|
1. Aboelmagd, Yasser M R. 2018. ‘Decision Support System for Selecting Optimal Construction Bid Price’. doi:10.1016/j.aej.2018.11.007. 2. Anbari, Frank T. 2003. ‘Earned Value Project Management Method and Extensions’. https://doi.org/10.1177/875697280303400403 34(4): 12–23. doi:10.1177/875697280303400403. 3. Archibald, Russell D, and Richard L Villoria. 1967. ‘Network-Based Management Systems (PERT/CPM)’. 4. Atkinson, R. 1999. ‘Project Management: Cost, Time and Quality, Two Best Guesses and a Phenomenon, Its Time to Accept Other Success Criteria’. International Journal of Project Management 17(6): 337–42. doi:10.1016/S0263-7863(98)00069-6. 5. Azimi, R., Sanghyun Lee, Simaan M. Abourizk, and Amin Alvanchi. 2011. ‘A Framework for an Automated and Integrated Project Monitoring and Control System for Steel Fabrication Projects’. Automation in Construction 20(1): 88–97. doi:10.1016/J.AUTCON.2010.07.001. 6. Babu, A. J.G., and Nalina Suresh. 1996. ‘Project Management with Time, Cost, and Quality Considerations’. European Journal of Operational Research 88(2): 320–27. doi:10.1016/0377-2217(94)00202-9. 7.Barraza, Gabriel A., and Rafael A. Bueno. 2007. ‘Probabilistic Control of Project Performance Using Control Limit Curves’. Journal of Construction Engineering and Management 133(12): 957–65. doi:10.1061/(ASCE)0733-9364(2007)133:12(957). 8. Basu, Ron. 2014. ‘Managing Quality in Projects: An Empirical Study’. International Journal of Project Management 32(1): 178–87. doi:10.1016/J.IJPROMAN.2013.02.003. 9. Blyth, Karl, and Ammar Kaka. 2006. ‘A Novel Multiple Linear Regression Model for Forecasting S-Curves’. Engineering, Construction and Architectural Management 13(1): 82–95. doi:10.1108/09699980610646511/FULL/XML. 10. Carroll, Archie B. 1999. ‘Corporate Social Responsibility: Evolution of a Definitional Construct’. Business & Society 38(3): 268–95. doi:10.1177/000765039903800303. 11. Chen, Hong Long. 2014. ‘Improving Forecasting Accuracy of Project Earned Value Metrics: Linear Modeling Approach’. Journal of Management in Engineering 30(2): 135–45. doi:10.1061/(ASCE)ME.1943-5479.0000187. 12. Cioffi, D. F. 2006. ‘Completing Projects According to Plans: An Earned-Value Improvement Index’. Journal of the Operational Research Society 57(3): 290–95. doi:10.1057/PALGRAVE.JORS.2602007. 13. Cleland, David I, and William Richard King. 1988. ‘Project Management Handbook’. (No Title). 14. Colin, Jeroen, and Mario Vanhoucke. 2015. ‘A Comparison of the Performance of Various Project Control Methods Using Earned Value Management Systems’. Expert Systems with Applications 42(6): 3159–75. doi:10.1016/J.ESWA.2014.12.007. 15. Collins, Wesley, Kristen Parrish, and George Gibson Jr. 2017. ‘Defining and Understanding “Small Projects” in the Industrial Construction Sector’. Creative Construction Conference 2017, CCC 2017 196: 315–22. doi:10.1016/j.proeng.2017.07.205. 16. Fleming, Quentin W., and Joel M. Koppelman. 2010. ‘Earned Value Project Management’. https://books.google.com/books/about/Earned_Value_Project_Management.html?id=Z MRVngEACAAJ (May 20, 2024). 17. Gardiner, Paul D., and Kenneth Stewart. 2000. ‘Revisiting the Golden Triangle of Cost, Time and Quality: The Role of NPV in Project Control, Success and Failure’. International Journal of Project Management 18(4): 251–56. doi:10.1016/S0263-7863(99)00022-8. 18. Gardoni, Paolo, Kenneth F. Reinschmidt, and Ramesh Kumar. 2007. ‘A Probabilistic Framework for Bayesian Adaptive Forecasting of Project Progress’. Computer-Aided Civil and Infrastructure Engineering 22(3): 182–96. doi:10.1111/J.1467- 8667.2007.00478.X. 19. Haddadi, Amin, Agnar Johansen, and Svein Bjørberg. 2017. ‘Best Value Approach (BVA): Enhancing Value Creation in Construction Projects’. Business Systems Research Journal 8. doi:10.1515/bsrj-2017-0018. 20. Hummel, Jeffrey Rogers. 1990. ‘National Goods versus Public Goods: Defense, Disarmament, and Free Riders’. The Review of Austrian Economics 4(1): 88–122. doi:10.1007/BF02426365. 21. Husin, Albert. 2019. ‘PERFORMANCE IMPROVEMENT OF DIAPHRAGM WALL AT HIGH RISE BUILDING BY VALUE ENGINEERING UTILIZATION’. 22. Hwang, Bon-Gang, Xianbo Zhao, and Li Toh. 2013. ‘Risk Management in Small Construction Projects in Singapore: Status, Barriers and Impact’. International Journal of Project Management 32: 116–24. doi:10.1016/j.ijproman.2013.01.007. 23. Kalman, R. E. 1960. ‘A New Approach to Linear Filtering and Prediction Problems’. Journal of Basic Engineering 82(1): 35–45. doi:10.1115/1.3662552. 24. Kaplan, Robert S, and David P Norton. 1992. ‘The Balanced Scorecard: Measures That Drive Performance’. 25. Kenley, Russell, and Owen D. Wilson. 1986. ‘A Construction Project Cash Flow Model—an Idiographic Approach’. Construction Management and Economics 4(3): 213–32. doi:10.1080/01446198600000017. 26. Kerzner, Harold. 2016. Project Management: A Systems Approach to Planning, Scheduling, and Controlling, WPLS Student Package. John Wiley & Sons. 27. Khang, Do Ba, and Yin Mon Myint. 1999. ‘Time, Cost and Quality Trade-off in Project Management: A Case Study’. International Journal of Project Management 17(4): 249– 56. doi:10.1016/S0263-7863(98)00043-X. 28. Kim, Jong Yul, Chang Wook Kang, and In Keuk Hwang. 2012. ‘A Practical Approach to Project Scheduling: Considering the Potential Quality Loss Cost in the Time–Cost Tradeoff Problem’. International Journal of Project Management 30(2): 264–72. doi:10.1016/J.IJPROMAN.2011.05.004. 29. Klise, Geoffrey Taylor, Peter Holmes Kobos, Roger Ray Hill, Colin Joseph Hamman, Vipin P Gupta, Benjamin Bing-Yeh Yang, and Nadav Enbar. 2014. PV Reliability Operations and Maintenance (PVROM) Database Initiative: 2014 Project Report. United States. doi:10.2172/1504104. 30. LII. An Essay towards Solving a Problem in the Doctrine of Chances. By the Late Rev. Mr. Bayes, F. R. S. Communicated by Mr. Price, in a Letter to John Canton, A. M. F. R. S’. 1763. Philosophical Transactions of the Royal Society of London 53: 370–418. doi:10.1098/RSTL.1763.0053. 31. Lipke, Walt. 2003. ‘Schedule Is Different’. The Measurable News Summer: 31–34. 32. Mani, Golparvar-Fard, Peña-Mora Feniosky, Arboleda Carlos A, and Lee SangHyun. 2009. ‘Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs’. Journal of Computing in Civil Engineering 23(6): 391– 404. doi:10.1061/(ASCE)0887-3801(2009)23:6(391). 33. ‘MetropolisUlam_TheMonteCarloMethod’. 34. Mintzberg, Henry. 1987. ‘The Strategy Concept I: Five Ps For Strategy’. California Management Review 30(1): 11–24.doi:10.2307/41165263/ASSET/41165263.FP.PNG_V03. 35. Mok, Ka Yan, Geoffrey Qiping Shen, and Jing Yang. 2015. ‘Stakeholder Management Studies in Mega Construction Projects: A Review and Future Directions’. International Journal of Project Management 33(2): 446–57. doi:10.1016/J.IJPROMAN.2014.08.007. 36. Moslemi Naeni, Leila, and Amir Salehipour. 2011. ‘Evaluating Fuzzy Earned Value Indices and Estimates by Applying Alpha Cuts’. Expert Systems with Applications 38(7): 8193– 98. doi:10.1016/J.ESWA.2010.12.165. 37. Nizam, Anisulrahman, and Ahmad Elshannaway. 12 The Journal of Management and Engineering Integration Review of Earned Value Management (EVM) Methodology, Its Limitations, and Applicable Extensions. 38. Nor, Ahmad Kamal M., Srinivasa R. Pedapati, and Masdi Muhammad. 2021. ‘Reliability Engineering Applications in Electronic, Software, Nuclear and Aerospace Industries: A 20 Year Review (2000–2020)’. Ain Shams Engineering Journal 12(3): 3009–19. doi:10.1016/J.ASEJ.2021.02.015. 39. Olawumi, Timothy, Ebunoluwa Akinrata, and Bamidele Arijeloye. 2016. ‘Value Management – Creating Functional Value For Construction Project: An Exploratory Study’. 54: 40–59. doi:10.6084/m9.figshare.19758769. 40. Oppong, Goodenough D., Albert P.C. Chan, and Ayirebi Dansoh. 2017. ‘A Review of Stakeholder Management Performance Attributes in Construction Projects’. International Journal of Project Management 35(6): 1037–51. doi:10.1016/J.IJPROMAN.2017.04.015. 41. Pajares, Javier, and Adolfo López-Paredes. 2011. ‘An Extension of the EVM Analysis for Project Monitoring: The Cost Control Index and the Schedule Control Index’. International Journal of Project Management 29(5): 615–21. doi:10.1016/J.IJPROMAN.2010.04.005. 42. Safa, Mahdi, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, G. E. Gibson, D. Rayside, and C. Haas. 2015. ‘Classification of Construction Projects’. https://uwspace.uwaterloo.ca/handle/10012/11560 (May 22, 2024). 43. Senouci, Ahmed, Ricardo M Leon, and Neil Eldin. 2019. ‘Schedule Performance Index Effectiveness in Assessing Project Schedule Performance’. International Journal of Construction Engineering and Management 8(2): 46–55. doi:10.5923/j.ijcem.20190802.02. 44. Shewhart, W. A. 1930. ‘Economic Quality Control of Manufactured Product1’. Bell System Technical Journal 9(2): 364–89. doi:10.1002/J.1538-7305.1930.TB00373.X. 45. Turing, A M. 1950. ‘Computing Machinery and Intelligence’. Source: Mind, New Series 59(236): 433–60. http://www.jstor.orgStableURL:http://www.jstor.org/stable/2251299Accessed:25/08/200 818:56 (May 21, 2024). 46. Turkan, Yelda, Frédéric Bosché, Carl T. Haas, and Ralph Haas. 2013. ‘Toward Automated Earned Value Tracking Using 3D Imaging Tools’. Journal of Construction Engineering and Management 139(4): 423–33. doi:10.1061/(asce)co.1943-7862.0000629. 47. Usman, Fathoni, Sumi Amariena Hamim, and Nur Jalaluddin. 2018. ‘Value Engineering in Building Information Modelling for Cost Optimization of Renovation Works: A Case Study’. 7: 431–35. doi:10.14419/ijet.v7i4.35.22856. 48. Vandevoorde, Stephan, and Mario Vanhoucke. 2006. ‘A Comparison of Different Project Duration Forecasting Methods Using Earned Value Metrics’. International Journal of Project Management 24(4): 289–302. doi:10.1016/J.IJPROMAN.2005.10.004. 49. Vanhoucke, Mario. 2010. ‘Using Activity Sensitivity and Network Topology Information to Monitor Project Time Performance’. Omega 38(5): 359–70. doi:10.1016/J.OMEGA.2009.10.001. 50. Vanhoucke, Mario. 2011. ‘On the Dynamic Use of Project Performance and Schedule Risk Information during Projecttracking’. Omega 39(4): 416–26. doi:10.1016/J.OMEGA.2010.09.006. 51. Wang, Aaron J. 2016. ‘Evolution of Modern Mega-Buildings in China: Innovations and Sustainability’. Proceedings of the Institution of Civil Engineers: Civil Engineering 169(3): 121–28. doi:10.1680/JCIEN.15.00063. 52. Wen, Shiping, Handong Tang, Fei Ying, and Guangdong Wu. 2023. ‘Exploring the Global Research Trends of Supply Chain Management of Construction Projects Based on a Bibliometric Analysis: Current Status and Future Prospects’. Buildings 2023, Vol. 13, Page 373 13(2): 373. doi:10.3390/BUILDINGS13020373. 53. Willems, Laura L., and Mario Vanhoucke. 2015. ‘Classification of Articles and Journals on Project Control and Earned Value Management’. International Journal of Project Management 33(7): 1610–34. doi:10.1016/j.ijproman.2015.06.003. 54. Zheng, Xian, Yun Le, Albert P.C. Chan, Yi Hu, and Yongkui Li. 2016. ‘Review of the Application of Social Network Analysis (SNA) in Construction Project Management Research’. International Journal of Project Management 34(7): 1214–25. doi:10.1016/J.IJPROMAN.2016.06.005
|