中文部分
蔣其軒 (2007),「利用共同週期法求解不完美生產系統下可變動生產速率之經濟批量排程問題」,國立成功大學工業管理研究所碩士論文。英文部分
Ben-Daya, M., Hariga, M., Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society 51(7), 875-881, 2002.
Bomberger, E., A dynamic programming approach to a lot size scheduling problem. Management Science 12(11), 778-784, 1966.
Dobson, G., The economic lot-scheduling problem: achieving feasibility using time-varying lot sizes. Operations Research 35(5), 764-771, 1987.
Elmaghraby, S., The economic lot scheduling problem (ELSP): review and extensions. Management Science 24(6), 587-598, 1978.
Hanssmann, F., Operations Research in Production and Inventory Control, John Wiley & Sons, New York, 1962.
Hsu, W., On the general feasibility test of scheduling lot sizes for several products on one machine. Management Science 29(1), 93-105, 1983.
Moon, I., Giri, B., Choi, K., Economic lot scheduling problem with imperfect production processes and setup times. Journal of the Operational Research Society 53(6), 620-629, 2002.
Porteus, E., Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research 34(1), 137-144, 1986.
Rogers, J., A computational approach to the economic lot scheduling problem. Management Science 4(3), 264-291, 1958.
Rosenblatt, M., Lee, H., Economic production cycles with imperfect production processes. IIE transactions 18(1), 48-55, 1986.
Silver, E.A., Pyke, D.F., Peterson, R., Intentory management and production planning and scheduling, Third Ed., John Wiley &Sons, New York, 1998.
Tang, O., Teunter, R., Economic lot scheduling problem with returns. Production and Operations Management 15(4), 488-497, 2006.
Teunter, R., Lot-sizing for inventory systems with product recovery. Computers and Industrial Engineering 46(3), 431-441, 2004.
Teunter, R., Kaparis, K., Tang, O., Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. European Journal of Operational Research 191(3), 1241-1253, 2008.
Thieny, M., Salomon, M., Nunen, J.V., Wassenhove, L.V., Strategic issues in product recovery management. California Management Review 37(2), 114-135, 1995.
Wagner, B., Davis, D., A search heuristic for the sequence-dependent economic lot scheduling problem. European Journal of Operational Research 141(1), 133-146, 2002.