Process (AHP) analysis. It was found that the two competitive dimensions were: Quality, which had the highest weight of 0.346, and Management, with weights of 0.336. The most important criterion was about the accuracy, with the weight of 0.1570.
ABSTRACT i
ACKNOWLEDGMENT iii
List of Tables v
List of Figures vi
Chapter 1. INTRODUCTION 1
1.1. Background 1
1.2. Motivation 4
1.3. Purpose of Research 6
1.4. Limitation of Research 7
1.5. Organization of the Thesis 7
Chapter 2. LITERATURE REVIEW 9
2.1. Subcontracting in construction 9
2.2. Performance measurement in the construction 14
2.3. Analytic hierarchy process (AHP) 19
Chapter 3. METHODOLOGY 27
3.1. Research framework 27
3.2. Potential criteria identification 29
3.2.1. Literature review 29
3.2.2. Informal group discussion 31
3.3. Criteria elimination and classification 33
3.3.1. Interview 33
3.3.2 Principals of dimensions and criteria selection 35
3.4. Questionnaire survey 38
3.5. AHP analysis 41
3.5.1. The hierarchy structure 42
3.5.2. The calculation of the AHP analysis 44
Chapter 4. RESULT 46
4.1. Survey responses 46
4.2. Aggregated result 55
Chapter 5. CONCLUSION 59
References 62