[1]交通部, 公路養護規範. 2003.
[2]邱建國 and 鄭明淵, 橋梁殘餘壽齡與保全評估決策模式之研發 (2/4). 交通部運輸研究所港灣技術研究中心, 2012.
[3]林正軒, "橋梁生命週期維護策略最佳化模式之研究," 碩士論文, 國立台灣科技大學營建工程系, 2013.[4]徐梓隆, "群橋生命週期維護策略最佳化模式之研究," 碩士論文, 國立台灣科技大學營建工程系, 2014.[5]M.-Y. Cheng and D. Prayogo, "Symbiotic organisms search: a new metaheuristic optimization algorithm," Computers & Structures, vol. 139, pp. 98-112, 2014.
[6]公路養護手冊. 交通部公路總局, 2012.
[7]李有豐, 林安彥, and 土木工程, 橋樑檢測評估與補強. 全華圖書, 2011.
[8]農村再生設施施工規範. 行政院農業委員會水土保持局, 2016.
[9]交通部, "公路鋼結構橋樑之檢測及補強規範, 交通部," 2006.
[10]M.-Y. Cheng and C. Ko, "Computer-aided decision support system for disaster prevention of hillside residents," in Proceedings of the 17th IAARC/CIB/IEEE/IFAC/IFR International Symposium on Automation and Robotics in Construction, Taipei, Taiwan, 2000, pp. 587-592.
[11]K. Fukahori and Y. Kubota, "Consistency evaluation of landscape design by a decision support system," Computer‐Aided Civil and Infrastructure Engineering, vol. 15, no. 5, pp. 342-354, 2000.
[12]S. Sundin and C. Braban‐Ledoux, "Artificial intelligence–based decision support technologies in pavement management," Computer‐Aided Civil and Infrastructure Engineering, vol. 16, no. 2, pp. 143-157, 2001.
[13]M.-Y. Cheng and Y.-W. Wu, "Evolutionary support vector machine inference system for construction management," Automation in Construction, vol. 18, no. 5, pp. 597-604, 2009.
[14]M.-Y. Cheng, P. M. Firdausi, and D. Prayogo, "High-performance concrete compressive strength prediction using Genetic Weighted Pyramid Operation Tree (GWPOT)," Engineering Applications of Artificial Intelligence, vol. 29, pp. 104-113, 2014.
[15]M.-Y. Cheng, D. Prayogo, and Y.-W. Wu, "Novel genetic algorithm-based evolutionary support vector machine for optimizing high-performance concrete mixture," Journal of Computing in Civil Engineering, vol. 28, no. 4, p. 06014003, 2013.
[16]M.-Y. Cheng, D. K. Wibowo, D. Prayogo, and A. F. Roy, "Predicting productivity loss caused by change orders using the evolutionary fuzzy support vector machine inference model," Journal of Civil Engineering and Management, vol. 21, no. 7, pp. 881-892, 2015.
[17]M.-Y. Cheng, N.-D. Hoang, and Y.-W. Wu, "Hybrid intelligence approach based on LS-SVM and Differential Evolution for construction cost index estimation: A Taiwan case study," Automation in Construction, vol. 35, pp. 306-313, 2013.
[18]M.-Y. Cheng and A. F. Roy, "Evolutionary fuzzy decision model for cash flow prediction using time-dependent support vector machines," International Journal of Project Management, vol. 29, no. 1, pp. 56-65, 2011.
[19]M.-Y. Cheng and M.-T. Cao, "Evolutionary multivariate adaptive regression splines for estimating shear strength in reinforced-concrete deep beams," Engineering Applications of Artificial Intelligence, vol. 28, pp. 86-96, 2014.
[20]鄧乃楊, "數據挖掘的新方法─ 支持向量機," 科學出版社, 中國, 2004.
[21]Y. B. Dibike, S. Velickov, D. Solomatine, and M. B. Abbott, "Model induction with support vector machines: introduction and applications," Journal of Computing in Civil Engineering, vol. 15, no. 3, pp. 208-216, 2001.
[22]陳昭宏, "工程保險核保危險評估模式之研究," 1997.
[23]J. rey Horn, N. Nafpliotis, and D. E. Goldberg, "Multiobjective optimization using the niched pareto genetic algorithm," IlliGAL report, no. 93005, pp. 61801-2296, 1993.
[24]吳育偉 and 鄭明淵, "支持向量機最佳化模式-應用於營建管理決策," 第 11 屆營建工程與管理學術研討會, 2007.
[25]T. Joachims, "Text categorization with support vector machines: Learning with many relevant features," Machine learning: ECML-98, pp. 137-142, 1998.
[26]鄭國宏, "都會區鋼結構橋梁生命週期成本評估系統研究," 碩士論文, 國立台灣科技大學營建工程系, 2017.[27]邱建國, "鋼構橋梁生命週期成本分析與應用," 國立台灣科技大學營建工程系, 2017.
[28]溫國樑、簡文郁、張毓文, 最具潛勢及歷史災害地震之強地動模擬. 國家地震工程研究所, 2005.
[29]張容瑋, "自調適橋梁整體耐震能力推論模式在橋梁防災預警之應用," 碩士論文, 國立台灣科技大學營建工程系, 2017.[30]鄭明淵, 歐昱辰, 李維峰, 邱建國, and 廖國偉, 橋梁通阻檢測分析模式建立之研究. 交通部運輸研究所港灣技術研究中心, 2010.
[31]H. Elbehairy, Bridge management system with integrated life cycle cost optimization. 2007.
[32]B. Gutenberg and C. F. Richter, "Frequency of earthquakes in California," Bulletin of the Seismological Society of America, vol. 34, no. 4, pp. 185-188, 1944.
[33]S. Das, V. Gupta, and V. Srimahavishnu, "Damage‐based design with no repairs for multiple events and its sensitivity to seismicity model," Earthquake engineering & structural dynamics, vol. 36, no. 3, pp. 307-325, 2007.
[34]國家地震工程研究中心, 最具潛勢及歷史災害地震之強地動模擬. 國家地震工程研究中心, 2005.
[35]Y.-J. Park and A. H.-S. Ang, "Mechanistic seismic damage model for reinforced concrete," Journal of structural engineering, vol. 111, no. 4, pp. 722-739, 1985.
[36]吳育偉, "物件導向演化式支持向量機推論模式於營建管理決策之研究," 2008.
[37]J.-S. Chou, "Cost simulation in an item-based project involving construction engineering and management," International Journal of Project Management, vol. 29, no. 6, pp. 706-717, 2011.
[38]T. C. McCormack and F. N. Rad, "An earthquake loss estimation methodology for buildings based on ATC-13 and ATC-21," Earthquake Spectra, vol. 13, no. 4, pp. 605-621, 1997.
[39]C. A. Kircher, R. V. Whitman, and W. T. Holmes, "HAZUS earthquake loss estimation methods," Natural Hazards Review, vol. 7, no. 2, pp. 45-59, 2006.