|
Akçali, E., Nemoto, K., and Uzsoy, R. M., 2001, “Cycle-time improvements for photolithography process in semiconductor manufacturing,” IEEE Transactions on Semiconductor Manufacturing, vol. 14, no. 1, pp. 48–56. Anderson, D. L., Britt, F. E., and Favre, D. J., 1997, “The seven principles of supply chain management,“ Supply Chain Management Review, vol. 1, no. 1, pp. 31–43. Atherton, R.W. and Dayhoff, J. E., 1986, “Signature analysis: simulation of inventory, cycle time, and throughput trade-offs in wafer fabrication,” IEEE Transactions on Components, Hybrids, and Manufacturing Technology, vol. 9, no. 4, pp. 498–907. Backus, P., Janakiram, M., Mowzoon, S., Runger, G. C., and Bhargava, A., 2006, “Factory cycle-time prediction with a data-mining approach,” IEEE Transactions on Semiconductor Manufacturing, vol. 19, no. 2, pp. 252–258. Baek, D.H., Yoon, W. C., and Park, S. C., 1998, “A spatial rule adaptation procedure for reliable production control in a wafer fabrication system,” International Journal of Production Research, vol. 36, no. 6, pp. 1475–1491. Blum, A. and Langley, P., 1997, “Selection of relevant features and examples in machine learning,” Artificial Intelligence, vol. 97, no. 1–2, pp. 245–271. Boxma, O. J., Cohen, J. W., and Huffels, N., 1979, “Approximations of the Mean Waiting Time in an M/G/s Queueing System,” Operations Research, vol. 27, no. 6, pp. 1115–1127. Breiman, L., Friedman, J. H., Olshen, R. A., and Stone. C. J., 1984, Classification and Regression Trees, Wadsworth, Belmont, CA. Briceno, J. F., El-Mounayri, H, and Mukhopadhyay, S., 2002, “Selecting an artificial neural network for efficient modeling and accurate simulation of the milling process,” International Journal of Machine Tools & Manufacture, vol. 42, no. 6, pp. 663–674. Byvatov, B., Fechner, U., Sadowski, J., and Schneider, G., 2003, “Comparison of Support Vector Machine and Artificial Neural Network Systems for Drug/Nondrug Classification,” Journal of Chemical Information and Computer Sciences. Vol. 43, no. 6, pp. 1882–1889. Chambers, M. and Mount-Campbell, C. A., 2002, “Process optimization via neural network metamodeling,” International Journal of Production Economics, vol. 79, no. 2, pp. 93–100. Chang, P., Wang, Y., and Ting, C., 2008, “A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory,” International Journal of Production Research, vol. 46, no. 4. pp. 1017–1029. Chang, S. -C., Liao, B. -J., Kao, Y. -T, and Chen, A., 2009, “Priority Cycle Time Behavior Modeling for Semiconductor Fabs,” in Proceedings of the 2009 First International Conference on Advances in System Simulation, pp. 38–43. Chen, H., Harrison, J. M., Mandelbaum, A., Ackere, A. V., and Wein, L. M., 1988, “Empirical evaluation of a queueing network model for semiconductor wafer fabrication,” Operations Research, vol. 36, no. 2, pp. 202–215. Chen, J. C., Chen, C. W., Tai, C. Y., and Tyan, J. C., 2004, “Dynamic state-dependent dispatching for wafer fabrication,” International Journal of Production Research, vol. 42, no. 21. pp. 4547–4562. Chen W. and Shih, J, 2006, “Comparison of support-vector machine and back propagation neural networks in forecasting the six major Asian stock markets,” International Journal of Electronic Finance, vol. 1, no. 1, pp. 49–67. Chen, T., 2007, “Predicting Wafer-Lot Output Time With a Hybrid FCM–FBPN Approach,” IEEE Transactions on Systems, Man, and Cybernetics, vol. 37, no. 4, pp. 784–793. Chern, C. and Liu, Y., 2003, “Family-Based Scheduling Rules of a Sequence-Dependent Wafer Fabrication System,” IEEE Transactions on Semiconductor Manufacturing, vol. 16, no. 1, pp. 15–25. Chien, C. -F., Hsiao, A., and Wang, I., 2004, “Constructing semiconductor manufacturing performance indexes and applying data mining for manufacturing data analysis”, Journal of the Chinese Institute of Industrial Engineers, vol. 21, no. 4, pp. 313–327. Chien, C. -F. and Chen, C., 2007, “A Novel Timetabling Algorithm for a Furnace Process for Semiconductor Fabrication with Constrained Waiting and Frequency-based Setups,” OR Spectrum, vol. 29, no. 3, pp. 391–419. Chien, C. -F, Wang, W., and J. Cheng, J., 2007, “Data mining for yield enhancement in semiconductor manufacturing and an empirical study,” Expert Systems with Applications, vol. 33, no. 1, pp. 192–198. Chien, C. -F. and Chen, L. -F., 2008, “Data mining to improve personnel selection and enhance human capital: A case study in high-technology industry,” Expert Systems with Applications, vol. 34, no. 1, pp. 280–290. Chou, Y. and Wu, C., 2002, “Economic analysis and optimization of machine portfolio in semiconductor manufacturing,” IEEE Transactions on Semiconductor Manufacturing, vol. 15, no. 4, pp. 447–453. Chung, S. H., Huang, C. Y., and Lee, A. H., 2006, “Capacity allocation model for photolithography workstation with the constraints of process window and machine dedication,” Production Planning & Control, vol. 17, no. 7, pp. 678–688. Connors, D., Feigin, G., and Yao, D., 1994, “Scheduling Semiconductor Lines Using a Fluid Network Model,” IEEE Transactions on Robotics and Automation, vol. 10, no. 2, pp. 88–98. Connors, D. P., Feigin, G. E., and Yao, D. D., 1996, “A queueing network model for semiconductor manufacturing,” IEEE Transactions on Semiconductor Manufacturing, vol. 9, no. 3, pp. 412–427. Dabbas, R. M., Chen, H., Fowler, J. W., and Shunk, D., 2001, “A combined dispatching criteria approach to scheduling semiconductor manufacturing systems,” Computers & Industrial Engineering, vol. 39, no. 3–4, pp. 307–324. Dabbas, R. M. and Fowler, J. W., 2003, “A New Scheduling Approach Using Combined Dispatching Criteria in Wafer Fabs,” IEEE Transactions on Semiconductor Manufacturing, vol. 16, no. 3, pp. 501–510. Duwayri, Z., Mollaghasemi, M., Nazzal, D., and Rabadi, G., 2006, “Scheduling setup changes at bottleneck workstations in semiconductor manufacturing,” Production Planning & Control, vol. 17, no. 7, pp. 717–727. Ehteshami, B., Petrakian, R. G., and Shabe, P. M., 1992, “Trade-Offs in Cycle Time Management: Hot Lots,” IEEE Transactions on Semiconductor Manufacturing, vol. 5, no. 2, pp. 101–106. Fayyad, U., Piatesky-Shapiro, G., and Smyth, P., 1996, “The KDD process for extracting useful knowledge from volumes of data,” Communications of the ACM, vol. 39, no. 11, pp. 27–34. Fowler, J. W., Phillips, D. T., and Hogg, G. L., 1992, “Real-Time Control of Multiproduct Bulk-Service Semiconductor Manufacturing Processes,” IEEE Transactions on Semiconductor Manufacturing, vol. 5, no. 2, pp. 158–163. Fowler, J. W., Hogg, G. L., and Phillips, D. T., 2000, “Control of multiproduct bulk server diffusion/oxidation processes. Part 2: multiple servers,” IIE Transactions, vol. 32, no. 2, pp. 167–176. Fowler, J. W., Phojanamongkolkij, N., Cochran, J. K., and Montgomery, D. C., 2002, “Optimal batching in a wafer fabrication facility using a multiproduct G/G/c model with batching processing,” International Journal of Production Research, vol. 40, no. 2, pp. 275–292. Fronckowiak, D., Peikert, A., and Nishinohara, K., 1996, “Using Discrete Event Simulation to Analyze the Impact of Job Priorities on Cycle Time in Semiconductor Manufacturing,” in Proceedings of the 1996 IEEE/SEMI advanced semiconductor manufacturing conference, pp. 151–155. Fu, Y., 1997, “Data mining: tasks, techniques and applications,” IEEE Potentials, vol. 16, no. 4. pp. 18–22. Fu, J. Y., Liang, S. G., and Li, Q. S., 2007, “Prediction of wind-induced pressures on a large gymnasium roof using artificial neural networks,” Computers and Structures, vol. 85, no. 3–4, pp. 179–192. Geiger, C. D., Hase, R., Takoudis, C. G., and Uzsoy, R., 1997, “Alternative Facility Layouts for Semiconductor Wafer Fabrication Facilities,” IEEE Transactions on Components, Packaging, and Manufacturing Technology—Part C, vol. 20, no. 2, pp. 152–163. Glassey, C. R. and Resende, M. G. C., 1988, “Closed-Loop Job Release Control for VLSI Circuit Manufacturing,” IEEE Transactions on Semiconductor Manufacturing, vol. 1, no. 1, pp. 36–46. Glassey, C. R. and Weng, W. W., 1991, “Dynamic Batching Heuristic for Simultaneous Processing,” IEEE Transactions on Semiconductor Manufacturing, vol. 4, no. 2, pp. 77–82. Glassey, C. R., Shanthikumar, J. G., and Seshadri, S., 1996, “Linear control rules for production control of semiconductor fabs,” IEEE Transactions on Semiconductor Manufacturing, vol. 9, no. 4, pp. 536–549. Grewal, N., and Robinson, J. K., 1998, “Integrating targeted cycle-time reduction into the capital planning process,” in Proc. 1998 winter simulation conference, pp. 1005–1010. Guyon, I. and Elisseeff, A., 2003, “An introduction to variable and feature selection,” Journal of Machine Learning Research, vol. 3, pp. 1157–1182. Han, J. and Kamber, M., 2001, Data mining: Concepts and techniques. San Francisco, CA: Morgan Kaufman. Hatch, N. W. and Mowery, D. C., 1998, “Process Innovation and Learning by Doing in Semiconductor Manufacturing,” Management Science, no. 44, vol. 11, pp. 1461–1477. Hopp, W. J. and Spearman, M. L., 2001, Factory Physics: Foundations of Manufacturing Management, Irwin McGraw-Hill, London. Hopp, W. J., Spearman, M. L., Chayet, S., and Donohue, K. L., 2002, “Using an optimized queueing network model to support wafer fab design,” IIE Transactions, vol. 34, no. 2, pp. 119–130. Hsu S. -C. and Chien, C. -F., 2007, “Hybrid Data Mining Approach for Pattern Extraction from Wafer Bin Map to Improve Yield in Semiconductor Manufacturing,” International Journal of Production Economics, vol. 107, no. 1, pp. 88–103. Hu, M. and Chang, S., 2003, “Translating overall production goals into distributed flow control parameters for semiconductor manufacturing,” Journal of Manufacturing Systems, vol. 22, no. 1, pp. 46–63. Huang, C. L., Huang, Y. H., Chang, T.Y., Chang, S. H., Chung, C. H., Huang, D. T., and Li, R. K., 1999, “The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks,” International Journal of Production Research, vol. 37, no. 6. pp. 1387–1402. Huang, M., Chang, P., and Chou, Y., 2001, “Analytical approximation for multiserver batch-service workstations with multiple process recipes in semiconductor wafer fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 14, no. 4, pp. 395–405. Hung, Y. and Chen, I., 1998, “A simulation study of dispatch rules for reducing flow times in semiconductor wafer fabrication,” Production Planning & Control, vol. 9, no. 7, pp. 714–722. Hung, Y. and Chen, I., 2000, “Dynamic operator assignment based on shifting machine loading,” International Journal of Production Research, vol. 38, no. 14, pp. 3403–3420. Ignizio, J. P., 2004, “Optimal maintenance headcount allocation: an application of Chebyshev Goal Programming,” International Journal of Production Research, vol. 42, no. 1, pp. 201–210. Iwata, Y., Taji, K., and Tamura, H., 2003, “Multi-objective capacity planning for agile semiconductor manufacturing,” Production Planning & Control, vol. 14, no. 3, pp. 244–254. Jacobs, J. H., Etman, L. F. P., van Campen, E. J. J., and Rooda, J. E., 2003, “Characterization of operational time variability using effective process times,” IEEE Transactions on Semiconductor Manufacturing, vol. 6, no. 3, pp. 511–520. Jacobs, J. H., van Bakel, P. P., Etman, L. F. P., and Rooda, J. E., 2006, “Quantify variability of batching equipment using effective process times,” IEEE Transactions on Semiconductor Manufacturing, vol. 19, no. 2, pp. 269–275. Kang, H. -Y. and Lee, A. H. I., 2007, “Priority mix planning for semiconductor fabrication by fuzzy AHP ranking,” Expert Systems with Applications, vol. 32, no. 2, pp. 560–570. Kermanshahi, B., 1998, “Recurrent neural network for forecasting next 10 years loads of nine Japanese utilities,” Neurocomputing, vol. 23, no. 1–3, pp. 125–133. Kim, B. and Park, K., 2005, “Modeling plasma etching process using a radial basis function network,” Microelectronic Engineering, vol. 77, no. 2, pp. 150–157. Kim, K., 2003, “Financial time series forecasting using support vector machines,” Neurocomputing,” vol. 55, no. 1–2, pp. 307–319. Kim, S., Yea, S., and Kim, B., 2002, “Shift Scheduling for Stepper in the Semiconductor Wafer Fabrication Process,” IIE Transactions, vol. 34, pp. 167–177. Kimura, T., 1986, “A two-moment approximation for the mean waiting time in the GI/ G/S queue,” Management Science, vol. 32, no. 6, pp. 751–763. Kirkos, E., Spathis, C., and Manolopoulos, Y., 2007, “Data Mining techniques for the detection of fraudulent financial statements,” Expert Systems with Applications, vol. 32, no. 4, pp. 995–1003. Konarski, C., Peruffo, N., and Warren, R., 2001, “The Need for Speed: IBM’s Raw Process Time Reduction Success Means Faster Turnaround Time for Customers,” MicroNews, vol. 7, no. 4, pp. 8–10. Kuo, C. -J., Liu, C. -M., and Chi, Liu, C. -Y., 2008, “Standard WIP Determination and WIP Balance Control with Time Constraints in Semiconductor Wafer Fabrication,” Journal of Quality, vol. 15, no. 6, pp. 409–423. Leachman, R. C., Kang, J., and Lin, V., 2001, “SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics,” Interfaces, vol. 32, no. 1, pp. 61–77. Lee, C. and Chen, C., 1997, “A Dispatching Scheme Involving Move Control and Weighted Due Date for Wafer Foundries,” IEEE Transactions on Components, Packaging, and Manufacturing Technology—Part C, vol. 20, no. 4, pp. 268–277. Lee, H. L., Padmanabham, V., and Whang, S., 1997, “The bullwhip effect in supply chains,” Sloan Management Review, vol. 30, no. 3. pp. 93–102. Lee, Y. H. and Kim, T., 2002, “Manufacturing Cycle Time Reduction Using Balance Control in the Semiconductor Fabrication Line,” Production Planning & Control, vol. 13, no. 3, pp. 529–540. Li, S., Tang, T., and Collins, D. W., 1996, “Minimum inventory variability schedule with application in semiconductor fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 9, no. 1, pp. 145–149. Lin, J., Wang, F., and Chang, Y., 2006, “A hybrid push/pull-dispatching rule for a photobay in a 300mm wafer fab,” Robotics and Computer-Integrated Manufacturing, vol. 22, no. 1, pp. 47–55. Lin, Y. and Lee, C., 2001, “A total standard WIP estimation method for wafer fabrication,” European Journal of Operation Research, vol. 131, no. 1, pp. 78–94. Lin, Y., Shie, J., and Tsai, C., 2009, “Using an artificial neural network prediction model to optimize work-in-process inventory level for wafer fabrication,” Expert Systems with Applications, vol. 36, no. 2, pp. 3421–3427. Lolas, S. and Olatunbosun, O. A., 2008, “Prediction of vehicle reliability performance using artificial neural networks,” Expert Systems with Applications, vol. 34, no. 4, pp. 2360–2369. Lou, S. X. C. and Kager, P. W., 1989, “A robust production control policy for VLSI wafer fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 2, no. 4, pp. 159–164. Lu, S. C. H., Ramaswamy, D., and Kumar, P. R., 1994, “Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants,” IEEE Transactions on Semiconductor Manufacturing, vol. 7, no. 3, pp. 374–388. Miltenburg, J., Cheng, C. H., and Yan, H., 2002, “Analysis of wafer fabrication facilities using four variations of the open queueing network decomposition model,” IIE Transactions, vol. 34, no. 3, pp. 263–272. Morrison, J. R. and Martin, D. P., 2007, “Practical extensions to cycle time approximations for the G/G/m-queue with applications,” IEEE Transactions on Automation Science and Engineering, vol. 4, no. 4, pp. 523–532. Mosley, S. A., Teyner, T., and Uzsoy, R. M., 1998, “Maintenance Scheduling and Staffing Policies in a Wafer Fabrication Facility,” IEEE Transactions on Semiconductor Manufacturing, vol. 11, no. 2, pp. 316–323. Nakata, T., Matsui, K., Miyake, Y., and Nishioka, K., 1999, “Dynamic bottleneck control in wide variety production factory,” IEEE Transactions on Semiconductor Manufacturing, vol. 12, no. 3, pp. 273–280. Narahari, Y. and Khan, M., 1997, “Modeling the Effect of Hot Lots in Semiconductor Manufacturing Systems,” IEEE Transactions on Semiconductor Manufacturing, vol. 10, no. 1, pp. 185–188. Nazzal, D., Mollaghasemi, M., and Anderson, D., 2006, “A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility—a case study,” International Journal of Production Economics, vol. 100, no. 2, pp. 300–313. Olsen,T. L., 2001, “Approximations for the waiting time distribution in polling models with and without state-dependent setups,” Operations Research Letters, vol. 28, no.32, pp. 113–123. Qi, C., Sivakumar, A. I., and Gershwin, S. B., 2008, “Impact of Production Control and System Factors in Semiconductor Wafer Fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 21, no. 3, pp. 376–389. Qiu, R. G., 2005, “Virtual Production Line Based WIP Control for Semiconductor Manufacturing Systems,” International Journal of Production Economics, vol. 95, no. 2, pp. 165–178. Robinson, J. K., Fowler, J. W., and Bard, J. F., 1995, “The use of upstream and downstream information in scheduling semiconductor batch operations,” International Journal of Production Research, vol. 33, no. 7, pp. 1849–1869. Robinson, J. K. and Giglio, R., 1999, “Capacity planning for semiconductor wafer fabrication with time constraints between operations,” in Proceedings of the 1999 Winter Simulation Conference, pp. 880–887. Saito, K., 2007, “A Robust Dispatching Algorithm for Autonomous Distributed Manufacturing of Mixed VLSI Products,” IEEE Transactions on Semiconductor Manufacturing, vol. 20, no. 3, pp. 299–305. Saraswat, K. C. et al., 1994, “Rapid Thermal Multiprocessing for a Programmable Factory for Adaptable Manufacturing of IC’s,” IEEE Transactions on Semiconductor Manufacturing, vol. 7, no. 2, pp. 159–175. Scholl, W. and Domaschke, J., 2000, “Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations,” IEEE Transactions on Semiconductor Manufacturing, vol. 13, no. 3, pp. 273–277. Setiono, R. and Liu, H., 1997, “Neural-network feature selector,” IEEE Transactions on Neural Networks, vol. 8, no. 3, pp. 654–662. Shanthikumar, J. G., Ding S., and Zhang, M. T., 2007, “Queueing theory for semiconductor manufacturing systems: a survey and open problems,” IEEE Transactions on Automation Science and Engineering, vol. 4, no. 4, pp. 513–522. Smith, K. A. and Gupta, J. N. D., 2000, “Neural networks in business: techniques and applications for the operations researcher,” Computers & Operations Research, vol. 27, no. 11, pp. 1023–1044. Sung, C. S. and Choung, Y. I., 1999, “A neural network approach for batching decisions in wafer fabrication,” International Journal of Production Research, vol. 37, no. 13, pp. 3101–3114. Tu, Y. M. and Li, R. K., 1998, “Constraint Time Buffer Determination Model,” International Journal of Production Research, vol. 36, no. 4, pp. 1091–1103 Tu, Y. M. and Liou, C., 2006, “Capacity determination model with time constraints and batch processing in semiconductor wafer fabrication,” Journal of Chinese Institute of Industrial Engineers, vol. 23, no. 3, pp. 192–199. Uzsoy, R. M., Lee, C., and Martin-vega, L. A., 1992, “A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning,” IIE Transactions, vol. 24, no. 4, pp. 47–60. Wang, C. N. and Wang, C. H., 2007, “A simulated model for cycle time reduction by acquiring optimal lot size in semiconductor manufacturing,” International Journal of Advanced Manufacturing Technology, vol. 34, no. 9–10, pp. 1008–1015. Wang, K. J., Chen, J. C., and Lin, Y. S., 2005, “A hybrid knowledge discovery model using decision tree and neural network for selecting dispatching rules of a semiconductor final testing factory,” Production planning & control, vol. 16, no. 7, pp. 665–680. Wang, Z., Wu, Q., and Qiao, F., 2007, “A lot dispatching strategy integrating WIP management and wafer start control,” IEEE Transactions on Automation Science and Engineering, vol. 4, no. 4, pp. 579–583. Wein, L. M., 1988, “Scheduling Semiconductor Wafer Fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 1, no. 3, pp. 115–130. Weng, W. W. and Leachman R. C., 1993, “An Improved Methodology for Real-Time Production Decisions at Batch-Process Work Stations,” IEEE Transactions on Semiconductor Manufacturing, vol. 6, no. 3, pp. 219–225. Whitt, W., 1993, “Approximations for the GI/G/m queue,” Production and Operations Management, vol. 2, no. 2, pp. 114–161. Wu, M., Huang, Y. L. Chang, Y. C., and Yang, K. F., 2006, “Dispatching in semiconductor labs with machine-dedication features,” International Journal of Advanced Manufacturing Technology, vol. 28, no. 9–10, pp. 978–984. Wu, M. and Chang, W., 2007, “A short-term capacity trading method for semiconductor fabs with partnership,” Expert Systems with Applications, vol. 33, no. 2, pp. 476–483. Wu, M., Chiou, S., and Chen, C., 2008, “Dispatching for make-to-order wafer fabs with machine-dedication and mask set-up characteristics,” International Journal of Production Research, vol. 46, no. 14, pp. 3993–4009. Wu, S., Hung, S., and Lin, B., 2006, “Agile strategy adaptation in semiconductor wafer foundries: An example from Taiwan,” Technological Forecasting & Social Change, vol. 73, no. 4, pp. 436–451. Yao, X., Fernández-Gaucherand, E., Fu, M. C., and Marcus, S. I., 2004, “Optimal preventive maintenance scheduling in semiconductor manufacturing,” IEEE Transactions on Semiconductor Manufacturing, vol. 17, no. 3, pp. 345–356. Yim, S. J. and Lee, D. H., 1999, “Scheduling cluster tools in wafer fabrication using candidate list and simulated annealing,” Journal of Intelligent Manufacturing, vol. 10, no. 6, pp. 531–540. Yoon, H. J. and Lee, D. Y., 2000, “A Control Method to Reduce the Standard Deviation of Flow Time in Wafer Fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 13, no. 3, pp. 389–392. Yoon, H., Yang, K., and Shahabi, C., 2005, “Feature subset selection and feature ranking for multivariate time series,” IEEE Transactions on Knowledge and Data Engineering, vol. 17, no. 9, pp. 1186–1198. Yu, C. and Huang, H., 2002, “On-line learning delivery decision support system for highly product mixed semiconductor foundry,” IEEE Transactions on Semiconductor Manufacturing, vol. 15, no. 2, pp. 274–278.
|