林秋萍,2009,不同啟發式演算法應用於考量整備時間之單機排程問題之比較,國立成功大學工業與資訊管理所碩士論文Bagchi. U., Y. Chang and R. Sullivan, (1987) Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date, Naval Res. Logist. Quart. 34 pp.739-751.
Biskup, D.(1999) Single-machine scheduling with learning considerations, European Journal of Operational Research, Vol 115, pp.173-178.
Brooks, G.H. and White, C.R. (1965), An Algorithm for Finding Optimal or Near Optimal Solutions to the Production Scheduling Problem. Journal of Industrial Engineering, Vol. 16, No.1, pp.34-40.
Chen, Z. L. and Lee, C. Y. (2002) Parallel machine scheduling with a common due window. European Journal of Operational Research, Vol. 136, pp. 512-527.
Chris N. Potts, Mikhail Y. Kovalyov. (2000) Scheduling with batching: A review, European Journal of Operational Research.
Feng Jin, Shiji Song, Cheng Wu.(2009) A simulated annealing algorithm for single machine scheduling problems with family setups.Computers & Operations Research, Vol.36 pp.2133-2138
Graham, R. L., E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan. (1979) Optimization and approximation in deterministic sequencing and scheduling: A survey, Annals of Discrete Mathematic, Vol 5 pp.287-326.
Gen, M., R. Cheng.(1997)Genetic Algorithm and Engineering Design, John Wiley & Sons, Inc.
J. Heizer, B. Render, (2001) Operations Management, sixth ed., Prentice-Hall.
Kenneth R. Baker and Gary D. Scudder (1990) Sequencing with Earliness and Tardiness Penalties : A Review. Operations Research, Vol.38, No.1, pp22-36.
Liao, Ching-Jong, and Li-Man Liao. (1997) Single Facility Scheduling with Major and Minor Setups. Computers & Operations Research Vol 24, No.2, pp.169-178.
Lawler, E.L., (1977) A Pseudo-Polynomial Algorithm For Sequencing Jobs To Minimize Total Tardiness., Annals Of Discrete Mathematics, 1, pp.331-342.
Ling Huey Su and Yi-Yu Tien, (2011) Minimizing mean absolute deviation of completion time about a common due window subject to maximum tardiness for a single machine. Int. J. Production Economics, Vol.134, pp196-203.
Mosheiov, G. (2001) Scheduling problems with a learning effect, European Journal of Operational Research, Vol 132, pp.687-693.
Pinedo, M. (1995) Scheduling, Prentice Hall.
Sabuncuoglu, I. and Lejmi, T. (1999) Scheduling for non regular performance measure under the due window approach. Omega, The International Journal of Management Science, Vol. 27, pp.555-568.
Tan K.C., R Narasimhan, P.A. Rubin, G.L. Ragatz, (2000) A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times, Omega, The International Journal of Management Science Vol 28 pp.313-326.
Wen-Chiung Lee and Chin-Chia Wu and Peng Hsiang Hsu, (2010) A single machine learning effect scheduling problem with release times. Omega, The International Journal of Management Science, Vol 38 pp.3-11.
Wright, T.P. (1936) Factors affecting the cost of airplanes. Journal of Aeronautical Science, Vol 3, pp.122-128.
Yano,C.A., and Kim, Y.D., (1991) Algorithms for a class of single machine weighted tardiness and earliness problems, European Journal of Operational Research Vol 52 pp.167-178.