[1]A. Abran and P.N. Robillard, Function analysis: an emprirical study of its measurement process, IEEE Transactions on Software Engineering, vol. 22, no. 12, p895-910, December 1996.
[2]Norman E. Fenton, “Software metrics: theory, tools and validation, Software Engineering Journal, vol. 2, no. 1, p65-84, January 1990.
[3]M. H. Halstead,Elements of software science, Elsevier North-Holland, New York, 1977.
[4]Edilson J.D. Candido and R. Sanches, Estimating the size of web applications by using a simplified function point method, Proc. Web Media and Latin American Web Congress, p98-105, 2004.
[5]A.J. Albrecht and J. Gaffney, “Software function, source lines of code, and development effort prediction: a software science validation, IEEE Transactions on Software Engineering, vol.9, no.6, p639-648, 1983.
[6]DoD(USA), “Department of Defense handbook work breakdown structure, chapter 1, p4, 1998.
[7]B. Boehm, Software engineering economics, Englewood cliff, NJ: Prentice-Hall, 1981.
[8]International Function Point Users Group, Function point counting practices manual release 4.3.1, 2010.
[9]Ray Boehm, “Frequently asked questions, International Function Point Users Group, 2002.
[10]L. Wallace, M. Keil, A. Rai, “Understanding software project risk:a cluster analysis, Information & Management, vol. 42, issue 1, p115-125, 2004.
[11]B. Boehm, Software engineering economics, Prentice Hall PTR; 1st edition, 1981.
[12]J.E. Matson, B.E. Barrett, J.M. Mellichamp, “Software development cost estimation using function points, IEEE Transactions on Software Engineering, vol. 20, no. 4, p275–287, 1994.
[13]S.-J. Huang, C.-Y. Lin and, N.-H. Chiu, “Fuzzy decision tree apporoach for embedding risk assessment information into software cost estimation model, Software Engineering and Software, vol. 22, no. 2, p297-313, 2006.
[14]S. Weisberg, Applied linear regression, Wiley, New York, 1985.
[15]R. Agrawal,T. Imielinski and A. Swami , “Mining association rules between sets of items in large databases, Proc. the 1993 ACM SIGMOD international conference on Management of data, Washington, D.C., United States, p207-216, 1993.
[16]R. Agrawal and R. Srikant, “Fast algorithms for mining association rules, Proc. the 20th International Conference on Very Large Data Bases(VLDB), Santiago, p487-499, 1994
[17]B. Boehm, E. Horowitz, R. Madachy, D. Reifer, B. Clark, B. Steece, W. Brown,S. Chulani, and C. Abts, Software cost estimation with COCOMO II, Englewood cliff, NJ: Prentice-Hall, 2000.
[18]C. E. Walston and C. P. Felix, “A method of programming measurement and estimation, IBM Systems Journal, vol. 16, no. 1, p54–73, 1977.
[19]John W. Bailey and Victor R. Basili, “A meta-model for software development resource expenditures, Proceedings of the 5th international conference on Software engineering, USA, p107–116, 1981.
[20]A.J. Albrecht and J.E. Gaffney, “Software function,source lines of code, and development effort prediction, IEEE Transactions on Software Engineering, vol. 9, no. 6, p639–648, 1983.
[21]C. Jones, “Software cost estimation in 2002, The Journal of Defense Software Engineering, vol. 15, no. 6, p4-8, 2002.
[22]P. Jodpimai, P. Sophatsathit, and C. Lursinsap, “Analysis of effort estimation based on software project models, Proc. Communication and Information Technology, IEEE Press, p715-720, 2009.
[23]D. Port and M. Korte, “Comparative studies of the model evaluation criterions MMRE and PRED in software cost estimation research, Proc. ACM-IEEE international symposium on Empirical software engineering and measurement, ACM Press, New York, USA, p51-60, 2008.
[24]J. J. Cuadrado-Gallego, M.-A. Sicilia, M. Garre, and D. Rodriguez, “An empirical study of process-related attributes in segmented software cost-estimation relationships, The Journal of Systems and Software, vol. 79, p353–361, 2006.
[25]Attarzadeh I. and Siew Hock Ow, “A novel soft computing model to increase the accuracy of software development cost estimation, Proc. The 2nd International Conference on Computer and Automation Engineering, Singapore, p603-607, 2010.
[26]SPSS 17,http://www.spss.com/ (last visited:Dec 15th,2010)
[27]Weka 3, http://www.cs.waikato.ac.nz/ml/weka/ (last visited:Jan 16th,2011)
[28]Super PCNeuron 5.0, http://people.chu.edu.tw/~icyeh/spcn/ (last visited:Jan 20th,2011)
[29]榮思哲,以WBS為基礎之人力估算模型與功能點分析服務,國立中央大學資訊工程學系碩士論文,2007。[30]陳昱祥,基於COCOMO II之元件化軟體開發成本預估,國立成功大學資訊工程學系碩士論文,2009。[31]林煒佑,使用類推及迴歸技術之同質性軟體維護工時評估系統,國立臺灣海洋大學資訊工程學系碩士論文,2007。
[32]林榮泰,應用模糊決策樹分析於研發型專案風險之評估,國立成功大學製造工程研究所碩士論文,2007。[33]湯佳天,問題單處理與專案派工系統之整合與實作,中原大學資訊工程研究所,2009。