[1]Büyüközkan, G., Ertay, T., Kahraman, C., and Ruan, D. (2004), Determing the importance weights for the design requirements in the house of quality using the fuzzy analytic network approach, International Journal of Intelligent Systems, 19, 443-461.
[2]Büyüközkan, G., and Feyzioglu, O.(2005), Group decision making to better respond customer needs in software development, Computer & Industrial Engineering, 48, 427-441.
[3]Chan, L.K., Kao, H.P., Ng, A., and Wu, M.L.(1999), Rating the importance of customer needs in quality function deployment by fuzzy and entropy methods, International Journal of Production Research, 37(11), 2499-2518.
[4]Csutora, R., and Buckley, J.J.(2001), Fuzzy hierarchical analysis: the Lambda-Max method, Fuzzy Sets and Systems, 120(2), 181-203.
[5]Chen, L.H., and Lu, H.W.(2001), An approximate approach for ranking fuzzy numbers based on left and right dominance, Computers and Mathematics with Application, 41,1589-1602.
[6]Deng, Y., Zhenfu, Z., and Qi, L.(2006), Ranking fuzzy numbers with an area method using radius of gyration, Computers and Mathematics with Applications, 51, 1127-1136.
[7]Erol, I., William, G., and Ferrell, Jr.(2003), A methodology for selection problems with multiple conflicting objectives and both quality and quantitative criteria, International Journal of Production Economics, 86, 187-199.
[8]Iranmanesh,S.H. and Mohamad, H.S.(2003), An investigation of rank reserval when using fuzzy importance levels in QFD analysis, International Journal of Reliability, Quality and Safety Engineering, 10(2), 185-203.
[9]Kahraman, C., Ertay, T., and Büyüközkan, G. (2006), A fuzzy optimization model for QFD planning process using analytic network approach, European Journal of Operational Research, 171, 390-411.
[10]Karsak, E.E., Sozer, S., and Alptekin, S.E.(2002), Product planning in quality function deployment using a combined analytic network process and goal programming approach, Computers & Industrial Engineering, 44, 171-190.
[11]Khoo, L.P., and Ho, N.C.(1996), Framework of a fuzzy quality function deployment system, International Journal of Production Research, 34(2), 299-311.
[12]Kwong, C.K., and Bai, H.(2003), Determining the importance weights for the customer requirements in QFD using a fuzzy AHP with an extent analysis approach, IIE Transactions, 35, 619-626.
[13]Lin, C.T.(2003), A fuzzy logic-based approach for implementing quality function deployment, Smart Engineering System Design, 5, 55-62.
[14]Lockamy, A., and Khurana, A.(1995), Quality function deployment: Total Quality Management for new product design, International Journal of Quality Reliability Management, 12, 73-84.
[15]Partovi, F.Y.(2001), An analytic model to quantify strategic service vision, International Journal of Service Industry Management, 12(5), 476-499.
[16]Partovi, F.Y., and Corredoira, R.A.(2002), Quality function deployment for the good of soccer, European Journal of Operational Research, 137, 642-656.
[17]Rommelfanger, H.(1989), Interactive decision making in fuzzy linear optimization problems, European Journal of Operational Research, 41,210-217.
[18]Saaty, T.L.(1980), The analytic hierarchy process, New York:McGraw-Hill.
[19]Saaty, T.L.(1996), Decision making with dependence and feedback:The analytic network process, Pittsburgh:RWS.
Shen, X.X., Tan, K.C., and Xie, M.(2001), The implementation of quality function deployment based on linguistic data, Journal of Intelligent Manufactured, 12, 65-75.
[20]Shen, X.X., Min, X., and Tan, K.C.(2001), Listening to the future voice of the customer using fuzzy trend analysis in quality function deployment, Quality Engineering, 13(3), 419-425.
[21]Sohn, Y.S., and Choi, I.S.(2001), fuzzy QFD for supply chain management with reliability, Reliability Engineering and System Safety, 72, 327-334.
Sullivan, L.P.(1986), Quality function deployment, Quality Progress, 19, 39-50.
[22]Tsai, C.Y.(2003), Using fuzzy QFD to enhance manufacturing strategic planning, Journal of the Chinese Institute of Industrial Engineers, 18(3), 33-41.
[23]Vanedas, L.V., and Labib, A.W.(2001), A fuzzy quality function deployment model for deriving optimum targets, International Journal of Production Research, 39(1), 99-120.
[24]Wang, J.(1999), Fuzzy outranking approach to prioritize design requirements in quality function deployment, International Journal of Production Research, 37(11), 899-916.
[25]Wasserman, Gary, S.(1993), On how prioritize design requirements during the QFD planning process, IIE Transactions, 25, 59-65.
[26]Yang, Y.Q., Wang, S.Q., Dulaimi, M., and Low, S.P.(2003), A fuzzy quality function deployment system for buildable design decision-makings, Automation in Construction, 12, 381-393.
[27]Zadeh, L.A.(1965), Information and Control, Fuzzy Set, 8, 338-353.
[28]朱艷芳、黃家哲與余光麒(1999),模糊品質機能展開演算模式之研究,國防管理學院學報,20(1),P.50-62。
[29]林燈男(1995),數量方法在品質表應用之研究,國立交通大學工業工程研究所未出版碩士論文。[30]林亦盈(1997),柔性解算應用於品質機能展開之研究,元智大學工業工程研究所未出版碩士論文。[31]林鴻昇(2004),建立行銷、研發與製造屬性之整合性架構-以筆記型電腦為例,元智大學工業工程研究所未出版碩士論文。[32]白昌霖(2003),顧客滿意導向的供應商評選模式,中原大學工業工程研究所未出版碩士論文。[33]李振登(2004),新產品開發(初版),台北:偉明圖書有限公司。
[34]周文賢、林嘉力(2001),新產品開發與管理(初版),台北:華泰書局。
[45]許志宇、黃士滔(2004),綠色品質機能展開與模糊理論之應用—以即可拍相機為例,中華民國品質學會第40屆年會 高雄市分會第30屆年會暨第10屆全國品質管理研討會論文集,P.78-89。
[36]許志宇、黃士滔(2005),品質機能展開、模糊理論與灰關聯分析於綠色設計之應用,工程科技與教育學刊,2(2),P.239-265。[37]張聖麟(1996),卓越化生產管理(初版),台北:華泰書局。
[38]張保隆、陳文賢、蔣明晃、姜齊、盧昆宏、王瑞深(1997),生產管哩,台北:華泰文化事業股份有限公司。
[39]葉峰廷(2004),品質機能展開之產品規劃模糊目標規劃模式,國立成功大學工業與資訊管理學系碩士班未出版碩士論文。[40]傅和彥譯(1999),生產管理,台北:前程企業管理有限公司。
[41]楊長林(2001),新產品開發:設計與定位、流程、績效評估之整合性管理研究,國立台灣科技大學工業管理所未出版博士論文。[42]楊長林、方孝華(1999),模糊環境下之品質機能展開—以筆記型電腦為例,中國工業工程學會八十八年度年會論文集,國立清華大學,新竹,1999年。
[43]劉書韜(2004),國軍基層軍官最適職類遴派評估之研究─以空軍地勤軍官為例,私立義守大學研究所碩士論文。[44]魯程平(2006),應用模糊品質機能展開與模糊多屬性決策於產品遴選模式之研究,私立義守大學研究所碩士論文。[45]鄭書季(2005),多目標模糊偏好規劃法求解AHP及ANP優先權重,國立暨南國際大學研究所碩士論文。[46]賴士葆(2004),生產與作業管理:理論與實務,台北:華泰書局。
[47]魏巧晴(2002),產品設計初期模糊決策之研究,大葉大學工業工程系碩士班未出版碩士論文。