|
[1]聯合國氣候變化綱要公約,“聯合國氣候變化綱要公約的京都議定書”,日本京都,1997年12月。 [2]聯合國氣候變化綱要公約,“巴黎協定”,美國紐約州,2015年12月。 [3]聯合國氣候變化綱要公約,“第26屆聯合國氣候變遷大會”, 蘇格蘭格拉斯哥,2021年11月。 [4]Tsang-Jung Chang a, Yu-Ting Wu a, Hua-Yi Hsu a, Chia-Ren Chu b, Chun-Min Liao a, “Assessment of wind characteristics and wind turbine characteristics in Taiwan” Renewable EnergyVolume 28, Issue 6, May 2003, Pages 851-871。 [5]Hwa Meei Liou, “Wind power in Taiwan: Policy and development challenges” Energy Policy Volume 39, Issue 6, June 2011, Pages 3238-3251。 [6]Hwa Meei Liou, “Overview of the photovoltaic technology status and perspective in Taiwan” Renewable and Sustainable Energy ReviewsVolume 14, Issue 4, May 2010, Pages 1202-1215。 [7]喬越實業股份有限公司,“太陽能”,新北市三重區,1995年。 [8]機電工程署能量之新及可再生能源,“太陽能光伏”,香港九龍灣啟成街,2023年。 [9]元太能源科技股份有限公司簡述與發展概說,“風力發電原理”,台中市北區中清路一段,2008年7月。 [10]中華民國工業技術研究院,“風力發電單一服務窗口-知識學習-設置考量-風力機配置”,台北市中山區,2017年8月。 [11]Wind energy database,“GE Energy 1.5se”,Atlanta, Georgia, United States,2002年。 [12]Wind energy database,“vestas_V47/660 kW”,Aarhus, Denmark,2000年2月。 [13]Wind energy database,“Enercon E70/2300 kW”, Aurich, Germany,2011年10月。 [14]Wind energy database,“Enercon E44/900 kW”, Aurich, Germany,2013年7月。 [15]Wind energy database,“Gamesa (Espagne) G80/2000kW”, Zamudio, Province of Vizcaya, Spain,2008年8月。 [16]友達光電,EcoDuo “AUO PM220P00 - Energy Matters”,新竹市東區,2011年。 [17]旺能光電,“Delsolar D6p240B3A - 250 W - DelSolar Co., Ltd.” ,台灣新竹科學園區,2011年。 [18]尚德電力,“SUNTECH STP280-24/vd - thaipowertech.com”,中華人民共和國江蘇省無錫市,2011年。 [19]明基友達集團-明基電通股份有限公司,“Green Triplex PM245P00 -Peeters Duurzaam”,台北市內湖區,2014年。 [20]太極能源科技,“Tainergy Tech TKSA-23001” ,桃園市中壢區,2011年7月。 [21]中華民國法規內容,“105年再生能源電能躉購費率計算公式及使用參數”,經濟部能源局,2015年12月。 [22]中央氣象局,“逐時平均風速及風向月報表”,臺北市中正區,2020年1月。 [23]政府資料開放平台,“台灣電力公司_風力及太陽光電發電量”,台灣電力公司,2015年7月。 [24]中華民國法規內容,“中華民國一百零九年度再生能源電能躉購費率及其計算公式”,經濟部能源局,2019年12月。 [25]中華民國法規內容,“中華民國一百一十年度再生能源電能躉購費率及其計算公式”,經濟部能源局,2021年1月。 [26]中華民國法規內容,“中華民國一百一十一年度再生能源電能躉購費率及其計算公式”,經濟部能源局,2022年1月。 [27]H. Oufettoul, N. Lamdihine, S. Motahhir, N. Lamrini, I. A. Abdelmoula and G. Aniba, “Comparative Performance Analysis of PV Module Positions in a Solar PV Array Under Partial Shading Conditions” in IEEE Access, vol. 11, pp. 12176-12194, 2023, doi: 10.1109/ACCESS.2023.3237250. [28]A. Mehiri, A. -K. Hamid and S. Almazrouei, “The Effect of Shading with Different PV Array Configurations on the Grid-Connected PV System” 2017 International Renewable and Sustainable Energy Conference (IRSEC), Tangier, Morocco, 2017, pp. 1-6, doi: 10.1109/IRSEC.2017.8477420. [29]Y. -K. Wu, G. -T. Ye and M. Shaaban, “Analysis of Impact of Integration of Large PV Generation Capacity and Optimization of PV Capacity: Case Studies in Taiwan,” in IEEE Transactions on Industry Applications, vol. 52, no. 6, pp. 4535-4548, Nov.-Dec. 2016, doi: 10.1109/TIA.2016.2594283. [30]C. -N. Wang, N. -A. -T. Nguyen, T. -T. Dang and J. Bayer, “A Two-Stage Multiple Criteria Decision Making for Site Selection of Solar Photovoltaic (PV) Power Plant: A Case Study in Taiwan,” in IEEE Access, vol. 9, pp. 75509-75525, 2021, doi: 10.1109/ACCESS.2021.3081995. [31]Chang-Chun Wang, Tai-Yu Wen, Wen-shing Lee and Tien-Shun Chan, “The current status of Taiwan's wind energy generation and its future,” 2010 International Conference on Optics, Photonics and Energy Engineering (OPEE), Wuhan, China, 2010, pp. 331-335, doi: 10.1109/OPEE.2010.5508115. [32]Y. -K. Wu, “High wind power penetration — A case study in Penghu Island,” 2014 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC), Hong Kong, China, 2014, pp. 1-6, doi: 10.1109/APPEEC.2014.7066135. [33]Li Wang, Chien-Hsiang Yu, Chuan-Chieh Yeh, Bing-Lin Kuan, Xiu-Yu Lu and A. V. Prokhorov, “Investigation into the measured power-quality results and special output-limitation outcomes at Taichung Power Plant's onshore wind farm in Taiwan,” 2017 IEEE/IAS 53rd Industrial and Commercial Power Systems Technical Conference (I&CPS), Niagara Falls, ON, Canada, 2017, pp. 1-9, doi: 10.1109/ICPS.2017.7945114. [34]M. . -C. Hsu, M. . -J. Chen, W. . -L. Huang and Y. . -J. Lin, “Simulating dynamic behavior of a grid-linked wind farm power system in Taiwan,”Proceedings of the 12th IEEE Mediterranean Electrotechnical Conference (IEEE Cat. No.04CH37521), Dubrovnik, Croatia, 2004, pp. 1029-1032 Vol.3, doi: 10.1109/MELCON.2004.1348229. [35]Q. -T. Phan, Y. -K. Wu and Q. -D. Phan, “An Overview of Data Preprocessing for Short-Term Wind Power Forecasting,” 2021 7th International Conference on Applied System Innovation (ICASI), Chiayi, Taiwan, 2021, pp. 121-125, doi: 10.1109/ICASI52993.2021.9568453. [36]P. -C. Chang and C. -M. Lai, “Wind resource analysis and optimization of offshore wind farm layout in the central Taiwan,” 2017 IEEE International Conference on Smart Grid and Smart Cities (ICSGSC), Singapore, 2017, pp. 126-131, doi: 10.1109/ICSGSC.2017.8038562. [37]Yuan-Kang Wu, Chun-Liang Lin, Bwo-Ren Ke, Yen-Kuei Huang and Kuen-Wei Hsu,“Development of an industrial forecasting tool in wind power,” 2010 5th IEEE Conference on Industrial Electronics and Applications, Taichung, 2010, pp. 614-619, doi: 10.1109/ICIEA.2010.5517036.
|