[1]Alchian, ”Reliability of progress curves in airframe production,” Econometrica, Vol.31, no.4, pp.679-693, 1963.
[2]A.R. Washburn, “The effects of discounting profits in the presence of learning in the optimization of production rates,” AIIE Trans., Vol.4, pp.205-213, 1972.
[3]A.S. Goldberger, “The interpretation and estimation of Cobb-Douglas functions,” Econometrica, Vol.35, nos.3-4, pp.464-472, 1968
[4]Alder, G. L. and R. Nanda, ”The effects of learning on optimal lot size determination — single product case,” AIIE Transactions, Vol.6, No. 1, pp.14-20, 1974
[5]Bailey, C.D., “Forgetting and the learning curve:a laboratory study,” Management Science, Vol.35, No.3, pp.340-352, 1989
[6]Bevis, F.W. and Towill, D.R., “Managerial control systems based on learning curve models,” INT. J.PROD. RES., Vol11, No.3, pp.219-238, 1972.
[7]C.C. Pegels, “On Startup or learning curves:An expanded view,” AIIE Trans., Vol.1, no.3, pp.216-222, Sept. 1969.
[8]Carlson, J.G., ”Cubic Learning curves:Precision tool for labor estimating,” Manufacturing Engineering and Management, Vol.71, No.5, pp22-25, 1973
[9]Cherrington, J.E., Lippert and D.R. towill, “The effect of prior experience on learning curve parameters,” International Journal of Production Research, Vol.25, No.3, pp.399-411, 1987
[10]E.V. McIntyre, “Cost-volume-profit analysis adjusted for learning,” Management Sci., Vol.10, pp.149-160, 1977.
[11]E.W. Waller and T. J. Dwyer, ”Alternative techniques for use in parametric cost analysis,” Concepts — Journal of Defense Systems Acquisition Management, Vol.4, no.2, pp.48-59, Spring 1981
[12]F.K. Levy, ”Adaptation in the production process,” Management, Vol.4, no.1, pp.B136-B154, April 1965.
[13]F.S. Hoffman, “Comments on the modified form of the air craft progress functions,” Rep. No.Rn-464, The Rand Corporation, Santa Monica, CA, 1950.
[14]G.R. Knecht, “Costing, technological growth and generalized learning curves,” Oper. Res. Quart., Vol.25, no.3, pp.487-491, Sept. 1974.
[15]G.W. Carr, “Peacetime cost estimating requires new learning curves,” Aviation, Vol.45, April 1946.
[16]Garg, A. and P. Milliman., ”The aircraft progress curve modified for design changes.,” Journal of I.E., Vol.12, No.1, pp23-27, 1961
[17]Globerson, S. and Shtub, A, ”The impact of learning curves on the desing on long cycle time lines,” Industrial Management, Vol.26, No.3, pp.5-10.
[18]Greenberg, L., ”Measurement of the work-accident experience in the American petroleum industry,” American Society Satety Engineers, Vol.15, No.2, pp11-13, 1970
[19]Hancock, Walton M. “The prediction of learning rate for manual operations” Jou. Of I.E., Vol.18, No.1, pp.42-47, 1967
[20]Hirschmann, Winfred B. “Profit from the Learning Curve,” Harvard Business Review, pp.105-119, Jan. 1964
[21]J. D. Camm, T. R. Gulledge, Jr., and N.K. Womer, ”Production rate and contractor behavior,” J. Cost Analysis, vol.5, no.1, pp.27-38, 1987
[22]J.H. Glover, “Manufacturing progress functions:An alternative model and its comparison with existing functions,” Int. J. Production Research, Vol.4, no.4, pp279-300, 1966
[23]J.R. DeJong, “The effects of increasing skill on cycle time and its consequences for time standards,” Ergonomics, pp.51-60, Nov. 1957
[24]Jean-Paul Sallenave, “The Uses and Abuses of Experience Curves,” Long Rang Planning, Vol.18, No.1, p.65, 1985
[25]L.E. Yelle, ”Estimating learning curves for potential products,” Industrial Marketing Management, Vol.5, nos.2/3, pp.147-154, June 1976.
[26]Louis E. Yelle, “The Learning Curve :Historical Review and Comprehensive Survey,” Decision Science, Vol.10, p309, 1979
[27]McGehee W. and Thayer P.W, “Training in Business and Industry,” New York:John Wiley, pp.132, 1961
[28]N. Baloff, “Extension of the learning curve:Some empirical results,” Oper. Res. Quarterly, Vol.22, no.4, pp.329-340, 1971
[29]N.K. Womer, “Learning curves, production rate, and program costs,” Management Sci., vol.25, no.4, pp.312-319, 1979
[30]Niganad Y. Jaber and Maurice Bonney., ”A comparative study of learning curves with forgetting,” Appl. Math. Modelling Vol.21, August 1997
[31]Pankaj Ghemawat, “Building Strategy on the Experience Curve ,” Harvard Business Review, pp.145-146, Mar.-Apr., 1985
[32]R.W. Conway and A. Schultz, Jr., “The manufacturing progress function,” J. Ind. Eng., Vol., no.1, pp.39-53, 1959
[33]Relationship for Determining The Optimal Expansibility of The Elements of a Peacetime Aircraft Procurement Program,” Standford Research Institute, Dec. 1949
[34]S.D. Howell, “Learning curves for new products,” Industrial Marketing Management, Vol.9, no.2, pp.97-99, 1980.
[35]Sheshinski, E., ”Test of the learning by doing hypothesis,” Rev. Economic and Statistics, Vol.49, pp.568-578, 1967.
[36]T.P. Wright, ”Factors affecting the cost of airplanes,” Journal of Aeronautical Sciences, Vol.3, No.4, pp.122-128, Feb.1936.
[37]T.R. Gulledge, Jr., N.K. Womer, and M.M. Tarimcilar, “A discrete dynamic optimization model for made-toorder cost analysis,” Decision Sciences, Vol.16, pp.73-90, 1985.
[38]Tanner, J.P., ”The learning curve,” Production Engineering, Vol.32, No.5, pp.72-79, 1985.
[39]Tommie F. Fowlkes, ”Aircraft Cost Curves,” Deviation Analysis Projection Re-issued, Aug. 1963.
[40]Wu Min-da, “A Study of Progress Function:Applied to Taiwan Compressor and Transformer Companies,” 大同事業經營研究所,碩士論文,民國67年
[41]王克先,『學習心理學』,七版,台北,正中書局,民國68年
[42]呂中元,陳文哲,『製衣業車縫作業學習曲線之研究』,國立交通大學管理科學研究所碩士論文,1981年[43]李希豪,袁建中,『學習區現在飛機工業應用之研究 — 以我國航空業飛機結構組裝為例』,國立交通大學科技管理研究所碩士論文,1992年[44]苗延仁,汪守仁、林聰明,『學習曲線在少量製造成本上的應用』,國立台灣科技大學工程技術研究所工業管理組碩士論文,1986年[45]張春興、楊國樞,『心理學』,第一版,三民書局,民國62年
[46]陳冠羽,楊金福,『IC製造業應用學習曲線於成本模式之研究』,國立交通大學工業工程與管理研究所碩士論文,1998年[47]戴世鴻,邱煥能,『製造業作業學習曲線在生產排程上之應用研究』,國立台灣科技大學工業管理研究所碩士論文,1986年