|
[Mar98]D. P. Martin, “The Advantage of Using Short Cycle Time Manufacturing (SMC) Instead of Continuous Flow Manufacturing (CFM),” Proceeding of ASMC 1998, pp.89-94. [RoC02]J. Robinson and F. Chance, “Dynamic X-Factor application for Optimizing Lot Control for Agile Manufacturing,” Proceeding of ISSM 2002. [DSH03]D. Delp, J. Si, Y. Hwang and B. Pei, “A Dynamic System Regulation Measure for Increasing Effective Capacity: the X-Factor Theory,” Proceeding of IEEE Advanced Manufacturing Conference 2003, pp.81-88. [GrH98]D. Gross and C. M. Harris, Fundamentals of Queueing Theory 3rd edition, Wiley press 1998. [Ros02]S. M. Ross, Introduction to Probability Models, Academic press 2002. [Vir01]J. Virtamo, ”38.143 Queueing Theory / Priority Queues,” Helsinki University of Technology, Fall 2001. ( http://www.netlab.tkk.fi/opetus/s383143/kalvot/E_priority.pdf )
[Bos02]S. K. Bose, ”Priority Operation of M/G/1 Queue, “Department of Electrical Engineering, I.I.T. 2002. ( http://home.iitk.ac.in/~skb/qbook/Slide_Set_9.PDF )
[Cha99]S. C. Chang, “Demand-Driven, Iterative Capacity Allocation and Cycle Time Estimation for Re-entrant Line, “Proceeding of Conference on Decision and Control IEEE 1999, pp.2270-2275. [NaK97]Y. Narahari and L. M. Khan, “Modeling the Effect of Hot Lots in Semiconductor Manufacturing Systems, “IEEE Transactions on Semiconductor Manufacturing, vol. 10, no.1, February 1997, p.p.185-188. [JLG99]S. Jain, C. C. Lim, B. P. Gan and Y. H. Low, “Criticality of Detailed Modeling in Semiconductor Supply Chain Simulation” Proceedings of the 1999 Winter Simulation Conference, pp. 888-896. [OWY99]K. Ozawa, H. Wada and T. Yamaguchi, “Optimal Tool Planning Using the X-Factor Theory,” Proceeding of IEEE Semiconductor Manufacturing Conference 1999, pp. 49-52.
[LKW06]Amy H.I. Lee, He Yau Kang and Wen Pai Wang, “Analysis of Priority Mix Planning for the Fabrication of Semiconductors under Uncertainty,” Int. J. Adv. Manufacturing Technology 2006, pp. 351–361. [HuS00]M.D. Hu and S.C. Chang, “Translating Overall Production Goals into Distributed Flow Control Parameters for Semiconductor Manufacturing,” Journal of Manufacturing Systems, vol. 22, no. 1, Aug. 2003, pp. 46-63 [Chi06]China Economics: (http://big5.ce.cn/cysc/ceit/zggng/200510/28/t20051028_5043441.shtml), 2006. [HoS00]Wallace J. Hopp and Mark L. Spearman, Factory Physics 2nd,Mc Graw Hill press 2000. [AdR01]I. Adan and J. Resing, Queueing Theory, P.O. Box 513, 5600 MB Eindhoven, the Netherlands, February 14, 2001. ( http://mia.ece.uic.edu/~papers/WWW/Flexi-Tunes/tarballs/queue.pdf )
[CFY96]D. P.Connors, G. E. Feigin and D. D. Yao, “A Queueing Network Model for Semiconductor Manufacturing,” IEEE transactions on semiconductor manufacturing Vol. 9 no.3, 1996, p.p.412-427. [KOW01]M. Kishimoto, K. Ozawa, K. Watanabe, and D. Martin, “Optimized Operations by Extended X-Factor Theory Including Unit Hours Concept,” IEEE Transactions on Semiconductor Manufacturing, Vol. 14, no. 3, Auguest 2001.
|