|
[1] Barlow, R. E., and L. C. Hunter, “Optimum preventive maintenance policies”, Operations Research, Vol. 8, No.1, pp.90-100, 1960. [2] Chang, W. L., and Lo, H. C., “Joint determination of lease period and preventive maintenance policy for leased equipment with residual value”, Computers & Industrial Engineering, Vol. 61, No.3, pp.489-496, 2011. [3] Chen, M., and Feldman, R. M., “Optimal replacement policies with minimal repair and age-dependent costs”, European Journal of Operational Research, Vol. 98, No.1, pp.75-84, 1997. [4] Cheng, C. Y., Zhao, X. F., Chen, M. C., and Sun, T. H., “A failure-rate-reduction periodic preventive maintenance model with delayed initial time in a finite time period”, Quality Technology and Quantitative Management, Vol. 11, No.3, pp. 245-254, 2014. [5] Chun, Y. H. “Optimal number of periodic preventive maintenance operations under warranty”, Reliability Engineering & System Safety, Vol. 37, No.3, pp.223-225, 1992. [6] Eisingera, S., and Rakowsky, U. K., “Modeling of uncertainties in reliability centered maintenance a probabilistic approach”, Reliability Engineering & System Safety, Vol. 71, No.2, pp.159-164, 2001. [7] Huang, Y. S., Chen, E., and Ho, J. W., “Two-dimensional warranty with reliability-based preventive maintenance”, IEEE Transactions on Reliability, Vol. 62, No.4, pp.898-907, 2013. [8] Jaturonnatee, J., Murthy, D. N. P., and Boondiskulchok, R., “Optimal preventive maintenance of leased equipment with corrective minimal repairs”, European Journal of Operational Research, Vol. 174, No.1, pp.201-215, 2005. [9] Jhang, J. P., “The optimal maintenance policy proportion for the repairable warranty equipment using decreasing-failure-rate-reduction method”, 2010 IEEE 17Th International Conference on Industrial Engineering and Engineering Management, pp.977-980, 2010. [10] Lie, C. H., and Chun, Y. H., “An algorithm for preventive maintenance policy”, IEEE Transaction on Reliability, Vol. 35, No. 1, pp.71-75, 1986. [11] Lu, X., Chen, M., Liu, M., and Zhou, D., “Optimal imperfect periodic preventive maintenance for systems in time-varying environments”, IEEE Transactions on Reliability, Vol. 61, No.2, pp.426-439, 2012. [12] Nakagawa, T. “Imperfect preventive maintenance models”, In Osaki, S. (Ed.) Stochastic Models in Reliability and Maintenance, pp. 125-143, 2002. Springer Berlin Heidelberg. doi: 10.1007/978-3-540-24808-8. [13] Nakagawa, T., and Kowada, M., “Analysis of a system with minimal repair and its application to replacement policy”, European Journal of Operational Research, Vol. 12, No.2, pp.176-182, 1983. [14] Pan, Y., and Thomas, M. U., “Repair and replacement decisions for warranted products under markov deterioration”, IEEE Transactions on Reliability, Vol. 59, No.2, pp.368-373, 2010. [15] Park, D. H., Jung, G. M., and Yum, J. K., “Cost minimization for periodic maintenance policy of a system subject to slow degradation”, Reliability Engineering and System Safety, Vol. 68, No.2, pp.105-112, 2000. [16] Park, K. S., “Optimal number of minimal repairs before replacement”, IEEE Reliability Society, Vol. R-28, No.2, pp.137-140, 1979. [17] Pongpech, J., and Murthy, D. N. P., “Optimal periodic preventive maintenance policy for leased equipment”, Reliability Engineering & System Safety, Vol. 91, No.7, pp.772-777, 2006. [18] Seo, J. H., and Bai, D. S., “An optimal maintenance policy for a system under periodic overhaul”, Mathematical and Computer Modelling, Vol. 39, No. 4-5, pp.373-380, 2004. [19] Shafiee, M., and Finkelstein, M., “An optimal age-based group maintenance policy for multi-unit degrading systems”, Reliability Engineering & System Safety, Vol. 46, No.37, pp. 230-238, 2015. [20] Sheu, S. H., and Griffith, W. S., “Optimal age-replacement policy with age-dependent minimal-repair and random-leadtime”, IEEE Transactions on Reliability, Vol. 50, No.3, pp.302-309, 2001. [21] Wang, H., “A survey of maintenance policies of deteriorating systems”, European Journal of Operational Research, Vol. 139, No.3, pp.469-489, 2002. [22] Yeh, R. H., and Chan, C. K., “Periodical preventive-maintenance contract for a leased facility with weibull life-time”, Quality and Quantity, Vol. 40, No.2, pp.303-313, 2006. [23] Yeh, R. H., and Chang, W. L., “Optimal threshold value of failure-rate for leased products with preventive maintenance actions”, Mathematical and Computer Modelling, Vol. 46, No.5, pp.730-737, 2007. [24] Yeh, R. H., Kao, K. C., and Chang, W. L., “Optimal preventive maintenance policy for leased equipment using failure rate reduction”, Computers & Industrial Engineering, Vol. 57, No.1, pp.304-309, 2009. [25] Zhao, Y. X., “On preventive maintenance policy of a critical reliability level for system subject to degradation”, Reliability Engineering & System Safety, Vol. 79, No.3, pp.301-308, 2003. [26] 葉瑞徽,「產品保證對最佳維修策略之影響」,國科會研究計畫NSC-91-2213-E-011-091, 2002。
|