參考文獻
[1] Aamodt, A., E. Plaza, “Case-Based Reasoning: Foundational Issues, Methodological Variations, and System Approaches,” Artificial Intelligence Communications, Vol. 7:1, pp.39-59, 1994.
[2] Madureira, A., C. Ramos, and S.C. Silva, “A Genetic Approach to Dynamic Scheduling for Total Weighted Tardiness Problem,” PLANSIG’99 (18th Workshop of the UK Planning and Scheduling Special Interest Group), Manchester (UK), 1999.
[3] Madureira, A., C. Ramos, and S.C. Silva, “A Genetic Approach for Dynamic Job-Shop Scheduling Problem,” 4th Metaheuristics International Conference, 2001.
[4] Break, K. R., Introduction to Sequencing and Scheduling, John Wiley, New Youk, 1974.
[5] Suresh, C., R. Traub, R. Uzsoy, “An iterative heuristic for the single machine dynamic total completion time scheduling problem,” Computers and Operations Research, Vol.23, No.7, pp.641-651, 1996.
[6] Chandra, R., “On n/1/F Dynamic Deterministic System,” Naval Research Logistics Quarterly, Vol. 26, pp.537-544, 1979.
[7] Deogun, J. S., “On shcduling with Ready Time to Minimize Mean Flow Time,” The Computer Journal, Vol. 26, No 4, pp.320-328, 1983.
[8] Dessouky, M. I., and J. S. Deogun, “Sequencing jobs with unequal ready times to minimize mean flow times,” SIAM Journal Computing, Vol. 10, pp.192-202, 1981.
[9] Hariri, A. M. A., and C. N. Potts, “An Algorithm for Single Machine Sequencing with Release Dates to Minimize Total Weighted Completion Time,” Discrete Applied Mathematics, Vol 5, pp. 99-103, 1983.
[10] Igor, J., J. Mylopoulos, J. Glasgow, H. Shapiro, and R. F. Casper, “Case-Based Reasoning in IVF: Prediction and Knowledge Mining,” Artificial Intelligence in Medicine, pp.1-14, 1998.
[11] Job, D., V. Shankararaman, and J. Miller, “Combining CBR and GA for Designing FPGAs,” Third International Conference on Computational Intelligence and Multimedia Applications, New Delhi, India, pp. 133, 1999.
[12] Kempf, K. G., C. L. Pape, S. F. Smith, and B. Fox, “Issues in the design of AI-based schedulers: Workshop report,” Artificial Intelligence Magazing, pp.37-46, 1991.
[13] Kotono, P., “SMART plan: A case-based resource allocation and scheduling system,” Proceedings of the Case-Based Reasoning Workshop, Pensacola, FL, pp. 285-294, 1989.
[14] Leake, D. B., Case-Based Reasoning: experiences, lessons, and future directions, MIT Press, Massachusetts Institute of Technology, Cambridge, Massachusetts and London, England, 1996.
[15] Lenstra, K. J., A. H. G. Rinnooy, and P. Brucker, “Complexity of Machine Scheduling Problems,” Annals of Discrete Mathematics, pp. 343-362, 1977.
[16] Liu, J., and B. L. MacCarthy, “Effective heuristic for the single machine sequencing problem with ready times,” International Journal of Production Research, Vol. 29, pp.1521-1533, 1991.
[17] Louis, S. J., and Z. Xu, “Genetic Algorithms for Open Shop Scheduling and Re-Scheduling,” In Proceedings of the ISCA 11th International Conference on Computers and Their Applications, pp. 99-102, 1996.
[18] Louis, S. J. and L. Gong, ” Genetic Algorithms with Memory for Traveling Salesman Problems”, 1997.
[19] Miyashita, K., “Case-based knowledge acquisition for schedule optimization,” Artificial Intelligence in Engineering, 1995.
[20] Munoz, A., H., J. A. Hendler, and D. W. Aha, “Conversational Case-based Planning,” Review of Applied Expert Systems 5, pp.163-174, 1999.
[21] Murata, T. and H., Ishibuchi, and H., Tanaka, “Genetic Algorithm for Flowshop Scheduling Problem,” International Journal of Computers and Industrial Engineering, 30, pp.1061-1071, 1996.
[22] Oman, S. and P. Cunningham, “Using Case Retrieval to Seed Genetic Algorithms”, International Journal of Computational Intelligence and Applications, Vol. 1, No. 1, 2001, pp71-82.
[23] Ramsey, C., and J. Grefensttete, “Case-based initialization of genetic algorithms,” Proceeding of the Fifth International Conference on Genetic Algorithms, San Mateo, California, 1993.
[24] Schank, R., Dynamic Memory: A Theory of Learning in Computers and People, New York: Cambridge University Press, 1982.
[25] Schmidt, G., “Case-based reasoning for production scheduling,” International Journal of Production Economics, 1998.
[26] Sheppard, J. W., and S. L. Sakzburg, “Combining genetic algorithms with memory based reasoning,” Proceedings of the Sixth International Conference on Genetic Algorithms, San Mateo, California, 1995.
[27] Suh, M. S., W. C. Jhee, Y. K. Ko, and A. Lee, “A case-based expert system approach for quality design,” Expert Systems With Applications 15, pp.181-190, 1998.
[28] Symth, B., “Constructing Competent Case based Reasoners: Theories, Tools and Techniques,” Proceedings of the Workshop on Automating the Construction of Case Based Reasoners, Stockholm, Sweden, 1999.
[29] Ting, C. K., S. T. Li, and C. N. Lee, “TGA: A New Integrated Approach to Evolutionary Algorithms”, Congress on Evolutionary Computation (CEC2001), pp.917-924, 2001.
[30] Watson, I., and F. Marir, “Case-Based Reasoning: A Review,” Knowledge Engineering Review, Vol.9, No.4, 1994.
[31] Xu, L. D., “An integrated rule- and case-based approach to AIDS initial assessment,” International Journal of Bio-Medical Computing, 1996.
[32] 邱竣鋒,「利用模擬退火法及塔布搜尋法求解工件非同時到達之單機排程問題」,私立元智大學工業工程與管理研究所,碩士論文,民國八十七年。[33] 徐慧君,「應用案例式推理於顧客關係管理之行銷研究-以化妝品業為例」,私立元智大學工業工程與管理研究所,碩士論文,民國九十一年。[34] 陳振男,「非同時到達工件之單機排程-以總加權完工時間最小為目標」,私立元智大學工業工程與管理研究所,碩士論文,民國八十三年。[35] 謝日章,「柔性計算於生產管理之應用」,私立元智大學工業工程與管理研究所,博士論文,民國九十一年。