|
Baur, C. and Wee, D. (2015) Manufacturing’s next act. McKinsey Quarterly, Jun.Avlible:http://www.mckinsey.com/business-functions/operations/our-nsights/manufacturings-next-act. BHARDWAJ, P. (2005) Managing Channel Profits: The Role of Managerial Incentives. Quantitative Marketing and Economics, 247-279. Chu, W. and Desai, P.S. (1995) Channel coordination mechanisms for customer satisfaction. Marketing Science,14, 343-359. Coresystems (2016) The Difference Between Predictive Maintenance and Preventive Maintenance. Avlible: https://www.coresystems.net/blog/the-difference-between- predictive-maintenance-and-preventive-maintenance. Curcurù, G., Galante, G. and Lombardo, A. (2010) A predictive maintenance policy with imperfect monitoring. Reliability Engineering & System Safety,95, 989-997. De Faria, H., Costa, J.G.S. and Olivas, J.L.M. (2015) A review of monitoring methods for predictive maintenance of electric power transformers based on dissolved gas analysis. Renewable and Sustainable Energy Reviews,46, 201-209. Deloux, E., Castanier, B. and B erenguer, C. (2009) Predictive maintenance policy for a gradually deteriorating system subject to stress. Reliability Engineering & System Safety, 418-431. Fiix (2017) What is predictive maintenance? Avlible: https://www.fiixsoftware.com/- maintenance-strategies/predictive- maintenance/. Hamidi, M., Liao, H. and Szidarovszky, F. (2016) Non-cooperative and cooperative game-theoretic models for usage-based lease contracts. European Journal of Operational Research,255, 163-174. IBM (2016) Prevent asset failure, detect quality issues and improve operational processes. Avalible: https://www-01.ibm.com/software/analytics/solutions/opera- tional-analytics/predictive-maintenance/. Jeuland, A.P. and Shugan, S.M. (1983) Managing Channel Profits. Marketing Science,2, 239-272. L.Lee, H. (2004) The Triple-A Supply Chain. Harvard Business Review. Li, L., Liu, M., Shen, W. and Cheng, G. (2016) A Discrete Stress–Strength Interference Theory-Based Dynamic Supplier Selection Model for Maintenance Service Outsourcing. IEEE Transactions on Engineering Management,63, 189-200. Li, S., Huang, H.-Z., Wang, P. and Jin, T. (2016) Design of maintenance outsourcing contracts considering fleet expansion. IEEE, pp. 1-7. Maillart, L.M. and Pollock, S.M. (2002) Cost-optimal condition-monitoring for predictive maintenance of 2-phase systems. IEEE Transactions on Reliability,51, 322-330. Murthy, D.N.P., Karim, M.R. and Ahmadi, A. (2015) Data management in maintenance outsourcing. Reliability Engineering & System Safety,142, 100-110. Park, C., Moon, D., Do, N. and Bae, S.M. (2015) A predictive maintenance approach based on real-time internal parameter monitoring. The International Journal of Advanced Manufacturing Technology,85, 623-632. Pascual, R., Santelices, G., Liao, H. and Maturana, S. (2016) Channel coordination on fixed-term maintenance outsourcing contracts. IIE Transactions,48, 651-660. Pitt, T.J. (1997) Data requirements for the prioritization of predictive building maintenance. Facilities,15, 97-104. Porter, M.E. and Heppelmann, J.E. (2014) How Smart, Connected Products Are Transforming Competition. Harvard Business Review. Sarkar, B. (2016) Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products. Mathematical Problems in Engineering,2016. Shin, J.-H. and Jun, H.-B. (2015) On condition based maintenance policy. Journal of Computational Design and Engineering,2, 119-127. Smith, R. (2015) 4 Reasons Why Predictive Maintenance Does not Work. Available: https://www.linkedin.com/pulse/4-reasons-why-predictive-maintenance-does-work-ricky. Swami, S. and Shah, J. (2012) Channel coordination in green supply chain management. Journal of the Operational Research Society,64, 336-351. Tarakci, H., Tang, K. and Teyarachakul, S. (2009) Learning effects on maintenance outsourcing. European Journal of Operational Research,192, 138-150. Tarakci, H., Tang, K., Moskowitz, H. and Plante, R. (2006) Incentive maintenance outsourcing contracts for channel coordination and improvement. IIE Transactions,38, 671-684. Tarakci, H., Tang, K., Moskowitz, H. and Plante, R. (2006) Maintenance outsourcing of a multi-process manufacturing system with multiple contractors. IIE Transactions,38, 67-78. Tseng, F.-S. and Yeh, Y. (2013) Maintenance outsourcing coordination with risk-averse contractors. Journal of the Operational Research Society,65, 1760-1769. Wen, D., Ershun, P., Ying, W. and Wenzhu, L. (2014) An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy. Journal of Intelligent Manufacturing,27, 1323-1333. Xu, X., Cheng, X. and Sun, Y. (2015) Coordination contracts for outsourcing supply chain with financial constraint. International Journal of Production Economics,162, 134-142. Yuanyuan, L. and Jiang, S. (2015) Research on Equipment Predictive Maintenance Strategy Based on Big Data Technology, in Intelligent Transportation, Big Data and Smart City (ICITBS), 2015 International Conference on, IEEE, pp. 641-644. Zhang, L., Wang, J. and You, J. (2015) Consumer environmental awareness and channel coordination with two substitutable products. European Journal of Operational Research,241, 63-73.
|