1.何正斌、吳水丕,現代工作研究,日之昇文化事業有限公司,台中(2003)。
2.林秀蓉,自動化生產系統標準工時量測與分析-以COG製程為例,國立屏東科技大學工業管理系碩士論文,(2010)。3.黃邦賢,多站連續生產型態之標準工時量測-以SMT製程為例,國立屏東科技大學工業管理系碩士論文,(2008)。4.鄭伊均,人力組裝線標準工時量測暨生產線平衡研究,國立屏東科技大學工業管理系碩士論文,(2019)。5.鄭榮郎,工作研究,全華圖書,(2020)。
6.鍾智超,電腦散熱風扇製程組裝線標準工時預測模式建立與驗證,國立屏東科技大學工業管理系碩士論文,(2009)。7.蔡佩妤,作業員安置及工位設計對組裝線產能影響暨標準工時建立之研究-以樂高組裝為例,國立屏東科技大學工業管理系碩士論文,(2013)。8.張博盛,以標準工時為基礎之流線式排程資訊系統,國立屏東科技大學工業管理系碩士論文,(2015)。9.Benjamin W. Niebel and Andris Freivalds, Methods, Standards and Work Design 10th ed, McGraw Hill Company, (2005).
10.Chang Seong Ko, Myung Soo Cha and Jae Jeung Rho, “A case study for determining standard time in a multi-pattern and short life-cycle production system,” Computers & Industrial Engineering, 53, 321-325 (2007).
11.Daniel Alejandro, Rossitab Fernando, Tohmébc, Mariano Frutosad, “A data-driven scheduling approach to smart manufacturing,” Journal of Industrial Information Integration, 15, 69-79 (2019).
12.George Michalos, Sotiris Makris, Loukas Rentzos, George Chryssolouris, “Dynamic job rotation for workload balancing in human based assembly systems,” CIRP Journal of Manufacturing Science and Technology, 2, 153-160 (2010).
13.Metin Dagdeviren, Ergun Eraslan and Fatih V. celebi, “An alternative work measurement method and its application to a manufacturing industry,” Journal of Loss Prevention in the Process Industries, 24, 563-567(2011).
14.Nurhayati M.N., Siti Zawiah M.D., Mahidzal D., “The relationship between work productivity and acute responses at different levels of production standard times,” International Journal of Industrial Ergonomics, 56, 59-68 (2016).
15.Parviz Fattahi, Alireza Fallahi, “Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability,” CIRP Journal of Manufacturing Science and Technology, 2, 114-123 (2010).
16.Raghunath G. Kulkarnia, Vinayak N. Kulkarnib, V. N. Gaitondec, “Productivity improvement in assembly workstation of motor winding unit,” materialstoday: proceesings, 5, 23518-23525 (2018).
17.Stefan Kröning, Berend Denkena, “Dynamic scheduling of maintenance measures in complex production systems,” CIRP Journal of Manufacturing Science and Technology, 6, 292-300 (2013).