|
[1] S.J. Kamat, M.W. Riley, “Dtermination of reliability using event-based Monte Carlo simulation”, IEEE Transactions on Reliability, 1976, 24, pp 254-255. [2] W.C. Yeh, “A simple algorithm to search for all MCs in networks”, European Journal of Operation Research, 2006, 174(3), pp 1694-1705. [3] John Y. Lin, Charles E. Donaghey, “Monte Carlo simulation to determine minimal cut sets and system reliability”, Proceedings of the 1993 Annual Reliability and Maintainability Symposium, Atlanta, GA, USA. [4] W.C. Yeh, “A MCS-RSM approach for network reliability to minimise the total cost”, International Journal of Advanced Manufacturing Technology, 2003, 22, pp 681–688. [5] J. Lu, “Studies on the Monte Carlo simulation methods for estimating network reliability”, Master dissertation of the National Tsing Hua University, R.O.C., 1992. [6] S. Soh and S. Rai, “Experimental results on preprocessing of path/cut term in the sum of disjoint products technique”, IEEE Transactions on Reliability, 1993, 42, pp 24-33. [7] S. Kuo, S. Lu, and F. Yeh, “Determining terminal pair reliability based on edge expansion diagrams using OBDD”, IEEE Transactions on Reliability, 1999, 48(3), pp 234–246. [8] J. Kennedy and R.C. Eberhart, C., “Particle Swarm Optimization”, Proceedings of IEEE International Conference on Neural Networks, NJ, USA, 1995, pp 1942−1948. [9] A Allahverdi and FS Al-Anzi, “A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application”, Computers & Operation Research, 2006, 33(4), pp 1056–1080. [10] C.H. Lin, “A squeeze Response Surface Methodology to Construct Approximate Reliability Function of Complex Networks”, Master thesis, Department of the National Tsing Hua University, R.O.C., 2007. [11] ST Soh and S.Rai, “Experimental results on preprocessing of path cut terms in sum of disjoint products technique”, IEEE Transactions on Reliability, 1993, 42(1), pp 24-33. [12] ST Soh and SE Rai, “CAREL:computer-aided reliability evaluator for distributed computing networks”, IEEE Transactions on Parallel and Distributed Systems, 1991, 2(2), pp 199-213. [13] W.C. Yeh, “An improved sum-of-disjoint-products technique for the symbolic network reliability analysis with known minimal paths”, Reliability Engineering and System Safety, 2007, 92(2), pp 260-268. [14] W.C. Yeh, C.H. Lin and Y.C. Lin, “A MCS Based Neural Network Approach to Extract Network Approximate Reliability Function”, Proceedings of Asia Simulation conference, Seoul, Korea, 2007, 11, pp 287−297. [15] H. Wang and H. Pham, “Survey of reliability and availability evaluation of complex networks using Monte Carlo techniques”, Microelectronics and Reliability, 1997, 37(2), pp 187–209. [16] T. Aven, “Availability evaluation of oil gas-production and transportation systems”, Reliability Engineering and System Safety, 1987, 18, pp 35-44. [17] K. Aggarwal, J. Gupta and K. Misra, “A simple method for reliability evaluation of a communication system”, IEEE Transactions on Communications, 1988, 23, pp 563-566. [18] M.A. Samad, “An efficient algorithm for simultaneously deducing minimal paths as well as cuts of a communication-network”, Microelectronics and Reliability, 1987, 27, pp 437-441. [19] W.J. Ke and S.D. Wang, “Reliability evaluation for distributed computing networks with imperfect nodes”, IEEE Transactions on Reliability, 1997, 46, pp 342-349. [20] P. Doulliez and E. Jalnoulle, “Transportation network with random arc capacities”, RAIRO, Rech. Operations Research, 1972, 3, pp 45-60. [21] B. Roy and N.A. Ronald, “Reliability Evaluation of Engineering Systems Concepts and Techniques”, Plenum Press, New York, 1992. [22] A.S. Bustamante, “Monte Carlo methods, in Reliability Engineering”, Proceedings of the ISPRA, 1988. [23] L.L. Levy and A.H. Moore, “A Monde Carlo technique for obtaining system reliability confidence limits from component test data”, IEEE Transactions on Reliability, 1967, 16, pp 69-72. [24] R.E. Rice and A.H. Moore, “A Monte Carlo techniques for estimating lower confidence limits on system reliability using pass-fail data”, IEEE Transactions on Reliability, 1983, 32, pp 366-369. [25] G.S. Fishman, “A Monte Carlo sampling plan for estimating network reliability”, Operations Research, 1986, 34, pp 581-594. [26] P. Kubat, “Estimation of reliability for communication/computer networks simulation/analytical approach”, IEEE Transactions on Communications, 1989, 37, pp 927-933. [27] C.J. Colbourn, “The combinatorics of network reliability”, Oxford University Press, New York, 1987. [28] A. Hoyland and M. Rausand, “System reliability theory: models and statistical methods”, John Wiley & Sons, Inc., 1994. [29] A. Aggarwal and R.E. Barlow, “A survey of network reliability and domination theory”, Operations Research, 1984, 22, pp 478-492. [30] M.O. Ball, “Computational complexity of network reliability analysis: an overview”, IEEE Transactions on Reliability, 1986, 35, pp 230-239. [31] J.Y. Lin and C.E. Donaghey, “Monte Carlo simulation to determine minimal cut sets and system reliability”, Proceedings of the 1993 Annual Reliability and Maintainability Symposium, Atlanta, GA, USA. [32] J.E. Ramirez-Marquez and D.W. Coit, “A Monte-Carlo simulation approach for approximating multi-state two-terminal reliability”, Reliability Engineering and System Safety,2005, 87(2), pp 253-264. [33] C.M. Rocco and E. Zio, “Solving advanced network reliability problems by means of cellular automata and Monte Carlo sampling”, Reliability Engineering and System Safety, 2005, 89(2), pp 219-226. [34] H. Yoshida, K. Kawata, Y. Fukuyama and Y. Nakanishi, “A particle swarm optimization for reactive power and voltage control considering voltage security assessment”, IEEE Transactions on Power Systems, 2000, 15, pp 1232–1239. [35] F. Van den Bergh, A.P. Engelbecht, “Cooperative learning in neural networks using particle swarm optimizers”, South African Computer Journal, 2000, 26, pp 84–90. [36] L.W. Yeh, “Optimal Procurement Policies for Multiproduct Multi-supplier with Capacity Constraint and Price Discount”, Master thesis, Department of Industrial Engineering and Management, Yuan Ze University, Taiwan, ROC, 2003. [37] M.F. Tasgetiren and Y.C. Liang, “A binary particle swarm optimization algorithm for lot sizing problem”, Journal of Economic and Social Research, 2003, 5(2), pp 1–20. [38] M.F. Tasgetiren, M. Sevkli, Y.C. Liang and G. Gencyilmaz, “Particle swarm optimization algorithm for single machine total weighted tardiness problem”, Proceedings of the 2004 Congress on Evolutionary Computation, Portland, Oregon, 2004, pp. 1412–1419. [39] G.C. Onwubolu and M. Clerc, “Optimal operating path for automated drilling operations by a new heuristic approach using particle swarm optimization”, International Journal of Production Research, 2004, 42(3), pp 473–491. [40] M.F. Tasgetiren, Y.C. Liang, M. Sevkli and G. Gencyilmaz, “A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing”, European Journal of Operational Research, 2007, 177(3), pp 1930–1947. [41] J. Moore and R. Chapman, “Application of particle swarm to multiobjective optimization”, Department of Computer Science and Software Engineering, Auburn University, 1999. [42] T.C. Chen, “Penalty Guided PSO for Reliability Design Problems”, Trends in Artificial Intelligence, 2006, pp 777-786.
|