|
Reference
Albin SL, Chao S (1992) Preventive Replacement in Systems with Dependent Components. Blanchard BS, Fabrycky WJ, Fabrycky WJ (1990) Systems engineering and analysis, vol 4. Prentice Hall Englewood Cliffs, NJ, Bloch-Mercier S (2002) A preventive maintenance policy with sequential checking procedure for a Markov deteriorating system. European Journal of Operational Research 142 (3):548-576 Cheng T (1991) An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE transactions 23 (1):23-28 Chiu SW, Wang S-L, Chiu Y-SP (2007) Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research 180 (2):664-676. doi:10.1016/j.ejor.2006.05.005 Chiu Y-SP, Chang H-H (2014) Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note. Economic Modelling 37:143-148. doi:10.1016/j.econmod.2013.11.006 Curcurù G, Galante G, Lombardo A (2010) A predictive maintenance policy with imperfect monitoring. Reliability Engineering & System Safety 95 (9):989-997. doi:10.1016/j.ress.2010.04.010 Daily J, Peterson J (2017) Predictive Maintenance: How Big Data Analysis Can Improve Maintenance. In: Supply Chain Integration Challenges in Commercial Aerospace. Springer, pp 267-278 Grall A, Dieulle L, Bérenguer C, Roussignol M (2002) Continuous-time predictive-maintenance scheduling for a deteriorating system. IEEE transactions on reliability 51 (2):141-150 Hafshejani KF, Valmohammadi C, Khakpoor A (2012) Using genetic algorithm approach to solve a multi-product EPQ model with defective items, rework, and constrained space. Jafari L, Makis V (2016) Joint optimization of lot-sizing and maintenance policy for a partially observable two-unit system. The International Journal of Advanced Manufacturing Technology 87 (5-8):1621-1639. doi:10.1007/s00170-016-8556-x Khanna A, Kishore A, Jaggi C (2017) Strategic production modeling for defective items with imperfect inspection process, rework, and sales return under two-level trade credit. International Journal of Industrial Engineering Computations 8 (1):85-118 Kim CHH, Yushin . (1999) An optimal production run length in deteriorating production processes. Lasi H, Fettke P, Kemper H-G, Feld T, Hoffmann M (2014) Industry 4.0. Business & Information Systems Engineering 6 (4):239 Lee J, Kao H-A, Yang S (2014) Service innovation and smart analytics for industry 4.0 and big data environment. Procedia Cirp 16:3-8 Li N, Chan FT, Chung S, Tai AH (2015) An EPQ model for deteriorating production system and items with rework. Mathematical Problems in Engineering 2015 Liao G-L (2016) Production and Maintenance Policies for an EPQ Model With Perfect Repair, Rework, Free-Repair Warranty, and Preventive Maintenance. IEEE Transactions on Systems, Man, and Cybernetics: Systems 46 (8):1129-1139. doi:10.1109/tsmc.2015.2465961 Liao G-L, Chen YH, Sheu S-H (2009) Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research 195 (2):348-357 Liao H, Elsayed EA, Chan L-Y (2006) Maintenance of continuously monitored degrading systems. European Journal of Operational Research 175 (2):821-835 Lu S, Tu Y-C, Lu H (2007) Predictive condition-based maintenance for continuously deteriorating systems. Quality and Reliability Engineering International 23 (1):71-81. doi:10.1002/qre.823 Moussawi-Haidar L, Salameh M, Nasr W (2016) Production lot sizing with quality screening and rework. Applied Mathematical Modelling 40 (4):3242-3256. doi:10.1016/j.apm.2015.09.095 Nobil AH, Taleizadeh AA (2016) A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction. International Journal of Advanced Logistics:1-12 Peng H, van Houtum G-J (2016) Joint optimization of condition-based maintenance and production lot-sizing. European Journal of Operational Research 253 (1):94-107. doi:10.1016/j.ejor.2016.02.027 Rosenblatt MJ, Lee HL (1986) Economic production cycles with imperfect production processes. IIE transactions 18 (1):48-55 Singa WCD-CGH-MW (2004) Effects of Random Defective Rate and Imperfect Rework Process on Economic Production Quantity Model. Taft E (1918) The most economical production lot. Iron Age 101 (18):1410-1412 Tsang AH (1995) Condition-based maintenance: tools and decision making. Journal of Quality in Maintenance Engineering 1 (3):3-17 Tsao Y-C, Chen T-H, Huang S-M (2010) A production policy considering reworking of imperfect items and trade credit. Flexible Services and Manufacturing Journal 23 (1):48-63. doi:10.1007/s10696-010-9070-3 Tsao Y-C, Zhang Q, Chang F-C, Vu-Thuy L (2017) An imperfect production model under Radio Frequency Identification adoption and trade credit. Applied Mathematical Modelling 42:493-508 Uthayakumar R, Tharani S (2017) An economic production model for deteriorating items and time dependent demand with rework and multiple production setups. Journal of Industrial Engineering International:1-14 Wang J, Zhang L, Duan L, Gao RX (2017) A new paradigm of cloud-based predictive maintenance for intelligent manufacturing. Journal of Intelligent Manufacturing 28 (5):1125-1137 Wen D, Ershun P, Ying W, Wenzhu L (2016) An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy. Journal of Intelligent Manufacturing 27 (6):1323-1333 Yedes Y, Chelbi A, Rezg N (2010) Quasi-optimal integrated production, inventory and maintenance policies for a single-vendor single-buyer system with imperfect production process. Journal of Intelligent Manufacturing 23 (4):1245-1256. doi:10.1007/s10845-010-0423-2 Zhao Z, Wang F-l, Jia M-x, Wang S (2010) Predictive maintenance policy based on process data. Chemometrics and Intelligent Laboratory Systems 103 (2):137-143. doi:10.1016/j.chemolab.2010.06.009
|