|
Ahac, M., & Lakušić, S. (2015). Tram track maintenance-planning by gauge degradation modelling. Transport, 30(4), 430-436. Andrade, A. R., & Teixeira, P. F. (2011). Uncertainty in rail-track geometry degradation: Lisbon-Oporto line case study. Journal of transportation engineering, 137(3), 193-200. Andrade, A. R., & Teixeira, P. F. (2012). A Bayesian model to assess rail track geometry degradation through its life-cycle. Research in transportation economics, 36(1), 1-8. Andrade, A. R., & Teixeira, P. F. (2015). Statistical modelling of railway track geometry degradation using hierarchical Bayesian models. Reliability Engineering & System Safety, 142, 169-183. Bai, L., Liu, R., Sun, Q., Wang, F., & Xu, P. (2015). Markov-based model for the prediction of railway track irregularities. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of rail and rapid transit, 229(2), 150-159. Bai, L., Liu, R., Sun, Q., Wang, F., & Wang, F. (2016). Classification-learning-based framework for predicting railway track irregularities. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 230(2), 598-610. Bocciolone, M., Caprioli, A., Cigada, A., & Collina, A. (2007). A measurement system for quick rail inspection and effective track maintenance strategy. Mechanical Systems and Signal Processing, 21(3), 1242-1254. Boland, N., Kalinowski, T., Waterer, H., & Zheng, L. (2013). Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain. Journal of Scheduling, 16(6), 649-659. Boland, N., Kalinowski, T., & Kaur, S. (2015). Scheduling network maintenance jobs with release dates and deadlines to maximize total flow over time: Bounds and solution strategies. Computers & Operations Research, 64, 113-129. Caetano, L. F., & Teixeira, P. F. (2013). Availability approach to optimizing railway track renewal operations. Journal of Transportation Engineering, 139(9), 941-948. Caprioli, A., Cigada, A., & Raveglia, D. (2007). Rail inspection in track maintenance: A benchmark between the wavelet approach and the more conventional Fourier analysis. Mechanical Systems and Signal Processing, 21(2), 631-652. Chaolong, J., Weixiang, X., Futian, W., & Hanning, W. (2012). Track irregularity time series analysis and trend forecasting. Discrete Dynamics in Nature and Society, 2012. Chang, H., Liu, R., & Li, Q. (2010). A multi-stage linear prediction model for the irregularity of the longitudinal level over unit railway sections. WIT Transactions on The Built Environment, 114, 641-650. Chattopadhyay, G., Reddy, V., & Larsson‐Kråik, P. O. (2005). Decision on economical rail grinding interval for controlling rolling contact fatigue. International Transactions in Operational Research, 12(6), 545-558. Famurewa, S. M., Xin, T., Rantatalo, M., & Kumar, U. (2015). Optimisation of maintenance track possession time: A tamping case study. Proceedings of the institution of mechanical engineers, Part F: journal of rail and rapid transit, 229(1), 12-22. Fokkert, J. V. Z. D., den Hertog, D., Berg, F. V. D., & Verhoeven, J. H. M. (2007). The Netherlands schedules track maintenance to improve track workers’ safety. Interfaces, 37(2), 133-142. Fumeo, E., Oneto, L., & Anguita, D. (2015). Condition based maintenance in railway transportation systems based on big data streaming analysis. Procedia Computer Science, 53, 437-446. FURUKAWA, A., & YOSHIMURA, A. (2005). Identification of rolling stock lateral dynamic characteristics and their track irregularity maintenance applications. Quarterly Report of RTRI, 46(1), 7-12. Ga, C., & Rahman, A. (2006). Analysis of Rail Failure Data for Developing Predictive Models and Estimation of Model Parameters. Heinicke, F., Simroth, A., Scheithauer, G., & Fischer, A. (2014). On a Railway Maintenance Scheduling Problem with Customer Costs and Multi-Depots. Technical Report MATH-NM-01-2014. TU-Dresden. Dresden, Germany. URL: http://www. math. tu-dresden. de/~ scheith/ABSTRACTS/PREPRINTS/14-Heinicke. pdf. Higgins, A., Ferreira, L., & Lake, M. (1999). Scheduling rail track maintenance to minimise overall delays. Jeong, D. Y. (2003). Analytical modelling of rail defects and its applications to rail defect management. Volpe National Transportation Center. Kaiser, K. M. (2007). A simulation study of predictive maintenance policies and how they impact manufacturing systems. The University of Iowa. Kamiyama, M., Furukawa, A. Y. A., & Mori, T. (1998). Software for railway track irregularity correction using heavy tamping machine. WIT Transactions on The Built Environment, 37. Karttunen, K. (2012). Mechanical track deterioration due to lateral geometry irregularities. Kawaguchi, A., Miwa, M., & Terada, K. (2005). Actual data analysis of alignment irregularity growth and its prediction model. Quarterly report of RTRI, 46(4), 262-268. Kumar, S. (2006). A study of the rail degradation process to predict rail breaks (Doctoral dissertation, Luleå tekniska universitet). Lake, M., Ferreira, L., & Kozan, E. (2002). Heuristic techniques for scheduling railway track maintenance. Operations research/management science at work, 177-187. Lamson, S. T., Hastings, N. A. J., & Willis, R. J. (1983). Minimum cost maintenance in heavy haul rail track. Journal of the Operational Research Society, 211-223. Li, H. (2013). Application of the grey system theory in analysis of track irregularity. Journal of Computational Science & Engineering, 9, 314-319. Lin, Z. L., Huang, Y. S., & Fang, C. C. (2015). Non-periodic preventive maintenance with reliability thresholds for complex repairable systems. Reliability Engineering & System Safety, 136, 145-156. Liu, X., Dick, C. T., Lovett, A., Saat, M. R., & Barkan, C. P. (2013, October). Seasonal effect on the optimization of rail defect inspection frequency. In ASME 2013 Rail Transportation Division Fall Technical Conference (pp. V001T01A008-V001T01A008). American Society of Mechanical Engineers. Lönnbark, G. (2012). Characterization of track irregularities with respect to vehicle response. Lovett, A. H., Barkan, C. P., & Dick, C. T. (2013). An Integrated Model for the Evaluation and Planning of Railroad Track Maintenance. Urbana, 51, 61801. Lovett, A. H., Dick, C. T., Ruppert, C., Saat, M. R., & Barkan, C. (2013, April). Development of an integrated model for the evaluation and planning of railroad track maintenance. In 2013 joint rail conference (pp. V001T01A003-V001T01A003). American Society of Mechanical Engineers. Lovett, A. H., Dick, C. T., Ruppert, C., & Barkan, C. P. (2015). Cost and Delay of Railroad Timber and Concrete Crosstie Maintenance and Replacement. Transportation Research Record: Journal of the Transportation Research Board, (2476), 37-44. Lyngby, N. (2009). Railway Track Degradation: Shape and Influencing Factors. International Journal of Performability Engineering, 5(2). Masashi, M. I. W. A. (2002). Mathematical programming model analysis for the optimal track maintenance schedule. Quarterly Report of RTRI, 43(3), 131-136. Meier-Hirmer, C., Riboulet, G., Sourget, F., & Roussignol, M. (2009). Maintenance optimization for a system with a gamma deterioration process and intervention delay: application to track maintenance. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 223(3), 189-198. Minsili, L. S., Jérémie, M. D., Simo, G. L. T., & Simo, C. (2012). Preventive maintenance of railway tracks: Ballast performance anticipation in the Cameroon railway. Research Journal of Applied Sciences, Engineering and Technology, 4(5), 398-406. Mohammadzadeh, S., Mosayebi, S. A., & Moosapoor, R. (2013). Investigating on the Effects of Random Irregularities of Railway Track by Half-Bogie Model. Advances in Railway Engineering, An International Journal, 1(1), 61-75. Neilsen, J. B. (1999). Evolution of rail corrugation predicted with a non-linear wear model. Journal of Sound and Vibration, 227(5), 915-933. Olofsson, U., & Nilsson, R. (2002). Surface cracks and wear of rail: A full-scale test on a commuter train track. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 216(4), 249-264. Patra, A. P. (2009). Maintenance decision support models for railway infrastructure using RAMS & LCC analyses (Doctoral dissertation, Luleå tekniska universitet). Pedregal, D. J., Garcı́a, F. P., & Schmid, F. (2004). RCM 2 predictive maintenance of railway systems based on unobserved components models. Reliability Engineering & System Safety, 83(1), 103-110. Peng, F., Kang, S., Li, X., Ouyang, Y., Somani, K., & Acharya, D. (2011). A heuristic approach to the railroad track maintenance scheduling problem. Computer‐Aided Civil and Infrastructure Engineering, 26(2), 129-145. Peng, F., & Ouyang, Y. (2012). Track maintenance production team scheduling in railroad networks. Transportation Research Part B: Methodological, 46(10), 1474-1488. Peng, F., Ouyang, Y., & Somani, K. (2013). Optimal routing and scheduling of periodic inspections in large-scale railroad networks. Journal of Rail Transport Planning & Management, 3(4), 163-171. Peng, F., & Ouyang, Y. (2014). Optimal clustering of railroad track maintenance jobs. Computer‐Aided Civil and Infrastructure Engineering, 29(4), 235-247. Pombo, J., & Ambrósio, J. (2012). An alternative method to include track irregularities in railway vehicle dynamic analyses. Nonlinear Dynamics, 68(1), 161-176. Quiroga, L., Antoni, M., & Schnieder, E. (2011). Heuristic based track maintenance scheduling optimisation. In 9th World Conference on Railway Research, Lille. URL: http://www. railway-research. org/IMG/pdf/g2_schnider_eckehard. pdf. Reddy, V. (2007). Development of an integrated model for assessment of operational risks in rail track (Doctoral dissertation, Queensland University of Technology). Rhayma, N., Bressolette, P., Breul, P., Fogli, M., & Saussine, G. (2013). Reliability analysis of maintenance operations for railway tracks. Reliability Engineering & System Safety, 114, 12-25. Santos, R., Teixeira, P. F., & Antunes, A. P. (2015). Planning and scheduling efficient heavy rail track maintenance through a Decision Rules Model. Research in Transportation Economics, 54, 20-32. Sato, Y. (1995). Japanese studies on deterioration of ballasted track. Vehicle system dynamics, 24(sup1), 197-208. Sato, Y., Yahagi, H., & Onodera, T. (2014). Development of a Technique to Predict Track Irregularity by Analyzing Frequently Obtained Data. JR East Technical Review, 29. Shyr, F. Y., & Ben-Akiva, M. (1996). Modeling rail fatigue behavior with multiple hazards. Journal of Infrastructure Systems, 2(2), 73-82. Steenbergen, M., & de Jong, E. (2016). Railway track degradation: The contribution of rolling stock. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 230(4), 1164-1171. Soleimanmeigouni, I., Ahmadi, A., & Kumar, U. (2016). Track geometry degradation and maintenance modelling: A review. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 0954409716657849. Uzarski, D., & McNeil, S. (1994). Technologies for planning railroad track maintenance and renewal. Journal of transportation engineering, 120(5), 807-820. Vale, C., Ribeiro, I. M., & Calçada, R. (2011). Integer programming to optimize tamping in railway tracks as preventive maintenance. Journal of Transportation Engineering, 138(1), 123-131. Vale, C., & Lurdes, S. M. (2013). Stochastic model for the geometrical rail track degradation process in the Portuguese railway Northern Line. Reliability Engineering & System Safety, 116, 91-98. Wang, Z. C., Song, Y., & Wang, J. X. (2014). Relation Between Track Irregularity of Speed-Increased Railway and Dynamic Speed Limits Through Simulation. Open Mechanical Engineering Journal, 8, 197-200. Wen, M., Li, R., & Salling, K. B. (2016). Optimization of preventive condition-based tamping for railway tracks. European Journal of Operational Research, 252(2), 455-465. Xu, P., Liu, R., Wang, F., Sun, Q., & Teng, H. (2011). A novel description method for track irregularity evolution. International Journal of Computational Intelligence Systems, 4(6), 1358-1366. Xu, P., Liu, R. K., Wang, F., Wang, F. T., & Sun, Q. X. (2013). Railroad track deterioration characteristics based track measurement data mining. Mathematical Problems in Engineering, 2013. Xu, P., Sun, Q., Liu, R., & Wang, F. (2011). A short-range prediction model for track quality index. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 225(3), 277-285. Yang, J., & Ji, H. (2012). A novel track maintenance algorithm for PHD/CPHD filter. Signal Processing, 92(10), 2371-2380. Yousefikia, M., Moridpour, S., Setunge, S., & Mazloumi, E. (2014). Modeling degradation of tracks for maintenance planning on a tram line. J Traffic Logist Eng, 2(2). Zhang, T., Andrews, J., & Wang, R. (2013). Optimal scheduling of track maintenance on a railway network. Quality and Reliability Engineering International, 29(2), 285-297. Zhao, J., Chan, A. H. C., & Stirling, A. B. (2006, January). Risk analysis of derailment induced by rail breaks-a probabilistic approach. In Reliability and Maintainability Symposium, 2006. RAMS''06. Annual (pp. 486-491). IEEE. Zhao, J., Chan, A. H. C., Roberts, C., & Stirling, A. B. (2006). Assessing the economic life of rail using a stochastic analysis of failures. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 220(2), 103-111. Zhao, J., Chan, A. H. C., & Burrow, M. P. N. (2009). A genetic-algorithm-based approach for scheduling the renewal of railway track components. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 223(6), 533-541. Zobory, I. (1997). Prediction of wheel/rail profile wear. Vehicle System Dynamics, 28(2-3), 221-259. 王兆賢. (2000). 鐵路路線養護優先順位排序方法之研究 (Doctoral dissertation).
|