|
Anis, C. and Daoud, A. K., 2004, Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance. European Journal of Operational Research, 156: 712-718.
Anwar, M. F. and Nagi, R., 1997, Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups. International Journal of Production Research, 35: 1447-1470.
Axsater, S., 2001, A framework for decentralized multi-echelon inventorv control. IIE Transactions, 33: 91-98.
Banerjee, A., 1985, A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17: 292-311.
Ben-Daya, M., 2002, The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics, 76: 257-264.
Biswas, A., Sarkar, J. and Sarkar, S., 2004, Availability of a periodically inspected system, maintained under an imperfect-repair policy. IEEE Transactions on Reliability, 52 (3): 318-331.
Boehle, S., Dobbs, K. and Stamps, D., 2000, Two views of distance learning, Training, 37 (6): 34.
Cheng, T. C. E., 1991, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions, 23: 23-28.
Chiu, S. W., Gong, D. C. and Wee, H. M., 2004, The effects of the random defective rate and the imperfect rework process on the economic production quantity model, Japan. Journal of Industrial and Applied Mathematics, 21(3): 375-389.
Chiu, Y. S. P., Chiu, S. W. and Chao, H. C., 2006, Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Communications in Numerical Methods in Engineering, 22(5): 377-386.
Chiu, Y. P., 2003, Determining the optimal lot size for the finite production model with random defective rate, the rework process and backlogging. Engineering Optimization, 35(4): 427-437.
Chung, K. J. and Hou, K. L., 2003, An optimal production run time with imperfect production processes and allowable shortages. Computers and Operations Research, 30: 483-490.
Collier, G. and Johnson, D. F., 1998, Patch choice as a function of procurement cost and encounter rate. Journal of the Experimental Analysis of Behavior, 69: 5-17.
Das, T. K. and Sarkar, S., 1999, Optimal preventive maintenance in a production inventory system. IIE Transactions, 31: 537-551.
Davey, K. R., 1999, Field optimization using calculus of stationary points. IEE Transactions on Magnetics, 35: 1718-1722.
Dekker, R. and Frenk, J. B. G., 2000, On the newboy model with a cutoff transaction size. IIE Transactions, 32: 461-470.
Erlonkotter, D., 1978, A dual based procedure for uncapacitated facility location. Operations Research, 26: 992-1009.
Taylor, F. W., 1911, Shop Management, Harper and Brothers Publishers, New York and London.
Gavirneni, S. and Tayur, S., 2001, An efficient procedure for non-stationary inventory control. IIE Transactions, 33: 83-89.
Glassey, C. R. and Gupta, V. K., 1974, A linear programming analysis of paper recycling. Management Science, 21: 392-408.
Goyal, S. K., 1976, An integrated inventory model for a single supplier - single customer problem. International Journal of Production Research, 15: 107-111.
Goyal, S. K., 1988, A joint economic lot-size model for purchaser and vendor: A comment. Decision Sciences, 19: 236-241.
Greenberg, H. J., 1995, Mathematical programming models for environmental quality control. Operations Research, 43(4): 578-622.
Gupta, M. C., 1995, Environmental management and its impact on the operations function. International Journal of Operations and Production Management, 15: 34-51.
Ha, D. and Kim, S. L., 1997, Implementation of JIT purchasing: an integrated approach. Production Planning and Control, 8(2): 152-157.
Haase, K., 1994, Lotsizing and Scheduling for Production Planning, Lecture Notes. Economics and Mathematical Systems, (Berlin: Springer), 408.
Harris, F. W., 1913, How many parts to make at once, Factory. The Magazine of Management, 10: 135-136.
Hayek, P. A. and Salameh, M. K., 2001, Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, 12: 584-590.
Hill, R. M., 1999, The optimal production and shipment policy for the single-vendor single-buyer integrated production inventory problem. International Journal of Production Research, 37: 2463-2475.
Hillier, F. S. and Lieberman, G. J., 2001, Introduction to Operations Research. McGraw-Hill Co. Inc., New York, 941-958.
Hillier, F. S. and Lieberman, G. J., 2002, Introduction to Operations Research, Seventh Edition, McGraw-Hill Co. Inc., New York.
Hofmann, C., 1998, Investments in modern production technology and the flow-oriented EPQ-model. International Journal of Production Research, 54: 193-206.
Hopp, W. and Spearman, M., 1996, Factory Physics: Foundations of Factory Management, Irwin/McGraw Hill, Chicago, IL.
Hoque, M. A. and Goyal, S. K., 2000, An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of transport equipment. International Journal of Production Economics, 65: 305-315.
Inderfurth, K., 1997, Simple optimal replenishment and disposal strategies for a product recovery system with leadtimes. OR Spectrum, 19: 111-122.
Islam, M. N., 2004, A methodology for extracting dimensional requirements for a product from customer needs. International Journal of Advanced Manufacturing Technology, 23: 489–494.
Krikke, H. R., Van Harten, A. and Schuur, P., 1999, Business case: reverse logistic network re-design for copiers. OR Spectrum, 31: 381-409.
Kroll, E., Beardsey, B. and Parulian, A., 1996, A methodology to evaluate ease of disassembly for product recycling. IIE Transactions, 28(10): 837-849.
Lapin, L. L., 1994, Quantitative methods for business decisions: with cases, 6th edition. Fort Worth: Dryden Press.
Lee, H. L. and Rosenblatt, M. J., 1987, Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences, 33: 1125-1136.
Liang, X. B. and Wang, J., 2000, A recurrent neural network for nonlinear optimization with a continuously different objective function and bound constraints. IEEE on Neural Networks, 11: 1251-1263
Lin, C. S., Chen, C. H. and Kroll, D. E., 2003, Integrated production-inventory models for imperfect production processes under inspection schedules. Computers and Industrial Engineering, 44: 633-650.
Liu, X. P., Wang, S. W. and Liu, G. F., 2002, Recycling strategy and a recyclability assessment model based on an artificial neural network. Journal of Materials Processing Technology, 129: 500-506.
Ljunggren, M., 2000, Modelling national solid waste management. Waste Management, 18: 525–537.
Nahmias, S., 2001, Production and Operations Analysis. McGraw-Hill Co. Inc., New York, 203-214.
Nie, X. H., Huang, G. H., Li, Y. P. and Liu, L., 2007, IFRP: A hybrid interval-parameter fuzzy robust programming approach for waste management planning under uncertainty. Journal of Environmental Management, 84: 1-11.
Nita, H. and Ajay, S., 2009, An integrated economic lot-size model for vendor–buyer inventory system when input is random. Mathematical and Computer Modelling, 49: 1326-1330.
Osteryoung, S., Nosari, E., McCarty, D. and Reinhart, W.J., 1986, Use of the EOQ model for inventory analysis. Production and Inventory Management, 27: 39-45.
Ouyang, L. Y., Chen, C. K. and Chang, H. C., 2002, Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Computers and Operations Research, 29: 701-1717.
Pham, H. and Wang, H., 1996, Imperfect maintenance. European Journal of Operational Research, 94 (3): 425-438.
Pirkul, H. and Schilling, D. A., 1988, The siting of emergency service facilities with workload capacities and backup service. Management Science, 34: 896-908.
Plossl, G., 1994, Orlicky’s Material Requirements Planning, 2nd edition (New York: McGraw-Hill).
Porteus, E. L., 1986, Optimal lot sizing, process quality improvement and setup cost reduction. Operations Researches, 34: 37-44.
Ramasesh, R. V., 1990, Recasting the traditional inventory model to implement just-in-time purchasing. Production and Inventory Management Journal, 31: 71-75.
Revelle, C., Marks, D. and Liebman, L., 1970, Analysis of private and public sector location models. Management Science, 16: 692-707.
Richter, K., 1996, The EOQ repair and waste disposal model with variable setup numbers. European Journal of Operational Research, 96: 313-324.
Rosenblatt, M. J. and Lee, H. L., 1986, Economic production cycles with imperfect production processes. IIE Transactions, 18: 48-55.
Salameh, M. K. and Jaber, M. Y., 2000, Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64: 59-64.
Silver, E. A., Pyke, D. F. and Peterson, R., 1998, Inventory Management and Production Planning and Scheduling. John Wiley and Sons, Inc., New York, 151- 172.
Sipper, D. and Bulfin, R. L., 1997, Production Planning, Control and Integration, McGraw-Hill.
Stuart, J. A., Ammons, J. C. and Turbini, L. J., 1999, A product and process selection model with multidisciplinary environmental considerations. Operations Research, 47(2): 221-234.
Tseng, S. T., Yeh, R. H. and Ho, W. T., 1998, Imperfect maintenance policies for deteriorating production systems. International Journal of Production Economics, 55: 191-201.
Viswanathan, S., 1998, Optimal strategy for the integrated vendor-buyer inventory model. European Journal of Operational Research, 105: 38-42.
Vollmann, T. E., Berry, W. L. and Whybark, D. C., 1997, Manufacturing Planning and Control Systems, 4th edition (Boston: McGraw-Hill).
Wiese, H. and Zelewski, S., 2002, Waste disposal and waste avoidance. International Journal of Production Research, 40(14): 3391-3400.
Wu, J. W., Lin, C., Tan, B. and Lee, W. C., 2000, An EOQ inventory model with time varying demand and Weibull deterioration with shortages. International Journal of System Science, 31: 677-683.
Yang, P. C. and Wee, H. M., 2005, A win-win strategy for an integrated vendor–buyer deteriorating inventory system. Mathematical Modeling and Analysis, in Proceedings of the 10th International Conference MMA2005 and CMAM2, Trakai, 541-546.
Yee, M. J. and Veatch, M. H., 2000, Just-in-time policies for single-machine manufacturing flow controllers. IEEE Transactions on Automatic Control, 45: 336- 340.
|