|
Although the technique of GPS static survey has been widely used in control survey, long observation time and the following post-processing work are still needed. The combination of OTF (On-the-Fly) phase ambiguity resolution method and GPS RTK (Real Time Kinematic) surveying design enables the solution of phase ambiguities in a moving situation. Such a RTK system needs only few observation data to perform positioning, so it is able to shorten the time needed for GPS survey. With the increasing number of GPS satellites and the OTF phase ambiguity resolution method , it has lead to the practical stage of RTK. This study discusses the application of RTK system on control survey and cadastral survey , with emphasis on the accuracy issue , performance efficiency , as well as how to increase reliability. The precision of RTK has been proved to approach 15 mm+3 ppm that meets the requirements of 3rd and 4th order control survey. In the application of cadastral survey , centimeter level accuracy for cadastral coordinates can be reached through proper datum transformation. From the viewpoint of practical application, this study considers the distance limit for RTK technique, and examines the scheme to increase reliability , in order to confirm the survey accuracy.
|