中文部份(依姓氏筆劃順序)
1.林志蒼,2000,「新奧工法隧道施工模擬分析-以八卦山隧道為例」,碩士論文,朝陽科技大學營建工程研究所,霧峰。2.沈振裕,1999,「隧道新奧工法之探討」,復興學報,第73-80頁。3.吳獻堂,2000,「應用模糊理論與電腦模擬分析營建操作生產力-COST電腦模擬程式之介紹」,碩士論文,朝陽科技大學營建工程研究所,台中霧峰。4.黃榮堯與劉建忠,2002,「潛盾施工作業之電腦模擬分析」,第六屆營建工程與管理研究成果聯合發表會。
5.鄭道明,2001,營建作業電腦模擬理論與實務,朝陽科技大學,台中霧峰,第17-42頁。
6.鄭道明與吳獻堂,2000,「應用模糊理論與電腦模擬分析營建操作生產力-COST電腦模擬程式之介紹」,營建管理季刊,第45期,第36-47頁。
英文部分(依字母順序)
7.AbouRizk, S. M., Manavazhi M., and Dozzi P. (1997). Analysis of productivity on tunnel operation using computer simulation. Construction congress V : Managing Engineered Construction in Expanding Global Markets, Prentice-Hall, NJ., 382-388.
8.Brennan, T., Hastak, M., Showalter, E., Yamashita, R. (1991). “MicroCYCLONE analysis of free air digger shied tunneling in soft ground.” Dept. of Civ. Engrg., Purdue University, West Lafatette, Ind.
9.Chang, S., Tsujimura, Y., Gen, M., and Tozawa, T. (1995). “An efficient approach for large scale project planning based on fuzzy delphi method.” Fuzzy Sets and System, 76, 277-288.
10.Halpin, D. W., and Riggs, L. S. (1992). Planning and Analysis of Construction Operation, Wiley, New York, 7-132.
11.Ioannou, P. G., and Martinez, J.C. (1996). “Comparison of construction alternatives using matched simulation experiments.” Journal of Construction Engineering and Management, ASCE, 122(3), 231-241.
12.Kelton, W. D., David, W., Deborab, A., and Sadowki, R. P.(1998). Simulation with arena, McGRAW-HILL, New York.
13.Leu, S. S., Chen, A. T., and Yang, C. H. (1999). “Fuzzy optimal model for resource-constrained construction scheduling.” Journal of Computing in Civil Engineering, ASCE, 13(3), 207-216.
14.Nido, A. A., and Abraham, D. M. (1999). “Role of operation simulation in the analysis and improvement of microtunnelling projects.” Trenchless Technol. Res., Elsevier Science Ltd., 14(1), 1-19.
15.Pasit, L., and Moselhi, O. (1996). “Project-network analysis using fuzzy sets theory.”, Journal of Construction Engineering and Management, ASCE, 122(4), 308-317.
16.Ross, T. J. (1997). Fuzzy logic with engineering applications, McGRAW-HILL, New York, 162~176.
17.Sauer, G.(1991). “Further insight into NATM.”, The 23rd Sir Julice Wernber Memorial Lecture.
18.Shipley, M. F., and Omer K. (1997). “BIFPET methodology versus PERT in project management : fuzzy probability instead of beta distribution.” Journal of engineering and technology management.” 14, 49-65.
19.Touran, A., and Asai, T. (1987). “Simulation of tunneling operation.” Journal of Construction Engineering and Management, ASCE, 113(4), 554-568.
20.Zhang, H., Tam, C. M., and Shi, J. J. (2003). “Application of fuzzy logic to simulation for construction operation.” Journal of Construction Engineering and Management, ASCE, 122(3), 308-317.