林鼎浩(2000),建構半導體製程資料挖礦架及其實證研究,國立清華大學工業工程與工程管理學系碩士論文。邱泉樺(2005),機台產出率監控及管理系統-某半導體廠實證研究,國立清華大學工業工程與工程管理學系碩士論文。郭仲仁(2010),半導體晶圓製造週期時間與其變異的縮短以及晶圓製造週期時間的差異化服務之研究,國立清華大學工業工程與工程管理學系博士論文陳正乂(1999),晶圓代工廠降低生產週期時間標竿管理方法之研究,國立交通大學工業工程與管理學系碩士論文。鄭仁傑(2003),以混合決策樹方法分析有相互關係之半導體製造資料,國立清華大學工業工程與工程管理學系碩士論文。簡禎富(2005),決策分析與管理,雙葉書廊,台北。
簡禎富、王鴻儒、徐紹鐘、李培瑞(2002),決策樹資料挖礦架構及其於半導體製程之實證研究,科技管理學刊,7卷1期,頁137-160。簡禎富、施義成、林振銘、陳瑞坤(2005),半導體製造技術與管理,清華大學出版社,新竹。
Akcalt, E., Nemoto, K., and Uzsoy, R., (2001), “Cycle-time Improvements for Photolithography Process in Semiconductor Manufacturing,” IEEE Transactions on Semiconductor Manufacturing, Vol. 14, No. 1, pp. 48-56.
Backus, P., Janakiram, M., Mowzoon, S., Runger, C., and Bhargava, A., (2006), “Factory Cycle-Time Prediction with a Data-Mining Approach,”, IEEE Transactions on Semiconductor Manufacturing, Vol. 19, No. 2, pp.252-258.
Berson, A., Smith, S. and Thearling, K., (2000), Building Data Mining Applications for CRM, McGraw Hill, New York.
Berry, M. and Linoff, G., (1997), “Data Mining Techniques for Marketing, Sales and Customer Support,” John Wiley and Sons, New York.
Breiman, L., Friedman, J. H., Olshen, R. J., and Stone, C. J., (1984), Classification and Regression Trees, Belmont, California.
Chen, L. F. and Chien, C. F., (2011), “Manufacturing intelligence for class prediction and rule generation to support human capital decisions for high-tech industries,” Flexible Services and Manufacturing Journal, Online.
Chien, C. F., (2007), “Made in Taiwan: Shifting Paradigms in high-tech Industries”, Industrial Engineer, Vol. 9, No. 2, pp. 47-49.
Chien, C. F., Chen, Y. J., and Peng, J. T., (2010), “Manufacturing Intelligence for Semiconductor Demand Forecast based on Technology Diffusion and Product Life Cycle,” International Journal of Production Economics, Vol. 128, No. 2, pp. 496-509.
Chien, C. F., Hsiao, C. W., Meng, C., Hong, K. T., and Wang, S. T., (2005), “Cycle Time Prediction and Control Based on Production Line Status and Manufacturing Data Mining,” IEEE International Symposium on Semiconductor Manufacturing, San Jose, California.
Chien, C. F. and Hsu, C. Y., (2011), “UNISON Analysis to Model and Reduce Step-and-Scan Overlay Errors for Semicondu ctor Manufacturing,” Journal of Intelligent Manufacturing, Vol. 22, No. 3, pp. 399-412.
Crandall, R. E. and Burwell, T. H.‚ (1993) “The Effect of Work In Process Inventory Levels on Throughput and Lead Times‚” Production and Inventory Management Journal‚ Vol. 34‚ No. 1‚ pp. 6-12.
Etheshami, B., Petrakian, R. G., and Shabe, P. M., (1992), “Trade-Offs in Cycle Time Management: Hot Lots,” IEEE Transactions on Semiconductor Manufacturing, Vol. 5, No. 2, pp. 101-105.
Fayyad, U., (1997), “Data Mining and Knowledge Discovery in Database: Implication for Scientific Databases,” Scientific and Statistical Database Management, pp. 2-11.
Fayyad, U., Piatetsky-Shapiro, G., and Smyth, P., (1996), “The KDD Process for Extracting Useful Knowledge form Volumes of data,” Communication of ACM‚ Vol. 39‚No.11‚ pp. 27-34.
Fowler, J. W., Phojanamongkolkij, N., Cochran, J. K., and Montgomery, D. C., (2002), “Optimal Batching in a Wafer Fabrication Facility Using a Multiproduct G/G/c Model with Batching Processing,” International Journal of Production Research,” Vol. 40, No. 2, pp. 275-292.
Gandner, M. and Bieker, J., (2000), “Data Mining Solves Tough Semiconductor Manufacturing Problem,” KDD2000 Proceedings of the sixth ACM SIGKDD international conference on Knowledge discovery and data mining, Boston, New York.
Geiger, C. D., Hase, R., Takoudis, C. G., and Uzsoy, R., (1997), “Alternative Facility Layouts for Semiconductor Wafer Fabrication Facilities,” IEEE Transactions on Components, Packaging, and Manufacturing Technology—Part C, Vol. 20, No. 2, pp.152-163.
Glassey, C. R., Shanthikumar, J. G., and Seshadri, S., (1996), “Linear Control Rules for Production Control of Semiconductor Fabs,” IEEE Transactions on Semiconductor Manufacturing, Vol. 9, No. 4, pp. 536-549.
Glassey, C. R. and Weng, W. W., (1991), “Dynamic Batching Heuristic for Simultaneous Processing,” IEEE Transactions on Semiconductor Manufacturing, Vol. 4, No. 2, pp. 77-82.
Han, J. and Kamber, M., (2001), Data Mining: Concepts and Techniques. Morgan Kaufmann, San Francisco.
Hopp, W. J. and Spearman, M. L., (2001), Factory Physics: Foundations of Manufacturing Management, McGraw Hill, London.
Ignizio, J. P., (2004), “Optimal maintenance headcount allocation: an application of Chebyshev Goal Programming,” International Journal of Production Research, Vol. 42, No. 1, pp. 201-210.
Kleissner, C., (1998), “Data Mining for the Enterprise”, Proceedings of the Thirty-First Hawaii International Conference on System Sciences, Kohala Coast, Hawaii.
Krivda, C. D., (1996), “Unearthing Underground Data,” LAN-The Network Solutions Magazine, Vol. 11, No. 5, pp.42-48.
Kuo, C. J., Chien, C. F., and Chen, J. D., (2010), “Manufacturing Intelligence to Exploit the Value of Production and Tool Data to Reduce Cycle Time,” IEEE Transactions on Automation Science and Engineering, Vol. 8, No. 1, pp. 103-111.
Lee, Y., Kim, S., Yea, S., and Kim, B., (1997), “Production Planning in Semiconductor Wafer Fab Considering Variable Cycle Times,” Computers and Industrial Engineering, Vol. 33, No. 3-4, pp. 713-716.
Lim, T. S., Loh, W. Y., and Shih, Y. S., (2000), “A Comparison of Prediction Accracy, Complexity, and Training Time of Thirty-three Old and New Classification Algorithms,” Machine Learning, Vol.40, No. 3, pp. 203-229.
Lu, S. C. H., Ramaswamy, D., and Kumar, P. R., (1994), “Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants,” IEEE Transactions on Semiconductor Manufacturing, Vol. 7, No. 3, pp. 374-388.
Maiorana, A. and Iuliano, G., (1997) “Improving Cycle Time Through Managing Variability in a DRAM Production Line,” IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings, San Francisco, California.
Meyersdorf, D. and Yang, T., (1997), “Cycle Time Reduction for Semiconductor Wafer Fabrication Facilities,” IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop, Cambridge, Massachusetts.
Mittler, M. and Schoemig, A. K., (1999), “Comparison of Dispatching Rules for Semiconductor Manufacturing Using Large Facility Models,” Proceedings of the 1999 Winter Simulation Conference, Phoenix, Arizona.
Mosley, S. A., Teyner, T., and Uzsoy, R. M., (1998), “Maintenance Scheduling and Staffing Policies in a Wafer Fabrication Facility,” IEEE Transactions on Semiconductor Manufacturing, Vol. 11, No. 2, pp. 316-323.
Pyle, D., (1999), Data Preparation for Data Mining, Morgan Kaufmann Publishers, San Francisco.
Quinlan, J. R., (1986), “Induction of decision tree ,” Machine Learning, Vol. 1, No. 3, pp.81-106.
Quinlan, J. R. (1993), C4.5: Programs for Machine Learning. Morgan Kaufmann, San Francisco.
Robinson, J. K., (2002), “Understanding and Improving Wafer Fab Cycle Times,” Semiconductor FabTech, Vol. 17.
Rose, O., (1998), “WIP Evolution of A Semiconductor Factory After a Bottleneck Workcenter Breakdown,” Proceedings of the 1998 Winter Simulation Conference, Washington, District of Columbia.
SPSS Clementine, (2008), SPSS Clementine12.0, IBM, New York.
SPSS Statistics, (2009), SPSS Statistics 17.0, IBM, New York.
Standard for Definition and Measurement of Equipment Reliability, Availability, and Maintainability (RAM), (1999), Semiconductor Equipment and Materials International, SEMI E10-0299.
Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., (1992), “A Review of Production Planning and Scheduling Models in Semiconductor Industry. Part I: System Characteristics, Performance Evaluation and Production planning,” IIE Transactions, Vol. 24, No. 4, pp. 47-60.
Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., (1994), “A Review of Production Planning and Scheduling Models in Semiconductor Industry. Part II: Shop Floor Control,” IIE Transactions, Vol. 26, No. 5, pp. 44-54.
Wang, C. N. and Wang, C. H., (2007), “A Simulated Model for Cycle Time Reduction by Acquiring Optimal Lot Size in Semiconductor Manufacturing,” International Journal of Advanced Manufacturing Technology, Vol. 34, No. 9-10, pp. 1008-1015.
Westphal, C. and Blaxton, T., (1998), Data Mining Solutions: methods and tools for solving real-world problems, John Wiley and Sons, New York.
Wu, C. C., Chien, C. F., and Wu, J. Z., (2009), “Construct a Demand Fulfillment Model Considering NTO Allocation for Semiconductor Manufacturing,” Proceedings of Chinese Institute of Industrial Engineers Conference, Taichung, Taiwan.
Zargar, A. M., (1995), “Effect of Rework Strategies on Cycle Time,” Computers Industrial Engineering, Vol. 29, No. 1-4, pp. 239-243.